Other: ML20087D526, ML20091E427, ML20091E667, ML20096C267, ML20101P455, ML20101T673, ML20128N324, ML20128Q523, ML20132D461, ML20133E065, ML20133G264, ML20134E393, ML20135B283, ML20137G089, ML20137M414, ML20138M184, ML20141G663, ML20141P193, ML20148G166, ML20149E148, ML20155G379, ML20197B758, ML20198D937, ML20202F052, ML20204G480, ML20205D265, ML20206B182, ML20207E030, ML20207Q913, ML20209C232, ML20211G583, ML20212M102, ML20214P255, ML20214P273, ML20214S958, ML20214U381, ML20214U731, ML20214X272, ML20215G796, ML20215L534, ML20216D570, ML20216E230, ML20235F214, ML20235G486, ML20236C261, ML20236G303, ML20236H463
|
MONTHYEARML20087D5261984-03-0202 March 1984 Requests Exemption from Requirements of Sections Iii.G,J,L & O to 10CFR50,App R.Fire Protection Provisions Believed Adequate to Protect Health & Safety of Public in Event of Accidents Involving Fires.Affidavit Encl Project stage: Other ML20091E6671984-05-10010 May 1984 Forwards List of Correspondence on Fire Protection,Per 840427 Request.List Identifies Ltrs Originated from NRC & Util Relevant to Fire protection,10CFR50,App R,Branch Technical Position 9.5-1,cable Separation & Plant Issues Project stage: Other ML20091E4271984-05-11011 May 1984 Forwards Summary of Fire Protection Review to Determine Conformance of Facility to Section Iii.G of 10CFR50,App R, Per 840427 Commitment.Fire Protection Provisions Adequate Project stage: Other ML20092M5471984-06-22022 June 1984 Responds to 840608 Meeting Re Application of 10CFR50,App R Fire Protection Requirements to Facility.Schedule for App R Review & Submittal & Proposed Fire Protection Regulatory Guidance Resolving HTGR Issues Encl Project stage: Meeting PNO-IV-84-014, on 840623,reactor Tripped on High Pressure Signal & 6 of 7 Control Rod Pairs Failed to Drop.Cause Unknown.Drive Mechanisms Will Be Removed for Exam1984-06-25025 June 1984 PNO-IV-84-014:on 840623,reactor Tripped on High Pressure Signal & 6 of 7 Control Rod Pairs Failed to Drop.Cause Unknown.Drive Mechanisms Will Be Removed for Exam Project stage: Request ML19318H9481984-06-26026 June 1984 Summary of 840608 Meeting W/Util in Bethesda,Md Re Fire Protection Issues at Plant.List of Attendees & Meeting Agenda Encl Project stage: Meeting ML20090C5261984-07-0606 July 1984 Responds to NRC Concerns Re Fire Protection Review,Bldg 10 Licensing Requirements,Control Rod Failure to Scram, Documentation of Disciplinary Actions,Clearance Tags & Radiological Emergency Exercise Scenario,Per 840625 Meeting Project stage: Meeting ML20096C2671984-08-17017 August 1984 Forwards Revised Schedule for App R Review,Submittals,Plant Mods & Fire Protection Safe Reactor Shutdown/Cooldown Capability Incorporating NRC Concerns & Comments Project stage: Other ML20101P4551984-12-14014 December 1984 Advises That Final Installation of Oil Mist Detection Sys Completed Wk of 841105,per 840625 Commitment.Sys Inoperable During Initial Checkout.Manufacturer Repaired & Balanced Entire Sys on 841115,however,on 841121 Sys Inoperable Again Project stage: Other ML20101T6731985-01-25025 January 1985 Forwards Table 5.0.1,omitted from Rept 3 of App R Fire Protection Evaluation,Originally Submitted by Project stage: Other ML20128Q5231985-05-15015 May 1985 Responds to Re Contradictory Statements Submitted in Three Util Ltrs.Circulator Speed Instruments Not Relied Upon in 10CFR50,App R,Re Fire Protection Evaluation Because of Close Proximity Between Loops Project stage: Other ML20128N3241985-05-17017 May 1985 Informs of Completion of Mod Work to Automate G&J Wall Sprinkler Sys,Per 840817 App R Commitment Project stage: Other ML20132D4611985-07-11011 July 1985 Documents 850708 Telcon Re Interim Fire Protection Measures Committed to in or Lee .Fire Watch Frequency Increased.Personnel Will Carry Flashlights at All Times Per Operating Order 85-11,prior to Plant Startup Project stage: Other ML20133G2641985-07-16016 July 1985 Documents 850715 Telcon Re App R Fire Protection Evaluation Schedule.Util Will Complete Mod Item 4.2 Re Penetration Seals by 850717.Revised Completion Date Allows for Installation of Final Seal,Surveillance Testing & Sign Offs Project stage: Other ML20132F0721985-07-19019 