Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station
ML20137S542
Person / Time
Site: Fort Saint Vrain 
Issue date: 04/07/1997
From: Borst F
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
P-97023, NUDOCS 9704150168
Download: ML20137S542 (4)


Text

-

O l

h P'ublic Service +

Orl1..

16805 WCR 191/2; Platteville, Colorado 8%51 April 7,1997 Fort St. Vrain P-97023 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D.C.

20555 Docket No. 50-267

SUBJECT:

QUARTERLY SUBMITTAL OF THE 10 CFR 50.59 REPORT OF CHANGES, TESTS AND EXPERIMENTS FOR FORT ST. VRAIN DECOMMISSIONING

REFERENCE:

NRC Ietter dated November 23,1992, Erickson to Crawford (G-92244)

Gentlemen:

This letter transmits the last and final quarterly 10 CFR 50.59 Report of Changes, Tests, and Experiments affecting Decommissioning of the Fort St. Vrain (FSV) Nuclear Station. This report covers the period from March 1,1997 through termination of the Fort St. Vrain Facility Operating License (Possession Only).

In the event that any additional changes, tests or experiments occur between the present date and the actual license termination, Public Service Company of Colorado will provide a supplement to this letter.

This report is being submitted pursuant to Condition (b)(2) of the " Order Approving Decommissioning Plan and Authorizing Deconimissioning of Facility", transmitted in the referenced letter, which states the following:

"The licensee shall submit, as specified in 10 CFR 50.4, a report containing a brief description of any changes, tests and experiments, including a summary of the safety evaluation of each. The report must be submitted quarterly."

if you have any questions concerning this report, please contact Mr. M. H. Holmes at (303) 571-7633.

(

Sincerely, p{L\\bi Mc fr$&

Frederic J Borst Decommissioning Program Director 97041501689704ob67

!!!,!!!IIIII(If!.!I,!I.!I,Ik

~

hDR ADOCK 05000 PDR J

i i

'P-97623 April 7,1997 Page 2 4

FJB/SWC Attachment V

cc:

Mr. John W. Hickey, Chief Decommissioning and Regulatory Issues Branch Regional Administrator, Region IV Mr. Robert M. Quillin, Director Radiation Control Division Colorado Department of Public Health and Environment 4

7

k 3

j

~.

FINAL QUARTERLY 10 CFR 50.59 REPORT OF CHANGES, TESTS AND EXPERIMENTS FOR FSV DECOMMISSIONING i

2

Background:

The following is a brief discussion of 10 CFR 50.59 changes to the Fort St. Vrain (FSV) facility i

or procedures as described in the Decommissioning Plan (DP) and tests and experiments not j

described in the DP, in the time period from March 1,1997 through termination of the Fort St.

Vrain Facility Operating License (Possession Only).

This report is similar to past reports of changes, tests and experiments submitted in accordance with 10 CFR 50.59, and is submitted pursuant to Paragraph (b)(2) of the FSV Decommissioning j

Order (issued in NRC letter dated November 23,1992, Erickson to Crawford), which states:

\\

"The licensee shall submit, as specified in 10 CFR 50.4, a report containing a brief description of any changes, tests and experiments, including a summary of the safety evaluation of each. The report must be submitted quarterly."

As the final report of Fort St. Vrain Decommissioning Project activities, this report also summarizes the final submittal of other required NRC reports, although Public Service Company of Colorado (PSCo) acknowledges that these reports are typically not treated as changes, tests l

and experiments, and they were not covered by safety evaluations.

l Proiect Status:

All physical decommissioning activities at Fort St. Vrain have been complete since March 1996 and the Final Survey Report was submitted in October 1996. PS :o expects to resolve all remaining NRC issues regarding the final survey by the end of April,1997.

j i

On April 3,1997, PSCO submitted a request to terminate the Fort St. Vrain Facility Operating License (Possession Only), in accordance with the process provided in the July 1996 i

Decommissioning Rule (61 FR 39278). As part of this process, PSCo also requested NRC j

approval of a license amendment to document approval of the Fort St. Vrain license termination plan, the elements of which are primarily contained in the approved Decommissioning Plan, with l

remaining elements in the approved " Supplement to Applicant's Environmental Report - Post-Operating License Stage - Decommissioning," and in the approved Final Survey Plan.

t On March 11, 1997, PSCo submitted the final Annual Radioactive Effluent Release Report (Reference 1). This report stated that all effluent releases were complete as of July 3,1996, and that all solid low level radioactive waste had been shipped for disposal by March 11, 1997.

i 1

m,

,-n e-

~

e r

, f

)

  • On March 18, 1997, PSCO submitted the final Annual Radiation Exposure Reports, for 1997 (Reference 2). This letter stated that no personnel received radiation exposure at Fort St. Vrain in 1997 or at any time subsequent to the previous summary reports submitted on November 5, l

1996.

On Manh 18, 1997, PSCo submitted the 1997 Annual and Final Radiological Environmental i

Operating Report (Reference 3). This letter noted that after July 3,1996, there were no radiological effluent releases that potentially could have affected the environment. PSCo concluded that the Applicability statement in the ODCM, that it applied to "all routine, planned 4

liquid and gaseous efluent releases made pursuant to the FSV Decommissioning Technical Specifications and unplanned liquid and gaseous efluent releases," had been satisfied and that i

all surveillances and other actions taken in accordance with the ODCM may be suspended.

.PSCO also concluded that there was no need to continue the Radiological Environmental Monitoring Program (REMP), which is included in the ODCM and which essentially confirms the effectiveness of effluent controls by monitoring for radionuclides in the environment, since effluent releases had been completed. The REMP included requirements to perform a Land Use Census, to determine if any changes need to be reflected in the following year's monitoring i

program. Since PSCo concluded that the REMP surveillances could be suspended, there was

]

no need to perform a census to determine any appropriate changes. As part of the suspension i

of REMP surveillances and other actions, the Land Use Census was also discontinued. PSCo's conclusions were documented and the suspension of surveillance activities was approved by the 4

Decommissioning Safety Review Committee on July 10, 1996.

i a

f Changes to the FSV Facility or its Procedures as Described in the Decommissionine Plan 1

l There were no changes to the FSV facility or its procedures as described in the DP during this period.

4 i

Tests or Exneriments not Described in the Decommissionine Plan No tests or experiments were conducted this reporting period that are not described in the DP.

References for Final 10 CFR 50.59 Report l.

PSCo letter, Borst to NRC Document Control Desk, dated March 11,1997 (P-97013),

" Annual Radioactive Effluent Release Report."

2.

PSCo letter, Borst to Director, Office of Nuclear Regulatory Research, dated March 18, 1997 (P-97014), " Final Fort St. Vrain Annual Radiation Exposure Reports,1997."

3.

PSCo letter, Borst to NRC Document Control Desk, dated March 18,1997 (P-97015),

i "1997 Annual and Final Radiological Environmental Operating Report."