ML20237D751

From kanterella
Revision as of 15:45, 19 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Revised Fire Protection Safety Evaluation Updating 861118 Draft Safety Evaluation.Some Items Remain Open for Verification Through Insp.Util Up List of Completed Fire Protection Mods Acceptable
ML20237D751
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/18/1987
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20237D754 List:
References
TAC-54373, NUDOCS 8712240165
Download: ML20237D751 (3)


Text

__ ._ _- _ - _ _ -

y 7< December 18,1987 '

f 1

.( .ik

' Docket No. 50-267'

~

Mr. Ri 0. Williams, Jr.

Vice-President, Nuclear.0perations- .!

u- cPublic Service Company of Colorado 'l

.P. O. Box 840 i

Denver,
Colorado. 80201-0840

(

Dear Mr.' Williams:

SUBJECT:

' REVISED FIRE PROTECTION SAFETY EVALUATION FOR COMMENT <

'(TAC NO 54373)

We have reviewed your comments on'our earlier draft fire protection safety'-

. evaluation (SE) dated November l18, 1986. Your. comments were submitted by letter dated-January 16, 1987-(P-87013)._ Additionally, we have updated the SE to-reflect certain changes you have proposed to your post-fire safe shutdown

.model,-as described in your letter dated May 15, 1987 (P-87167).- Our revised

. SE is enclosed for your ' comments, i As noted in the SE, a number of items are left-open for-verification through.

inspection. The inspection of these items will be scheduled separately, but i

'you are responsible'for maintaining these items in an-acceptable condition.

1 We have also held a-number of discussions with your staff concerning the

~

listing of-fire protection modifications yet to be completed. The most recent update of this list is your submittal dated April.29, 1987 (P-87160). We. find

~it acceptable for you to modify this list and inform the Commission at regular-

. intervals of your changes. However, the overall goal of completing all fire protection modifications by startup following the fourth refueling should not be compromised.

We request you provide'your final comments within.60 days ~of'the date of this letter. The information requested in this letter affects fewer than 10 respondents; therefore, OMB clearance.is_not required under.P.L.96-511.

Sincerelyh, \

Kenneth L. Heitner, Project Manager 8712240165 B71218 Project Directorate - IV PDR ADOCK 05000267 "4'

F PDR Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc"w/ enclosure:

See next page

. DISTRIBUTION IDockettM]ed) NRC PDR Local PDR PD4 Reading DR4A= J., Calvo .P. Noonan K. Heitner j

'OGC-Bethesda. E. Jordan .J. Partlow ACRS (10)

-PD4 Plant File.

  • See pr vious concurrence:

PD4/PM g H p 'PD4/LA PNoonan Q KHeitner: sr PD4/D /b

.JCalvo-RIV*

RIreland 11J%/87' 1T/I$/87~ 11////87 12/4/87

___._-___m._ __2 . _ ____-__i.__.____________.____________.___-______._____m___

A s

Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

REVISED DRA FIRE PROTECTION SAFETY EVALUATION Fw'. c e n t)E r,t r 7 (TAC N0. 54373)

We have reviewed your comments on our earlier d fire protection safety evaluation (SE) dated November 18, 1986. Your comments were submitted by letter dated January 16, 1987 (P-87013). Additionally, we have updated the SE to reflect certain changes you have proposed to your post-fire safe shutdown mcdel, as described in your letter dated May 15, 1987 (P-87167). Our revised SE is enclosed for your comments.

As noted in the SE, a number of items are left caen for verification through inspection. The inspection of these items will ae scheduled separately, but you are responsible for maintaining these items in an acceptable condition.

We have also held a number of discussions with your staff concerning the listing of fire protection modifications yet to be completed. Tite _m01t_.ER.C#nt_ g update of this list is your submittal dated April 29, 1987 (P-87160). We fiMf A it acceptable for you to modify this list and inform the Commission at regular intervals of your changes. However, the overall goal of completing all fire protection modifications by startup following the fourth refueling should not be compromised.

We request you provide your final comments within 60 days of the date of this letter. The information requested in this letter affects fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading DR4A J. Calvo P. Noonan K. Heitner 0GC-Bethesda E. Jordan J. Partlow ACRS (10)

PD4 Plant File

%M <~~ a PD4/LA PD4/PM PD4/D 8GH n ~X .1 k:t w PNoonan KHeitner: sr JCalvo R.I n im,d - aWI s1 11/ /87 11/ /87 11/ /87

1 l .

' . .A \

l 1

- Mr. R. O. Williams, Jr.

Public Service Company of Colorado Fort St. Vrain l

cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue l P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 I

Mr. David Alberstein, 14/159A Mr. R. O. Williams, Jr., Acting Manager l Nuclear Production Division j GA Technologies, Inc.

Post Office Box 85608 Public Service Company of Colorado {'

San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Quality Assurance Division {

.Public Service Company of Colorado 3 P. O. Box 840 Public Service Company of Colorado j Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Commitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413

_ _ _ _ _ _ _ _ _ _ - _ _ _ . . _ _ _ _ _ __ _