July 1985 Safety Evaluation Documenting Deficiencies in Licensee Program for Environ Qualification of Electric Equipment Important to Safety.Licensee Response to Generic Ltr 84-24 Inadequate.However,Operation at 15% Power Authorized Project stage: Approval ML20132F0231985-07-19019 July 1985 Forwards Safety Evaluation Re Environ Qualification of Electric Equipment Important to Safety & Authorizes Interim Operation in dry-out Mode at Max 15% of Rated Power,Based on Listed Conditions,Until Technical Review Completed Project stage: Approval ML20133H5331985-08-0202 August 1985 Requests Assessment of Consequences of Loss of Shutdown Sys Due to Fire in Bldg 10,as Part of Review of Fire Protection Features at Plant.Evaluation Requested within 30 Days of Ltr Date Project stage: Approval ML20134E3931985-08-0505 August 1985 Submits Info on Status of Mods Proposed in 850401 Rept 4 Re Exemptions & Mods to App R Fire Protection Evaluation.Listed Mods Complete Project stage: Other ML20137G0891985-08-0808 August 1985 Notifies of Delay in Obtaining All Replacement Fire Door Matls,Per ,Due to Door to Hardware Compatibility Problems W/Facility Security Sys.Matls Will Be Delivered by 851015 Project stage: Other ML20135B2831985-08-30030 August 1985 Provides Info to Resolve Questions & Concerns Identified in Review of Repts 1-4 for App R Evaluation & Rept 5 for Branch Technical Position 9.5-1,App a Evaluation of Bldg 10.Page Changes for Repts 1-5,incorporating Resolutions,Encl Project stage: Other ML20205D2651985-09-0303 September 1985 Informs of Fire Detection Sys Design Status.Initial Change Notice Providing Detection Device Design & Location Issued on 850901,per 850401 Commitment.Installation Expected by 860201 Project stage: Other ML20133E0651985-09-10010 September 1985 Responds to NRC Re Violations Noted in Insp Rept 50-267/85-16.Corrective Actions:Design for New Storage Ctr Initiated Project stage: Other ML20138M1841985-10-14014 October 1985 Clarifies Commitment Dates in Util Re Proposed Mods Per 10CFR50,App R Fire Protection Evaluation.Remaining Mods Expected to Be Completed During Refueling Outage Project stage: Other ML20136J3161985-11-0101 November 1985 Forwards Questions Re Manual Operations & Instrumentation Based on Review of 841116-1217 & 850117 & 0401 Submittals of App R Safe Shutdown Models.Addl Info Requested within 30 Days of Ltr Receipt Project stage: Approval ML20138P3311985-12-20020 December 1985 Forwards Response to 851101 Request for Addl Info Re App R Safe Shutdown Model.Steps Included in Fire Protection Shutdown Procedure for Operators to Properly Position motor- Operated Valves Project stage: Request ML20137M4141986-01-21021 January 1986 Informs of Updated Efforts to Implement Fire Detection Sys. Completion Anticipated by 860601.As Result of extension,24 H Fire Watch Will Continue as Stated in Interim Measures of Rept 4 Project stage: Other ML20141P1931986-03-14014 March 1986 Forwards Info/Clarification for Open Items & Revised App R Fire Protection Evaluations (Repts 1-4) & Fire Hazards Analysis & Evaluation of Bldg 10 (Rept 5) Project stage: Other ML20202F0521986-04-0404 April 1986 Forwards Valve Position & Alignment Justification & Revs to App R Repts 1 & 3 Incorporating Manual Pressurization Sys for Helium Circulator Brake & Seal Sys Into Shutdown Model, Per 860314 Commitment Project stage: Other ML20141G6631986-04-17017 April 1986 Requests Util Evaluate Encl NRC 851222 Press Release Re New Criteria for Granting Exemptions from 10CFR50 to Determine If Exemptions from App R Fire Protection Requirements Still Required.Info Requested within 60 Days Project stage: Other ML20155G3791986-04-28028 April 1986 Requests That 850401 Exemption from Sections Iii.G & Iii.J of App R & 10CFR50.12(a) Re Fire Protection Be Granted.List of Exemptions Encl Project stage: Other ML20198D9371986-05-15015 May 1986 Forwards App R Evaluation Re Valve Position & Alignment,As Encl to Walker ,Per Request Project stage: Other ML20202G6441986-07-10010 July 1986 Informs of Plans to Submit Documentation Re Results of CRD Improvements Integrated Sys Study by 860815.Requests NRC Confirmation of