IR 05000412/1987033

From kanterella
Jump to navigation Jump to search
Insp Rept 50-412/87-33 on 870421-23.No Violations Noted. Major Areas Inspected:Emergency Preparedness Items from Emergency Preparedness Implementation Appraisal.Corrective Actions Verified as Complete on 6 of 26 Items for Operation
ML20214J678
Person / Time
Site: Beaver Valley
Issue date: 05/15/1987
From: Fox E, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20214J657 List:
References
50-412-87-33, NUDOCS 8705280156
Download: ML20214J678 (6)


Text

.-

.

-

--.

.

]

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No.

50-412/87-33 Docket No.

50-412 License No.

CPPR-105 Priority Category B-1

-

Licensee: Duquesne Light Company

Post Office Box 4

,

Shippingport, Pennsylvania 15077

!

Facility Name:

Beaver Valley Power Station Inspection At:

Shippingport, Pennsylvania 15077 Inspection Conducted: April 21-?J, 198],

/

Inspectors:

J

,

E.

r{ Specialist, date md N/f/07 Approved by:

?

W.

Lazarus, Chief Emergency /

'datt i

paredness Section,. EP & RPB

. Inspection Summary:

Inspection conducted on April 21-23, 1987 (Report No. 50-412/87-33)

Areas _ Inspected: Announced follow-up inspection of emergency preparedness items from the Emergency Preparedness Implementation Appraisal (EPIA) performed March 2-6, 1987 (Report No. 50-412/87-14) to evaluate the adequacy and effec-tiveness of the emergency preparedness program for Beaver Valley Unit 2 and the integration of the Unit 2 program into the overall site emergency preparedness program.

Results: No violationswere identified. Corrective actions were verified as

'

being complete on six of 26 items required for either fuel load, low power or full power operation. The remaining open items identified in Report No. 87-14 need to be addressed by the licensee and verified as being complete in a sub-i sequent inspection.

Section 4 of this report provides a summary listing of those items along with the determination of whether the item is required to be corrected prior to fuel load, criticality, low power or full power operations.

0

...

-

.

.

.

.

.-

- -.

,

. -

.-.

.

.

-

.

.

.

DETAILS 1.0 Persons Contacted

  • W. Mahan, Senior Planner A. Morabito, Manager Nuclear Training
  • G. McKee, Emergency Planning Specialist
  • H. Szklinski, HP Specialist The inspectors also interviewed other licensee employees.
  • Denotes those present at exit interview.

'

2.0 Scope of the Inspection During the period March 2-6, 1987, the NRC conducted an appraisal of the state of emergency preparedness at the Beaver Valley Unit 2 Station. As a result of this appraisal, the NRC identified 26 significant items requiring resolution in order for the licensee to achieve an adequate state of emergency preparedness.

These findings were transmitted to the licensee by letter dated April 29, 1987, with Inspection Report No.

50-412/87-14 enclosed.

The purpose of this inspection was to review the status of the licensee's actions on those items in need of corrective action prior to fuel load.

3.0 Summary of Results This report documents the follow-up of the areas for which review was

,

completed during the previous inspection.

Items which are closed and I

were listed as open items in the previous appraisal inspection report are addressed below.

Items which remain open and need to be addressed in a subsequent inspection are listed in Section 4.

(Closed)(50-412/87-14-01)

Develop and Conduct Training with Unit 2 Specific Emergency Preparedness Lesson Plans.

The inspectors interviewed training representatives and reviewed Revision 4, dated April 6, 1987, to the lesson plan for Emergency Director training and determined that specific Unit 2 Lesson Plans had been revised to include site specific information and were being used in the Emergency Preparedness Training Program.

1

l

.

-

.

,

.

.

'

(Closed) (50-412/87-14-03)

,

Table Top Exercise as presented in Course 9251 should be given to Emergency Director, SR0 Candidates and. Emergency / Recovery Managers.

The inspectors reviewed the curriculum for the Emergency Director, SR0 Candidates and the Emergency / Recovery Managers and determined that practical exercise (s) were now included in the course and were

<

being provided to the aforementioned emergency response personnel.

.

(Closed)(50-412/87-14-06)

Place updated and controlled copies of the EP and EPIP's in the Unit 2 Control Room.

The inspectors toured the Unit 2 Control Room (which was still under construction at the time of this inspection), and verified that updated and controlled copies of the Emergency Plan and Emergency Plan Implementing Procedures were placed in the Shift Supervisor's office of the Unit 2 Control Room.

i

(Closed) (50-412/87-14-16)

Obtain the equipment identified on the " Radiological Control Depart-ment, EPP Punch List, Open Items" list which the licensee has required for the emergency preparedness program.

