MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update ML20128G0481996-09-30030 September 1996 Submits Rev to Psco Definitions of Contents of Documentation Packages Re Fsv Final Survey Project ML20129C0421996-09-20020 September 1996 Forwards Quarterly Submittal of 10CFR50.59 Rept of Changes, Tests & Experiments for Facility Decommissioning,Covering Period of 960601-0831 ML20133D7601996-09-16016 September 1996 Forwards Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project,First Final Survey Rept Submittal- Vols 1-5.NRC Comments Incorporated.Spending Plan Attached ML20117P0711996-09-13013 September 1996 Describes Util Plans to Remove Bldg 28 from Plant Facility ML20129A4431996-09-11011 September 1996 Describes Util Plans for Demonstrating That Liquid Effluent Pathway & Surrounding Open Land Areas Satisfy 10 Mrem/Yr Criteria Provided in Plant Final Survey Plan ML20117K5291996-09-0404 September 1996 Provides Notification That Util Will Be Revising Financial Assurance Mechanism That Will Be Used to Cover Remaining Costs of Decommissioning Plant ML20117C7281996-08-22022 August 1996 Discusses Impact of Final Decommissioning Rule & Requests NRC Concurrence That Requirements to Submit & Obtain Approval of License Termination Plan Have Been Satisfied ML20116P3431996-08-16016 August 1996 Describes Actions to Remove Structures & Equipment Items from Fort St Vrain Facility for NRC Info.Requests That NRC Advise Util of Wishes to Perform Confirmatory Survey of Any Parts of New Fuel Storage Building Before 960903 ML20133D7551996-08-14014 August 1996 Provides Environ Survey & Site Assessment Program'S (Essap) Comments Re Review of Fsv Nuclear Station Decommissioning Project Final Survey Rept ML20116M0771996-08-14014 August 1996 Provides Suppl Response to Re Insp Rept 50-267/96-01 in Jan 1996 Re NRC Concerns About Fsv Final Survey Program.Specifically,Bias in Instrumentation Response Overestimating Amount of Contamination Present ML20116M1841996-08-13013 August 1996 Forwards Util Responses to NRC Comments in Re Use of in-situ Gamma Spectroscopy to Measure Exposure Rates During Plant Final Survey.Approval to Use in-situ Gamma Spectroscopic instrument,Microspec-2,requested ML20116K0061996-08-0909 August 1996 Submits Fort St Vrain Nuclear Station Decommissioning Project Final Survey Rept ML20116M1241996-08-0808 August 1996 Responds to NRC Bulletin 96-004, Chemical,Galvanic,Or Other Reactions in Spent Fuel Storage & Transportation. Informs That Modular Vault Dry Storage Sys Is Not Susceptible to Problems Addressed in Bulletin ML20116F3611996-08-0202 August 1996 Submits Revised Documentation for Fort St Vrain Final Survey Program ML20116F8141996-08-0202 August 1996 Informs of Util Intent to Modify Fort St Vrain Control Room,Which Will Make Certain Final Survey Locations Unavailable for Further Review.Final Survey Efforts Are Complete ML20116A4511996-07-19019 July 1996 Requests NRC Approval of Proposed Method to Fsv Final Survey Plan to Determine Exposure Rates in Prestressed Concrete Reactor Vessel 1999-03-26
[Table view] |
Text
- .. .-
- i. .
i l
O rubiic ::.: = -
16805 WCR service' 191/2; Platteville, Colorado 80651 October 30,1996 ,
Fort St. Vrain P-96090 t U.S. Nuclear Regulatory Commission l ATTN: Document Control Desk Washington, D.C. 20555 i
ATTN: Mr. Michael F. Weber, Chief Decommissioning and Regulatory Issues Branch ,
Docket No. 50-267
REFERENCES:
- 1. PSCo Letter, Borst to Weber, dated May 31,1996 (P- i 96041) Initial Final Surwy Report
- 2. PSCO Ietter, Borst to Weber, dated August 9,1996 (P-96061) Final Surwy Report - Submittal of Second Report
- 3. PSCo I2tter, Borst to Weber, dated September 11, 1996 (P-96068) Proposed Sampling and Surwy Planfor Efluent i
Pathway Si. dCT: Final Survey Report - Submittal of Third and Final Report
Dear Mr. Weber:
This letter submits for NRC approval the last of three reports that document the final radiological condition of the Fort St. Vrain Generating Station (FSV), in support of a forthcoming request for termination of the FSV 10 CFR Part 50 license. The first two phases of this FSV Final Survey Report were submitted via References 1 and 2.
