ML20247L138

From kanterella
Jump to navigation Jump to search

Advises That Request to Delete Requirement to Provide Status Repts on Performance Enhancement Program Approved.Updated List of Commitments Encl
ML20247L138
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/19/1989
From: Heitner K
Office of Nuclear Reactor Regulation
To: Crawford A
PUBLIC SERVICE CO. OF COLORADO
References
TAC-72063, NUDOCS 8909220130
Download: ML20247L138 (5)


Text

g _ _ _ _ _ _ _ _ _ - - - . _ . - - - - - _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

v:

N lA -

~, '

September. 19, 1989' L .. .3 - _. - ,

.F Docket No. 50-267 Mr. A. Clegg Crawford-LVice_ President, Nuclear Operations Public: Service Company of_ Colorado

Post Office Box 840-Denyer Colorado 80201-0840

Dear Mr.'Crawford:

SUBJECT:

FORT ST. VRAIN SCHEDULE'Of COMMITMENT ITEMS - REVISION 9-

-(TAC:N0.'72063)-

uThe staff has. reviewed your request to delete the requirement to provide status

.reportsonthePerformanceEnhancementProgram(PEP). We agree that the PEP-has fulfilled its most- significant goals over the past several years.

From our perspective, an important part of your performance is the relationship-with the NRC. We encourage your continuation of the policy and guidelines developed in 1986 on this subject.

The staff approves your request. An updated copy of the list of your commitments is enclosed.'

Sincerely,

/s/

Kenneth L. Heitner, Project Manager Non-Power Reactor, Decommissioning __

and Environmental Project Directorate Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation L

p

Enclosure:

l As stated

.cc,w/ enclosure:

See next page L DISTRIBUTI_0N_

@ ccheteF11e

  • P' NRC PDR Local PDR PD4 Reading

-PDNPRDE Reading G. Holahan F. Hebdon E. Hylton 0GC-Rockville K. Heitner E. Jordan B. Grimes ACRS (10) PD4 Plant File DOCUMENT NAME: FSV 8993 EN

  • See preyj sponcurrence CM- 8 PDNPRDE/LA* M PDNPRDE/PM PDh ${

EHylton KHeitner:bj SWeiss'

.g/jg 09/ 13/89 09/ /89 8909220130 890919 .

PDR ADOCK 05000267

E$ . UNITED STATES E ~

o NUCLEAR REGULATORY COMMISSION f74 .j _ WASHINGTON, D. C. 20555

%,*****/ September 19, 1989 Docket No. 50-267

.Mr. A.~Clegg Crawford-U Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver Colorado .80201-0840

Dear fir. Crawford:

SUBJECT:

- FORT ST. VRAIN SCHEDULE OF COMMITMENT ITEMS - REVISION 9 (TACNO.72063)

The staff has reviewed your request to delete the requireraent to provide status reports on the Performance Enhancement Program (PEP). We agree that the PEP has fulfilled its most significar,t goals over the past several years.

From our perspective, an irupertant part of your performance is the relationship-with the f1PC. . We encourage your continuation of the policy and guidelines develcped in 1986 on this subject.

The . staff approves your request. An updated copy of the list of your comitments is enclosed.

Sincerely,

.ws Kenneth L. Heitner, Prcject Manager.

t;on-Power Reactor, Decommissioning and Environmental Project Directorate Division of Reactor Projects - Ill, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

' ~

Mr. A. Clegg Crawford Public Service Company of Colorado Fort St. Vrain CC:

Mr. D. W. Warembourg, Manager Robert M. Quillen, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 Mr. David Alberstein, Manager Mr. Charles H. -Fuller Fort St. Vrain Services Manager, Nuclear Production GA International Services Corporation and Station Manager Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Resource Mr. P. F. Tomlinson, Manager Management Division Quality Assurance Division Public Service Company of Colorado Public Service Company of Colorado P. O. Box 840 16805 Weld County Road 19-1/2 Denver, Colorado 80201-0840 Platteville, Colorado 80651 Senior Resident Inspector Mr. D. D. Hock U.S. Nuclear Regulatory Commission President and Chief Executive Officer P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Standfield & 0'Donnell ATTN: Mr. J. K. Tarpey Commitment Control Program Public Service Company Building Coordinator Room 900 Public Service Company of Colorado 550 15th Street 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80202 Denver, Colorado 80211 l Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 l Arlington, Texas 76011 l

Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413 l

l l _. _ _ _ _ - - _ _ _ - _ - _ _ _ _ _ _ _ _ - -

7 Enclosure Revision 9 PUBLIC SERVICE COMPANY OF COLORADO COMMITMENTS-RELATED TO THE OPERATION OF _THE FORT S,T._VRAIN NUCLEAR GENERATING STATION Item Commitment Description / Requirement Schedule (Reference)

1. Implement the Technical S UpgradeProgram(P-85098)  : specifications (TS)
a. Provide a revised final draft proposal- Complete of the Upgraded TS for NRC comment.. (P-87063)
b. Submit a license amendment to incorporate 90 days after-the Upgraded (TS). (P-85243) NRC comments on Item 2a.
c. Implement the Upgraded TS. (P-85243) Approximately 4th refueling-

-outage (license amendment will define)-

2. Improve control rod and reserve shutdown (SeeItem3) ,

reliability. Incorporate the interim Technical i Specifications in the Upgrade Program.

3. Develop a plan to implement approved 7/15/89 and modif.ications to control moisture ingress 7/15/90(final) and submit annual reports on progress.

(P-85022 and P-85082)

4. Evaluate control of moisture in CRDM purge 7/15/89 system. (P-85021)(Focusonsystemeffectiveness)
5. PCRV Tendon Surveillance Requirements:
a. Incorporate the revised Tendon Surveillance Cancelled Program into the Technical Specifications. (P-85199)
b. Provide the results of the revised program 7/21/89 and to the NRC. one month after final depressuri-zation(final)

Revision 9 Page 2

6. Provide an improved CRDM~ surveillance Five months program which includes consideration of- after the start CRDM operational testing. (P-88012) of 4th refueling outage (not applicable)-
7. Provide a TS amendment to provide for chlorine 9/30/89
detection and appropriate er.crgency ventilation system actions.
8. Notify the NRC prior to disabling or removing -

the ACM system.

9. Control Room Modifications:
a. Prepare a summary document. 12/15/89
b. Maintain control room improvements for -

balance of plant life.

- _ ______--__ _ __ _ -