Submittal Date Project stage: Request ML20207F3771986-07-15015 July 1986 Forwards Supplemental Info to 860314 & 0404 Submittals Re Local Manual Operations Required for Fire in Each Area & Assessment of Adequacy of Present Staffing Levels to Accomplish Fire Protection Shutdown Project stage: Supplement ML20204C1671986-07-22022 July 1986 Responds to 860428 Request for Exemption from Fire Protection Requirements,Per 10CFR50.12.Although Technical Review Not Completed,Submittals Adequately Address Criteria. Request for Relief from 10CFR50.48 Cannot Be Acted Upon Project stage: Approval ML20204G4801986-07-31031 July 1986 Informs That 860710 Request for Delay of Submittal of Integrated Sys Study Until 860815 Acceptable.Revised Listing of Commitments,Updated to Reflect Completion of Items 11 & 16b,encl Project stage: Other ML0311502641986-08-20020 August 1986 Withdrawn NRC Generic Letter 1986-014: Operator Licensing Examinations Project stage: Request ML20212N4711986-08-26026 August 1986 Forwards Safety Evaluation Approving Util 850401 Exemption Requests from Requirements in 10CFR50.40 & 10CFR50,App R, Section Iii.J Re Emergency Lighting Project stage: Approval ML20212N4761986-08-26026 August 1986 Safety Evaluation Approving Licensee 850401 Exemption Request from Requirements in 10CFR50,App R,Section Iii.J Re Emergency Lighting Project stage: Approval ML20214S9581986-09-25025 September 1986 Requests That Util Take Listed Actions Re Three Repts Submitted Concerning Firewater Cooldown Analysis,Per NRC Review & 860917 Telcon.Response to Item 1 Requested within 15 Days of Ltr Date & Item 2 at Time Analysis Submitted Project stage: Other ML20215G7961986-10-10010 October 1986 Advises That Info Requested in NRC Re Best Estimate Schedule for Resolution of Problems Encountered W/Firewater Cooldown Analysis Will Be Submitted as Part of Util Graduated rise-to-power Program Project stage: Other ML20197B7581986-10-16016 October 1986 Notifies of Development of Fire Protection Program Plan at Plant in Accordance W/Requirements of 10CFR50.48(a),per 860314 Commitment.Plan Includes Updated Fire Hazards Analysis for Each Plant Fire Area Project stage: Other ML20211G5831986-10-22022 October 1986 Anticipates Completion of Steam Generator Analysis & App R Modeling Reanalysis Work by Feb 1987,per 860918 Telcon W/Nrc Re Steam Generator Cool Down Studies for App R Project stage: Other ML20215L5341986-10-23023 October 1986 Staff Requirements Memo Re Commission Briefing in Washington,Dc on Status of Facility Project stage: Other ML20214G1411986-11-18018 November 1986 Draft Safety Evaluation Supporting Util 850401 Request for Exemption from 10CFR50,App R Requirements Re Fire Protection & Proposed Safe Shutdown Sys.Related Info Encl Project stage: Draft Approval ML20214G1091986-11-18018 November 1986 Forwards Draft Fire Protection Safety Evaluation Supporting Util 850401 Request for Exemption from 10CFR50,App R Requirements & Proposed Safe Shutdown Sys.Status Rept on Listed Items & Comments Re Draft Evaluation Requested Project stage: Draft Approval ML20214P2551986-11-20020 November 1986 Forwards Updated & Condensed Version of Const Schedule for Proposed App R Mods,Per Request Project stage: Other ML20207E0301986-12-29029 December 1986 Forwards Corrected Schedule of Proposed App R Mods Noted in .Mod Re Emergency Lighting Will Be Completed,As Discussed in 860826 Ser,Within 12 Months Following NRC Approval Project stage: Other ML20235J4001987-01-16016 January 1987 Forwards Comments on Draft Fire Protection SER Project stage: Draft Other ML20209C2321987-01-23023 January 1987 Advises Util to Complete App R Mods to Facility Expeditiously.Staff Considers Dates in 861120 & 1229 Ltrs as Commitments.Nrc Considering Rev to Listing of Util Commitments Re Operation of Facility Project stage: Other ML20207Q9131987-02-27027 February 1987 Requests Concurrence to Reduce Roving Fire Watch,Committed to in Util ,To Hourly Fire Watch for Turbine Water Removal Pumps Effective on 870325.New Fire Detection Sys Described in Util Installed Project stage: Other 1985-09-03
[Table View] |
Text
_ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _
?
