Forwards Insp Rept 50-267/89-07 on 890319-0430 & Notice of Violation
ML20244C122
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/08/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20244C124 List:
References
NUDOCS 8906140131
Download: ML20244C122 (2)


See also: IR 05000267/1989007

Text

, _ _____-

[i.

JLH 8W

In' Reply Refer To:

Docket: 50-267/89-07 L

Public Service Company of Colorado

ATTN: Robert O. Williams, Jr.

Senior Vice President, Nuclear Operations

4

P.O. Box 840

Denver, Colorado 80201-0840

Gentlemen: ,

This refers to the inspection conducted by Messrs. R. E. Farrell and

P. W. Michaud of this office during the period March 19 through April 30, 1989,

of activities authorized by NRC Operating License DPR-34 for Fort St. Vrain -

Nuclear Generating Station, and to the discussion of our findings with you and

other members of your staff at the conclusion of the inspection. {-

Areas examined during the inspection included licensee action on previously

identified inspection findings, operational safety verification, monthly

surveillance observation, and monthly maintenance observation. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspectors. The inspection findings are documented in the enclosed inspection

report. s

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Fart 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

l

h%

RIV: SRI

  1. } DRP/B

hh C:DRP/B T D: ,b

REFarrell/kc[RI PWMichaud RPMullikin TFWesterman L Ca'lan

/ /89

/f f / (,/ f /89 /, /f /89 G///89 g//89

h/

8906140131 890608

PDR

o

ADOCK 05000267

PDC

h)e

-

.

. _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ - - - _ - _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _

- _ - .

,;, , . m. _ _ _ _ _ - - _ _ _

?.

(r .

..

-..

o ,

i

. Public. Service Company of Colorado -2-

Should you have any questions concerning this, inspection, we will be pleased to'

discuss them with you.

Sincerely.

Original Signed By, -

,J g ,v es L . ( Yl * l I1 o n r1

James L. M11hoan, Director

Division of Reactor Projects

' Enc 1osures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-267/89-07

cc w/ enclosures:-

Fort St. Vrain Nuclear Generating Station

ATTN: C. Fuller, Manager

Nuclear Production Division

.16805 WCR 19 1/2L

Platteville, Colorado 80651

Fort St.~ Vrain Nuclear Generating Station

ATTN: . P. Tomlinson, Manager

Quality Assurance Division

'16805 WCR 19 1/2-

Platteville, Colorado:.80651

Colorado Radiation Control Program Director

Colorado Public Utilities Connission

ATTN: Ralph Teague, P.E..

1580 Logan Street OLI ,

Denver, Colorado 80203

bectoDMB(IE01)

bec distrib. by RIV:

  • RR1 *P.. D. Martin, RA
  • ProjectEngineer(DRP/B)

.

'*SectionChief(DRP/B)

  • RPB-DRSS *Lisa Shea, RM/ALF

'* MIS System *RSTS Operator

  • K. Heitner, NRR Project Manager (MS: 33-D-18)
  • RIV file *DRS
  • DRP-

l

l. '*w/766

i:

L - - - - - - - - ----------- - --- ____