Forwards Insp Rept 50-267/89-16 on 890716-0831 & Notice of Violation
ML20248B297
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/26/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Crawford A
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20248B301 List:
References
NUDOCS 8910030159
Download: ML20248B297 (2)


See also: IR 05000267/1989016

Text

y _ __

_ _ _ _ _ _ - - - _

e o.

'

.. .

SEP 26 IIEL

% Reply Refer To:

L

I

oocket: 50-267/89-16

Public Service Company of Colorado

ATTN: A. Clegg Crawford

Vice President, Nuclear Operations

P.O. Box 840

Denver, Colorado 80201-0840

Gentlemen: i

i

This refers to the inspection conducted by Messrs. R. E. Farrell,

P. W. Michaud, H. D. Chaney, and R. P. Mullikin of this office during the

period July 16 through August 31, 1989, of activities authorized by NRC

Operating License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and

to the discussion of our findings with Mr. C. H. Fuller and other members of 1

your staff at the conclusion of_the inspection. I

Areas' examined during the inspection included onsite followup of licensee event

reports, review of the 10 CFR Part 21 reports, review of licentee action on

Generic Letter 83-28,' operational safety verification, onsite followup of

events, monthly surveillance observation, and monthly maintenance observation.

Within these areas, the inspection consisted of selective examination of

- procedures and representative records, interviews with personnel, and

observations by the inspectors. The inspection findings are documented in the

enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in -

paragraphs 4 and 5 of the enclosed report.

- The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Papenvork Reduction Act of 1980, PL 96-511.

-

  • RIV: SRI *RI *DRSS/FRPS *DRP/B *C:DRP/B DRP QY

REFarrell/kc 'PWMichaud HDChaney RPMullikin TFWesterman LMilh n

/ /89 / /69 / /89 / /89 / /89 q/fL/89

\

  • previously concurred

891003o109 890926 _

fhv '

gos ApocK osoo g , g

_ - _ _ _ _ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ - _

,- ,. o

-

. .

Public Service Company of Colorado- -2-

Should you have any. questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,.

OriginalSigned By:

Thomas P.Gwynn

James L. Milhoan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A.. Notice of Violation

2. Appendix B 2 NRC Inspection Report

50'267/89-16

cc w/ enclosures:

Fort St. Vrain Nuclear Generating Station

ATTN: C. Fuller, Manager

Nuclear Production Division

16805 WCR 19 1/2

Platteville, Colorado- 80651

Fort St. Vrain Nuclear Generating Station

ATTN: .P. Tomlinson, Manager

Quality Assurance Division:

16805 WCR 19 1/2

Platteville, Colorado 80651 .

Colorado Public Utilities Commission

ATTN: Ralph Teague, P.E.

1580 Logan Street OL1

Denver, Colorado 80203

Colorado Radiation Control Program Director

.bcc to DMB (IE01)-

bec distrib. by RIV:

  • RR1 *R. D. Martin, RA

, *Section Chief (DRP/8) * Project Engineer (DRP/B)

  • RPB-DRSS Lisa Shea, RM/ALF
  • MIS System *RSTS Operator
  • K. Heitner, NRR Project Manager (MS: 13-D18)
  • RIV File- *DRS

'*DRP

'

,

  • w/766

a

L