f[
o UNITED STATES l
F
'g NUCLEAR REGULATORY COMMISSION o
M WASHINGTON, D. C. 20555 e
November 18, 1986 o
Docket No. 50-267 Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
DRAFT FIRE PROTECTION SAFETY EVALUATION (SE) FOR FORT ST. VRAIN (FSV)
We have completed our review of your submittals concerning fire protection at FSV. A detailed listing of these submittals is provided in our enclosed draft SE. These submittals discussed in detail your proposals for bringing
\\
FSV into compliance with 10 CFR Part 50, Appendix R.
Specific guidance for FSV had been provided by the NRC in our letter of June 4,1984.
Your submittals also evaluated the fire protection features for Building 10 against the guidelines of Appendix A to Branch Technical Position APCSB 9.5-1.
We have reviewed these evaluations. Previous evaluations concerning fire protection at FSV are given by License Amendments Nos.14 and 21 (dated June 18, 1976 and June 6, 1979 respectively).
The enclosure to this letter contains a final draft of our SE on your submittals.
(A portion of this draft SE concerning emergency lighting has been previously sent to you by letter dated August 20,1986.) We are providing this draft SE for your comments to assure that the basis for our approval of your design and requested exemptions is correct. Please provide your comments to us ir writing within 60 days of the date of this letter.
Please note that there are several items in this evaluation which will be closed out during on-site inspections. The NRC's inspection program is described in Section B of Generic Letter 86-10, dated April 24, 1986.
This draft SE contains four open items, as summarized in Section 4.3.
Please provide the additional information required to close these items when
~
you provide your comments as requested above.
Furthermore, in order for the staff to determine the status of the plant relative to compliance with 10 CFR Part 50, Appendix H, you are r.equested to provide a status report containing the following information:
- Status of the relate.1 modifications and schedule for their completion,
- Status of the revision of the fire protection procedures and operator training that support compliance with Appendix R, and 8611250577 861118
{DR ADOCK 05000267 PDR
November 18, 1986 Mr. R. O. Williams, Jr. - Status of your compliance with Sections C, D, and F of Generic Letter 86-10.
This information should be provided with the comments requested above.
Note that at this time you must continue all interim compensatory measures as described in your letters of April 1 and July 11,1985(P-85113and P-85245),respectively.
Relief from these measures will be granted when full compliance with 10 CFR Part 50, Appendix R, is achieved. We may request certification conc.erning your compliance with 10 CFR Part 50, Appendix R, at a later time.
If you have any questions concerning this matter, please call Charles S. Hinson at (301) 492-7930 or me at (301) 492-8288.
The information requested in this letter affects fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, Original signed by Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION:
iDocket File e NRC' PDR "" '
Local PDR PBSS Reading FMiraglia 0GC-Bethesda EJordan BGrimes JPartlow HThomspon ACRS(10)
PNoonan CHinson KHeitner Olynch HBerkow
}q PBSS R H Pass S PBm/
HBer)gv u
n CHinson KHeitner:ac crynch 1
86 Id/tt/86 14/ lY/86 19/f /86 1(/)$/86
Mr. R. O. Williams, Jr.,
- Status of your compliance with Sections C, D, and F of Generic Letter 86-10.
This information should be provided with the comments requested above.
Note that at this time you must continue all interim corpensatory measures as described in your letters of April 1 and July 11, 1985 (P-85113 and P-85245),respectively. Relief from these measures will be granted when full compliance with 10 CFR Part 50, Appendix R. is achieved. We may request certification concerning your compliance with 10 CFR Part 50, Appendix R, at a later time.
If you have any questions concerning this matter, please call Charles S. Hinson at (301) 492-7930 ormeat(301)492-8288.
The information requested in this letter affects fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely.
m Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation
Enclosure:
' ~
As stated cc w/ enclosure:
See next page l
1
e Mr. R. O. Williams Public Service Company of Colorado Fort St. Vrain cc:
Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. J. W. Gahm, Manager GA Technologies, Inc.
Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Diviston Mr. L. W. Singleton, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840, Public Service Company of Colorado Denver, Colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. 0. Box 840 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 92138 Kelley, Stansfield & 0'Donnell Public Service Company Building Connitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D u-Regional Administrator, Region IV U.S. Nuclear Regulatory Conaission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413 1
, _.