Informs of Individual Exam Result on Initial Retake Exam Conducted on 990322-25 at Licensee Facility.Three Individuals Were Administered Exam & All Three Passed. Forwards Encl Re Exam.Without Encl
ML20205K090
Person / Time
Site: Beaver Valley
Issue date: 04/05/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lindsey R
DUQUESNE LIGHT CO.
References
NUDOCS 9904120325
Download: ML20205K090 (2)


Text

\\

l April 5, 1999 Robert W. Lindsey Director - Operations Training Duquesne Light Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077

Dear Mr. Lindsey:

The purpose of this letter is to inform you of the individual examination result for your applicant on the initial retake examination conducted on March 22-25,1999, at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Three individuals were administered the examination and three passed. This information is considered to be " proprietary" in accordance with 10 CFR 2.700 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator 1.icense Examination Report, (NRC Form 157) for the applicant. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this informatior to your facility by signing Block 19A of NRC Form 398. is a copy of the licens'es issued.

Thank you for your cooperation in this matter. Pleau refer any questions you have to me at 610-337-5183.

Sinc

  • rely, Original signed by Richard J. Conte, Chief g

g41 gob bg 2 Human Performance and T

g V

PDR Emergency Preparedness Branch b

i i

Division of Reactor Safety Docket No. 50-412 0FFICIAL RECORD COPY

Robert W. Lindsey

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Exarnination Results
3. Licenses cc w/o encis:

K. Ostrowski, Div. Vice President - Nuclear Operations and Plant Manager PUBLIC bec w/o encls:

Master Exam Fi'e d

DOCUMENT NAME: A:\\bvnoltr,wpd To receive a copy of this document. Indicate in the box: "C" = Co)y without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE RI/DRS

/

l RI/DRS,

RI/DRS

/[__ _ (1/3/tf l(C l

3 V Briggs f ff/

Conte //)/

84wra:=);O NAME Curley DATE 04/05/99 04/(/99 04/7/99 04/f /9 9 04/