Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:NRC TO UTILITY
MONTHYEARML20058J0121990-11-16016 November 1990 Forwards Insp Rept 50-267/90-20 on 901029-1102.Violations Noted But Not Cited IR 05000267/19900161990-10-30030 October 1990 Discusses Insp Rept 50-267/90-16 on 900928 & 901018 Enforcement Conference & Forwards Notice of Violation ML20062B3971990-10-15015 October 1990 Forwards Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted ML20058A0941990-10-12012 October 1990 Confirms 901018 Enforcement Conference in Region IV Ofc Re Violations & Radiation Program Weakness Noted in Insp Rept 50-267/90-16.Proposed Agenda Encl ML20059N8231990-10-0303 October 1990 Forwards FEMA Final Radiological Emergency Preparedness Exercise Rept, for 891115 Exercise.One Deficiency & Several Areas Requiring Corrective Actions Identified ML20059C1381990-08-24024 August 1990 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 900605 Application,For Info ML20056B4021990-08-20020 August 1990 Forwards Insp Rept 50-267/90-11 on 900601-0728.No Violations or Deviations Noted ML20058M8681990-08-0808 August 1990 Forwards Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Identified.Licensee Commitment to Revise Manual Dose Assessment Procedure to Incorporate Appropriate Unit Conversion Factor,Noted ML20056A3601990-07-31031 July 1990 Forwards Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Actions Taken Re Previously Identified Insp Findings & Status Examined ML20055J3951990-07-31031 July 1990 Ack Receipt of 900713 Request for Exemption from FY90 Annual Fee Requirements of 10CFR171.Annual Fee Will Not Be Billed ML20059D1281990-07-30030 July 1990 Ack Receipt of 900713 Request for Full Exemption from FY90 Annual Fee Requirements of 10CFR171 for Plant.Annual Fee Will Not Be Billed While Request Under Review ML20055G5921990-07-19019 July 1990 Agrees W/Removal of B Helium Circulator,Per Requesting NRC Concurrence.Solution to Correct Leakage Problem by Removal of Circulator Acceptable ML20055D2031990-06-26026 June 1990 Ack Receipt of 900525 Response to 900402 Emergency Preparedness Insp Rept & 900427 Notice of Violation ML20055C8021990-06-18018 June 1990 Concludes That Financial Info Forwarded by Meets Requirements of 10CFR140.21 ML20248H7751989-10-0303 October 1989 Forwards Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted IR 05000267/19890081989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-08. Understands That Revised Flow Test Surveillance Procedures Performed on 890821 & 0921 & cross-connect Valves Stroked IR 05000267/19890171989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-17. Implementation of Corrective Actions Will Be Examined During Future Insps ML20248B2971989-09-26026 September 1989 Forwards Insp Rept 50-267/89-16 on 890716-0831 & Notice of Violation IR 05000267/19890121989-09-22022 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-267/89-12 ML20247L1381989-09-19019 September 1989 Advises That Request to Delete Requirement to Provide Status Repts on Performance Enhancement Program Approved.Updated List of Commitments Encl ML20247K4141989-09-15015 September 1989 Advises That Tech Specs Re Upgrade Program,Requested in NRC ,Must Be Approved by NRC Before Defueling ML20247K7741989-09-15015 September 1989 Informs That Partial Review of 890125 & 0320 Submittals Re Helium Circulators complete.Ten-yr Insp Recently Conducted on Circulator C-2105.Insp Revealed No Defects or Unacceptable Conditions ML20247D4691989-09-11011 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-15 ML20247H3431989-09-0808 September 1989 Ack Receipt of Informing NRC of Status of Security Sys Upgrades ML20247H2891989-09-0606 September 1989 Concurs W/Util 890714 Request for Changes to Basis for Limiting Condition for Operation 4.2.2 of Facility Tech Specs Re Statement About Automatic Initiation of Backup Bearing Water Sys ML20247B2661989-08-30030 August 1989 Forwards Summary of Region Iv/Senior Util Executives Meeting on 890818 in Arlington,Tx.Topics Discussed Included, Improving Communications,Salp Process in Region IV & Enforcement.List of Attendees & Agenda Encl ML20246J2911989-08-30030 August 1989 Forwards Amend 72 to License DPR-34 & Safety Evaluation. Amend Imposes Early Shutdown by Limiting Reactor Power to 2% of Full Power After 900630 ML20246E5941989-08-21021 August 1989 Forwards Insp Rept 50-267/89-14 on 890710-14 & Notice of Violation.Two Separate Findings of Missing Info in Semiannual Effluent Rept,Resulting in Failure to