3 Completion of Final Survey 4
lg
- a. With completion of the Final Survey, as documented in all three submittals, Public
- Service Company of Colorado (PSCo) considers that, as required by 10 CFR 50.82(f):
-ac 1. Decommissioning activities have been carried out in accordance with the approved FSV Decommissioning Plan and decommissioning order, and
- A/ Ale At tLL 4 I #
h
't , - 2 120005 Ti: FI/e(3dv ne &< .
9 4 l
f P-96090 ,
L October 30,1996 j
- Page 2 ;
- 2. 'Ihe Final Survey Report and associated documentation thoroughly demonstrate that the FSV facility and site are suitable for release for >
. unrestricted use. l
,8 Final survey activities were performed in acevidiir,ce with the FSV Final Survey Plan and
. implementing procedures. Survey measurements, instrumentation, personnel training, i data analysis, quality control measurements, and documentation were all performed by
, our decommissioning contractor, the Westinghouse Team / Scientific Ecology Group, Inc. ;
- - (SEG), in accordance with approved program requirements, with one exception. In the ;
. liquid effluent pathway, soil samples and survey measurements were ta k eni n accordance j with a specifically developed survey plan, that allows survey efforts to be more focused !
i in areas where contamination is most likely to be found. PSCo requested NRC approval [
j of the effluent pathway survey plan in our letter of September 11,1996 (Reference 3). l
- PSCo recognizes that effluent pathway survey data collected in advance of NRC approval
!- is subject to revision, based on NRC comments that may be forthcoming. However, we i consider that the effluent pathway survey plan is appropriate for the FSV Final Survey, l and believe that any comments can and will be satisfactorily resolved.
Quality Assurance Ovendght t
! As described in the previous two final survey reports, PSCo performed significant quality assurance and oversight activities, including audits and monitorings of selected survey
- activities, to provide further confidence in the report results. This effort involved field
' observations, calculation verifications, and documera reviews. In addition, we retained
- a third party to perform ir "+;-:+ht verification surveys. All of these efforts are
- documented in the enclosed report.
i I Resubmittal of Infonnation From Mrst Two Reports i
This final submittal of the FSV Final Survey Report provides survey results for all remaining surfaces and structures, systems, open land areas, and the liquid effluent pathway. Information from the first two submittals is, in general, not re-submitted.
4 However, a small amount of material in the enclosure to this letter is intended to replace material from previous submittals, with the following explanation:
- Replacement material is included in Binder 3 of 32 in the enclosure to this letter.
2 This binder is distinguishable from the others by a neon green cover insert, entitled " Replacement Sections for Previously Submitted Reports."
h *- Binder 3 includes introductory material for the three Survey Groups that were '
only partially submitted previously, Groups C, D, and F (Volumes 4, 5, and 7, o- , n - ,- - n- , _ , .-.. . , , , , ,y __._.n._._,___ __,
-- - . . . - - . . ~ - . . - - - . . . _ . - . . - . -.. .- _.
i
.;. . r I
P-96090 j October 30,1996 t Page 4 I Volume 2 Final Surwy Repon for Gmup A. This volume was submittal 'n its {
entirety with the first phase report, Reference 1, and is NOT included ;
l' herewith. Volume 2 contains the survey results and Release Records for - l j Buildings and Areas Outside the Restricted Area. The report for the 11 !
i Group A Survey Areas is included in 2 books. I i
i Volume 3 Final Surwy Repon for Gmup B. This volume was submitted in its ,
i L entirety with the first phase report, Reference 1, and is NOT included l
herewith. Volume 3 contains the survey results and Release Records for .
Buildings and Areas Inside the Restricted Area. The report for the 17 !
l Group B Survey Areas is included in 2 books. l Volume 4 Final Surwy Reponfor Gmup C, Revision 1. This volume contains a l summary of survey results and the Release Records for the Turbine !
Building. The remaining 21 of 57 Survey Areas that were not included !
j with the first or second phase report submittals, and the updated Sections ;
1 through 5 as discussed above, are included herewith. The entire ;
}
- Volume 4 consists of 7 books. l
- i' s
- Volume 5 Final Surwy Reponfor Gmup D, Revision 1. This volume contains a summary of survey results and the Release Records for Unaffected Plant ;
i Systems. The remaining 13 of 21 Survey Areas that were not included j with the first or second phase report submittals, and the updated Sections j
- 1 through 5, are included herewith. The entire Volume 5 consists of 3 l books. )
l Volume 6 Final Surry Reponfor Gmup E. This volume contains a summary of !
- survey results and the Release Records for the Effluent Discharge Flow
- Path, Basins / Ponds / Lagoons, and Surrounding Grounds. All 14 Group E Survey Areas are included, in 2 books.