The inspectors reviewed the updated list of equipment dated April 20, 1987 and determined that most equipment had been obtained and was available in a secured warehouse. The licensee stated that lockers and cabinets for storage of equipment would be installed in each emergency response facility prior to fuel load.

(Closed) (50-412/87-14-20)

Complete the training of additional station personnel for the over-view, inspection, and repair of the DRMS.

The inspectors reviewed the training records and verified that station personnel had been trained for the overview inspection and repair of the digital radiation monitoring system.

(Closed) (50-412/87-14-23)

Complete and issue the Emergency Plan Implementing Procedures I-1, IP 1.2, IP 2.6, IP 2.6.1, and'IP 2.7.

The inspectors verified that t

the Emergency Plan Implementing Procedures had been completed and

issued on March 27, 1987. There were minor items identified during the procedure review and these were discussed with licensee emergency

'

preparedness staff who agreed to implement them in future revisions.

,

.-

. -...

.

..

-.

,

- -.

, - -. -

.

.... _ _ -

.-

,

.. _

.-

-

.

.

.

.

4.0 Summary and Listing of Remaining Open Item

,

a.

During the appraisal follow-up, it was determined that several open items remained which require licensee action prior to fuel load.

,

These are:

(50-412/87-14-05)

-

Complete the construction of Unit 2 Control Room to include:

Install an operable dedicated line telephone system

between Unit 2 Control Room, TSC and E0F;

,

Install connections for headset and direct phone for communications; Remove wall between shift supervisors' offices of Unit 1 and Unit 2 Control Room; and Remove wall and install separation and access doors between Unit 1 and Unit 2 Control Room.

,

(50-412/87-14-07)

-

.

Provide respiratory protection equipment and protective-

!

clothing for those persons of the Unit 2 Control Room who

are members of the Fire Brigade.

(50-412/87-14-09)

d

-

Complete the installation and acceptability testing of the Safety Parameter Display System (SPDS).

j

-

(50-412/87-14-10)

!

Complete the functionality portion of the card reading /

personnel accountability system.

(50-412/87-14-17)

-

-

Complete the installation, operations testing and calibration, and turn-over of the Digital Radiation Monitoring System (DRMS).

-

(50-412/87-14-18)

Complete the development and issuance of procedures for calibration of instruments and monitors as well as a

,

schedule for the calibration of the DRMS.

l

,

,

-

_

- - -.-

,

-..-,

., -. - -....

--

--

_

-n,,,

..,,

,

- ~ -

.

. -...

.. -

.

.

..

-

-

J

-

,

t-e

.

.

1

-

(50-412/87-14-19)

,

Complete the certification of the operating conditions for i

the detectors in the DRMS.

(50-412/87-14-21)

-

Complete the installation of equipment in Unit 2 Control

Room for required.NRPM readouts.

-

(50-412/87-14-22)

Complete the installation testing and turnover of standby

,

and evacuation alarms.

-

<

-

(50-412/87-14-24)

Complete and specify the primary assembly areas for Unit 2.

b.

In addition to those items in a. above, the following emergency

,

preparedness open items remain which require licensee action prior j

to criticality and low power.

-

(50-412/87-14-04)

Complete the training for shift personnel on the Emergency Plan Implementing Procedures.

c.

In addition to those items in a and b above, the following emergency preparedness open items require licensee action prior to full power:

-

(50-412/87-14-02)

!

Complete shift Technical Advisor Training / Qualification.

(50-412/87-14-08)

-

Place as-built drawings for Unit 2 in the ERF records room.

.

(50-412/87-14-11)

-

Complete the marking and equipping of the assembly area locations within the exterior of.the first floor of the engineering building (currently the S&W Engineering q

Building).

-

(50-412/87-14-12)

Provide for access to appropriate keys to offsite assembly areas.

l

i

. _ _. -,,

-

,

--

- - - - -. -

-,- _ - -. - _ - - -

~

--

-

- - - -, -.

...

..

.. - -

.

.-

_

,.

.

?

-

(50-412/87-14-13)

Acquire an acceptable offsite assembly area (facility) in lieu of the Kennedy Corner facility.

(50-412/87-14-14)

-

Provide procedures and equipment for decontamination at remote assembly areas.

-

(50-412/87-14-15)

Complete the construction of the Unit 2 storage area.

(50-412-87-14-25)

-

Complete and issue procedures which reference specific health physics procedures for radiological monitoring during evacuations.

-

(50-412/87-14-26)

Complete and issue the integrated Security / Emergency Plan and Implementing Procedures for_ Unit 1 and Unit 2.

5.0 Exit Interview At the conclusion of the inspection April 27,- 1987, the inspectors met with representatives of the licensee (see Detail 1 for attendees) to discuss the findings of this inspection as detailed in this report.

At no time during this inspection was any written material provided to the licensee.

,

!

,

i 1