Satisfy Tech Spec Administrative Requirements Identified ML20246A2651989-08-16016 August 1989 Forwards Insp Rept 50-267/89-13 on 890626-30.Violations Noted But No Citation Issued.Expresses Concern About Status of Model FSV-1 & FSV-1A Shipping Casks ML20245J3511989-08-14014 August 1989 Forwards Amend 71 to License DPR-34 & Safety Evaluation. Amend Revises Provisions in Tech Specs Re Radiological Effluents ML20246A6841989-08-14014 August 1989 Forwards Exam Rept 50-267/OL 89-02 Administered During Wk of 890710 ML20245J5651989-08-10010 August 1989 Forwards Insp Rept 50-267/89-17 on 890717-21 & Notice of Violation ML20245J4421989-08-0808 August 1989 Forwards Safety Evaluation,Responding to Issues Re Tech Spec Upgrade Program & Defueling of Plant.Requests That Tech Spec Changes Be Requested within 30 Days of Ltr Date ML20245H3891989-08-0808 August 1989 Forwards Insp Rept 50-267/89-12 on 890601-0715 & Notice of Violation ML20248E0041989-08-0303 August 1989 Forwards Team Insp Rept 50-267/89-08 on 890522-26 & Notice of Violation.Response Should Include Corrective Actions Taken or Planned to Ensure That Reactor Water Cooling Sys 46 Operated as Designed IR 05000267/19890071989-07-28028 July 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-07 ML20247N7581989-07-26026 July 1989 Discusses Licensee 890616 Request Re Changes to Previous Commitments Concerning Plans to Shut Down Plant.Commitment 2c to Be Subj of Separate Correspondence.Commitment 7 to Be Considered Not Applicable.W/Revised Summary of Commitments ML20247M4521989-07-25025 July 1989 Forwards Request for Addl Info Re Reactor Defueling.Info Needed within 30 Days of Ltr Date ML20247M4281989-07-25025 July 1989 Responds to 890120 & 0616 Requests for Relief from Requirements of Fuel Surveillance Program.Nrc Considers Util Obligations Under Fuel Surveillance Program Will Terminate W/Planned Shutdown of Reactor by 900630 ML20247L9801989-07-14014 July 1989 Discusses 890711 Meeting in Region IV Ofc Re Introduction of AC Crawford & Future Plans for Facility.Slides Presented at Meeting & List of Attendees Encl ML20247L5971989-07-14014 July 1989 Forwards Insp Rept 50-267/89-15 on 890623-27 & Notice of Violation.Response Should Describe Corrective Actions to Assure That safety-related Changes Introduced by Other Parts of Organization Are Properly Incorporated Into Procedures ML20246M6941989-07-11011 July 1989 Forwards Agenda for 890808 Meeting of Senior Util Executives Sponsored by Region IV at Univ of Texas.Map to Facilitate Access to Meeting Room Also Encl ML20246F4851989-07-10010 July 1989 Discusses Util Re Alternative Compensatory Measures Instituted,Per Fire Protection Operability Requirement-16.Proposed Guidance Adequate ML20246J2791989-07-0707 July 1989 Forwards Safety Evaluation Concluding That Operators Role in Mitigating High Energy Line Break at Facility Acceptable. Technical Evaluation Rept Also Encl ML20245G4491989-06-22022 June 1989 Forwards Exam Rept 50-267/OL-89-01 Administered During Wk of 890523 ML20245G4831989-06-20020 June 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-06 ML20245F8161989-06-20020 June 1989 Proposes Meeting in Region IV to Discuss SALP Process in Region Iv,Improving Communication W/Licensee Mgt,Region IV Enforcement Philosophy,How to Improve Safety Performance & Topics Util Wishes to Discuss ML20245A2201989-06-15015 June 1989 Forwards Insp Rept 50-267/89-10 on 890501-31.No Violations or Deviations Noted ML20244C1221989-06-0808 June 1989 Forwards Insp Rept 50-267/89-07 on 890319-0430 & Notice of Violation ML20248B8741989-06-0505 June 1989 Forwards Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors, Task CE 025-4,for Use in Preparing Preliminary Decommissioning Plan for Plant 1990-08-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20128G1421996-09-25025 September 1996 Advises NRC Approved Decommissioning Plan, Impact Of... Fsv Final Decommissioning, Satisfies All Elements of License Termination Plan as Required by Rev to Reactor Decommissioning Rule 10CFR50.82(a)(9) ML20136B2561996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Falsification of Radiation Survey Records.Revised NOV Encl ML20136B2731996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Util Failure to Assure Compliance w/10CFR50.9 Concerning Accuracy of Radiation Survey Records. Revised NOV Encl ML20136B3241996-04-0202 April 1996 Informs That NRC Will Be Withdrawing NOV ,based on Reevaluation of Evidence Provided & Response to NOV ML20058G9671993-12-0707 December 