I Volume 7 Final Surwy Reponfor Group F, Revision 1. This volume contains a summary of survey results and the Release Records for the Reactor '
I Building. The remaining 105 of 156 Survey Areas that were not included
, with the first or second phase report submittals, and the updated Sections
! I through 5, are included herewith. The entire Volume 7 consists of 19
- books.
Volume 8 Final Surwy Reponfor Gmup G. This volume contains a summary of survey results and the Release Records for Affected Plant Systems (External to the PCRV). All 10 Group G Survey Areas are included, in i 2 books.
i
1 .
l P-96090 'i October 30,1996 Page 3 respectively). The introductory material is included in Sections 1 through 5 in-the first book of each Survey Group, and includes descriptions of activities and .
a summary of the survey _ statistics, for that specific Group. This information '
was revised to include the additional activities described in this final submittal.
- Binder 3 also includes replacement cover and spine inserts for all of the books in Volumes 4, 5, and 7, since the total number of bucks in these volumes changed ;
with this submittal. These replacement inserts reflect the fact that Volume 4 now i includes 7 books versus the original 4; Volune 5 new ir,cludes 3 books versus the ;
original 1; and Volume 7 now includes 19 books versus the original 5. l t
- Holders of previous copies of Volumes 4,5, and 7 are requested to replace the i material in Sections 1 through 5, Revision 0, in the first book of each volume l with the material included herewith in Sections 1 through 5, Revision 1. Also, j please replace the binder cover inserts and spine with those provided in this !
submittal.
- Binder 3 also includes the Repower Area Final Survey Report, for completeness. !
This report was previously approved by the NRC on July 17, 1995.
Maal Survey Report Overview i The following is an overview of each of the 12 Volumes, encompassing a total of 46 i binders, that constitute the FSV Final Survey Report:
l l
Volume 1 FinalSunty, Description andResults, Revision 2. This submittal includes l i a complete replacement of the summary report, and is contained in two )
books. Volume 1 provides an overview of facility decommissioning and ;
dismantlement activities, survey methodologies, and survey results.
l Volume 1 also includes two attachments: l
- Attachment 1, Supplement 2 describes PSCo's Final Site Survey ;
- - Quality Assurance and Oversight Activitics subsequent to the second phase report (Reference 2); descriptions of previous Quality Assurance and Oversight Activities were provided with References j j 1 and 2. )
i
!
- Attachment 2, Supplement 2 consists of an Independent -
i Verification Survey Report, documenting survey activities 1 i performed for PSCo by GPU Nuclear subsequent to the second I
- phase report (Reference 2); descriptions of previous GPU Nuclear survey activities were provided with References 1 and 2.
i 1
I l
l
l P-96090
- October 30,1996 l Page 5 l i l Volume 9 Final Surwy Reponfor Givy H. 'Ihis volume contains a summary of l l survey results and the Release Records for PCRV Internal Surfaces and l l' Embedded Piping. All 7 Group H Survey Areas are included, in 2 books. ;
i 1
! Volume 10 Mnal Surwy Reponfor Group I. This volume contains a summary of j survey results and the Release Records for Open Imd Areas, .
Miscellaneous Buildings and Systems. All 15 Group I Survey Areas are !
included, in 3 books. ;
i
! Volume 11 Final Surwy Reponfor Grey J. This volume contains a summary of (
- survey results and the Release Records for Penetrations. All 4 Group J i Survey Areas are included, in 1 book. ;
t i
Volume 12 Final Surwy Reponfor the Repower Area. This report was previously i approved by the NRC on July 17,1995, and is included for completeness.
i As discussed above, this report is included in a binder entitled e
! " Replacement Sections for Previously Submitted Reports." A separate l 3
cover insert and spine are also included for Volume 12. j I Conclusion ;
i
! PSCo has thoroughly reviewed the attached information and affirms that it represents the ;
- final as-surveyed condition of the FSV facility, and plant configuration as of this date. ;
4 To support confirmatory survey and review activities by the NRC, survey locations will ;
- be maintained for the areas covered by this report for at least 30 days. If you desire a !
longer confirmatory survey and review period, please contact us before the end of this j l Period. ;
If you have any questions regarding this information, please contact Mr. M. H. Holmes
- at (303) 620-1701, i
) Sincerely, j i
$$ 'd- -
- Frederic Borst ;
Decommissioning Program Director
, e
FJB/SWC ;
i !
i l Enclosure
! l
{
6 i
- , _. - n , .
P-96090 October 30,1996 Page 6 cc: Regional Administrator, Region IV Mr. Robert M. Quillin, Director Radiation Control Division Colorado Department of Public Health and Environment Mr. Eric Ablequist Oak Ridge Institute for Science and Education
- . - - - - - - .