Discusses Review of Rev 6 to Facility Schedule Commitment Items.Items Include Improved CRD Mechanism Surveillance Program,App R Mods to Emergency Lighting Sys & Performance Enhancement Program Review
ML20147E093
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/26/1988
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
TAC-54373, NUDOCS 8803040266
Download: ML20147E093 (6)


Text

P t

b b'

Q

[gwg[o UNITED STATES g

(

3 g

NUCLEAR REGULATORY COMMISSION i

-E WASHING fON, D. C. 20666 February ?6,1988 Locket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colroado P. O. Rox 840 Derver, Colorado P0201-0840

Dear Fr. k'illiams:

SUBJECT:

FORT ST. VRAIN SCHEDULE C0HilTMENT ITEMS - REVISION 6 (TAC NO. 54373)

Reference:

1.PSCletterdatedJanuary4,10P8(P-88012);Proposedschedule rniston for the concitnent items associated with the CRDOA EACK-EMF testing program.

?. PSC letter dated January 15,19PP (P "0MO); Submittal of cur rent construction status for Aprv.Jix R rnodifications.

3. PSC letter dated January 18, 19PP (P-88031); Perforr.ance er.hancerent progran update.
4. NPC letter dated Septen.ber 29, 1987; Implementation schedule fer 10 CFR 50.48 and Apperdix R fire protection acdifications-Fort St. Vrain Nuclear Generating Station.

The staff has reviewed your submittals, F.eferences 1 thru 3. concerning changes you have requested to corrritr,ents for the Fort St. Vrain Nuslear Generating Station (FSV). We have individually exar.iined each char.ge and our discussion follows:

Irproved Control Roc Drive Mechanism CPDM Surveillarce Procram - You ha ve pWe's'eY W FeTeFehiE Tt'o'TuFth,e(F 'ei)tFnTths'tTmE'tF 'pFo'vTde improved CRCM surveillar.ce program.

The prir.ary cause for the further delay is the FSV's limited operating tire at higher reactor power levels.

The staff agrees that a lack of operating data at higher power levels is e valid reason for delay.

In your letter (Reference 1) you proposed an extended schedule, with the improved CRCP surveillance program being submitted approximately 150 days after the startup of the fourth refueling outage or approximately July 1989.

The staff finds this proposal acceptable.

Please note that the staff's intention is to review your revised CPCM surveillance program. Supporting 8903040266 800226 PDR ADOCK 05000267 P

PDR

R. O. Williams material such as the proposed testing nethods and parameters may be sutinitted for coment.

However, the staff's preference would be to review the entire program after it is developed.

Appendix R Modifications - Emergeney Ligh_ ting, System - In your letter, _

c Reference 2, you requested ~aWitional time to coEplete the installation of the emergency lighting system.

This additional delay of approximately 6 weeks is to allow for replacenent of storage batteries damaged due to inadequate storage conditions.

The staff finds this delay is acceptable.

Perfomance Enhancement Program (PEP) Review - In your letter, Reference T~yFu request th~a't'~the~ interval for the neetings on the PEP be extended to one year. The staff notes that the significant improvements in your perforrance, both during plant operation and outages, are evident. This improvenent is docunented in the reports of the Systematic Assessment of Licensee Performance (SALP).- Therefore, the staff concurs that the PEP program review should occur once per year.

The staff's preference is to combine this neeting with your response to the annual SALP report.

A revised sumary of your ccernittents is enclosed.

Sincerely,

\\1 Kenneth L. Heitner, Pro.iect Manager Project ~ Directorate - IV Division of Reactor Project - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated

.DISTRIEUTION:

M cket File Local PDR NRC PDR cc w/ enclosure:

PD4 Reading GBagchi CMcCracken See next page JCalvo KHeitner TWesteman/JCallan PNoonan OGC E. Jordan ACRS(10)

LMarsh JPartlow PD4 Plant File

  • see previous concurrence
  • LA:PDIY
  • PM:PDIV D:PDIY
  • CHEB
  • RIV PNoonan KHeitner JCalvo CMcCracken TWesterman/JCallan 02/11/88 02/22/88 02/u/88 02/L2/88 02/2N88 t

4 R. O. Williams material such as the proposed testing methods and parameters may be submitted for connent. However, the staff's preference would be to review the entire program af ter it is developed.

PCRV Tendon Surveillance Program - In your letter Reference 2. you note that in an earlier submittal dated July 20. 1987 (P-87234) an alternative PCRV Tendon Surveillance Program was proposed. The key features of this alternative program are that the surveillance intervals are extended from 6 to 12 months. The cycle for new tendons selected for liftoff testing is extended from 18 to 24 months.

In considering this extension. the staff notes that over 80% of the tendons have been examined. so the data sample is f airly complete.

Repeated testing of the control group tendons by liftoff shows no obvious degradation over three years. The five worst case tendons are stable, and still acceptable by the end of life criteria in the FSAR.

Based on the above considerations. the staff finds your revised PCRV tendon surveil-

-lance program is acceptable.

Appendix R Hodifications - Emergency Lightino System - In your letter.

Reference 3. you requested additional time to complete the installation of the emergency lighting system. This additional delay of approximately 6 weeks is to allow for replacement of storage batteries damaged due to inadequate storage conditions. The staff tinds this delay is acceptable.

Performance Enhancenent Program (PEP) Review - In your letter. Reference

4. you request that the interval for the meetings on the PEP be extended to one year. The statt notes that the significant improvements in your performance, both during plant operation and outages. are evident. This improvement is documented in the reports of the Systematic Assessment of Licensee Performance (SALP). Therefore, the staff concurs that the PEP program review should cccur once per year. The staff's preference is to combine this meeting hith your response to the annual SALP report.

A revised sumary of your commitments is enclosed.

Sincerely.

j Kenneth L. Heitner. Project Manager Project Directorate - IV Division of Reactor Project - 111.

IV. Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

i As stated D_1STRIBUT10N:

Docket File Local PDR NRC PDR cc w/ enclosure:

PO4 Reading CBagchi CMcCracken 2

See next page JCalvo KHeitner TWesterman/JCallan PNoonan 0GC E. Jordan j

ACRS (10)

LMarsh JPartlow PD4 Plant File Rly hm LA: POLY PM:PDIV D:PDIV SEB CHE PNoonan KHeitner JCalvo GBaeth+

cmc a'cb TWesterman/JCallan 02//f/88 02/r/88 02/ /88 02/ /80 02C/88 02A3/88

1 Mr. R. O. Williams. Jr.

Public Service Company of Colorado Fort St. Vrain cc:

Mr. D. W. Warembourg. Manager Albert J. Hazle. Director Nuclear Engineering Division Raciation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver. Colorado 60220 Denver. Colorado 80201-0840 Mr. David Alberstein.14/159A Mr. R. O. Williams Jr.. Acting Manager GA Technologies. Inc.

Nuclear Producticn Division i

Post Office Box 85608 Public Service Company of Colorado San Diego. California 92138 16805 Weld County Road 19-1/2 Platteville. Colorado 80651 1

Mr. H. L. Brey. Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson. Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver. Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville. Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville. Colorado 80651 Post Office Sox 840 Denver. Colorado 80201-0840 Kelley. Stansfield & 0'Donnell Public Service Company Butiding Comitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver. Colorado 80202 2420 W. 26th Ave. Suite 100-0 Denver. Colorado 80211 Region 61 Administrator. Region IV U.S. Nuclear Regulatory Comission 4

611 Ryan Plaza Drive. Suite 1000 Arlington. Texas 76011 C'. airman. Ecard of County Comissioners of Weld County, Colorado areeley. Colorado 80631 i

Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 99918th Street. Suite 1300 Denver. Colorado 80202-2413 l

Revision 6 FUBLIC SERVICE COMPANY OF COLORADO COMMITMENTS

-~~hti.ATtb 7tf THI bTthATIOh 0F THE f 0,R,T, y,.,,V3f,I,N,,h,y,C L EWt1Nt kA,TJW 3 TAT I ON i

Itent C enn i try,n,t C e,s,c,r,ip,t,i o,nf,R,eg u i r,eme,n,t Schedule (Reference) 1.

Provide status reports on the Nuclear Approximately i

Perfctr4t.ce Enheticiarwnt Program on an annually ar.rual basis.

(P-88031) 2.

In.plement the Technical S tipgradeProgram(P-85098)pecifications(TS) a.

Frevide a revised final diaft proposal Complete of the Upgraded TS for NRC coment, (P-87063) b.

Submit a license atendrent to 90 days after incorporate the Upgraded TS, (P-85?43)

NRC comments on Item Ea c.

Inplert:nt the Upgraded TS. (P-85243)

Approximately ath refueling outage (License amendnent will define) 3.

Irrrcse control red and reserve shutdown (SeeItem2) reliability.

Incorporate the interim Technical Specifications in the Upgrade Program.

1 1

4 Cevelop a plan to impleaent approved Annually nodifications to control moisture ingress and submit arnual reports on progress.

(P-85022 and p-PEOPP) 5.

Evaluate control of n(sisture in CRDM purge 4th refueling systen.(P-85021) outage 6.

PCRV Tendon Surveillance Requirements:

a.

Incorporate the revised Tendon Surveillance (See Item 2) 1 Program into the Technical Surveillance (P-85199),

b.

Provide the results of the revised Approximately program to the NRC, every six renths e

1

i o.-

1 Revision 6 Page 2 i

7.

Provide an improved CRDM surveillance Five months program which includes consideration of after the start i

CRDM operational testing.

(P-88012) of 4th refueling outage 8.

Fire Protection Modifications:

a.

Perform emergency lighting Complete b) 3/1/68 l

mcatfications (P 88030)

]

i b.

Perforu modificaticos involvitig Startup following 1