1993 Ack Receipt of Ltrs of 931110,responding to Notice of Violation & Proposed Imposition of Civil Penalty Issued on 931013 IR 05000267/19930021993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Rept 50-267/93-02. Deficiency Determined to Have Contributed to 930527 Crane Overload Event IR 05000267/19930011993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/93-01 ML20056G0041993-06-25025 June 1993 Submits Info Re Implementation of Training Rule 10CFR50.120 for Licensees of Plant in Decommissioning Process ML20128D6931992-12-0101 December 1992 Forwards Exemption from Requirement in 10CFR50,app E,Section IV.F.2 to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise. EA & SE Also Encl ML20198C7511991-06-25025 June 1991 Suggests That Region Iv/Senior Util Executive Conference Be Held During Month of Sept 1991 in Arlington,Tx to Provide Open Forum for Candid Discussions Limited to Topics of General Interest & Not Pertain to Plant Specific Issues ML20058K0231990-11-30030 November 1990 Forwards Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted ML20062H8131990-11-29029 November 1990 Forwards Partially Withheld Insp Rept 50-267/90-18 on 901022-26 & Notice of Violation ML20062H2041990-11-21021 November 1990 Forwards Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted ML20058J0121990-11-16016 November 1990 Forwards Insp Rept 50-267/90-20 on 901029-1102.Violations Noted But Not Cited IR 05000267/19900161990-10-30030 October 1990 Discusses Insp Rept 50-267/90-16 on 900928 & 901018 Enforcement Conference & Forwards Notice of Violation ML20062B3971990-10-15015 October 1990 Forwards Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted ML20058A0941990-10-12012 October 1990 Confirms 901018 Enforcement Conference in Region IV Ofc Re Violations & Radiation Program Weakness Noted in Insp Rept 50-267/90-16.Proposed Agenda Encl ML20059N8231990-10-0303 October 1990 Forwards FEMA Final Radiological Emergency Preparedness Exercise Rept, for 891115 Exercise.One Deficiency & Several Areas Requiring Corrective Actions Identified ML20059C1381990-08-24024 August 1990 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 900605 Application,For Info ML20056B4021990-08-20020 August 1990 Forwards Insp Rept 50-267/90-11 on 900601-0728.No Violations or Deviations Noted ML20058M8681990-08-0808 August 1990 Forwards Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Identified.Licensee Commitment to Revise Manual Dose Assessment Procedure to Incorporate Appropriate Unit Conversion Factor,Noted ML20055J3951990-07-31031 July 1990 Ack Receipt of 900713 Request for Exemption from FY90 Annual Fee Requirements of 10CFR171.Annual Fee Will Not Be Billed ML20056A3601990-07-31031 July 1990 Forwards Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Actions Taken Re Previously Identified Insp Findings & Status Examined ML20059D1281990-07-30030 July 1990 Ack Receipt of 900713 Request for Full Exemption from FY90 Annual Fee Requirements of 10CFR171 for Plant.Annual Fee Will Not Be Billed While Request Under Review ML20055G5921990-07-19019 July 1990 Agrees W/Removal of B Helium Circulator,Per Requesting NRC Concurrence.Solution to Correct Leakage Problem by Removal of Circulator Acceptable ML20055D2031990-06-26026 June 1990 Ack Receipt of 900525 Response to 900402 Emergency Preparedness Insp Rept & 900427 Notice of Violation ML20055C8021990-06-18018 June 1990 Concludes That Financial Info Forwarded by Meets Requirements of 10CFR140.21 ML20248H7751989-10-0303 October 1989 Forwards Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted IR 05000267/19890171989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-17. Implementation of Corrective Actions Will Be Examined During Future Insps IR 05000267/19890081989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-08. Understands That Revised Flow Test Surveillance Procedures Performed on 890821 & 0921 & cross-connect Valves Stroked ML20248B2971989-09-26026 September 1989 Forwards Insp Rept 50-267/89-16 on 890716-0831 & Notice of Violation IR 05000267/19890121989-09-22022 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-267/89-12 ML20247K9051989-09-19019 September 1989 Advises That 890726 Request for Approval of Route to Transport Spent Reactor Fuel Approved.Route,From Facility to DOE Inel in Idaho,Encl ML20247L1381989-09-19019 September 1989 Advises That Request to Delete Requirement to Provide Status Repts on Performance Enhancement Program Approved.Updated List of Commitments Encl 1998-07-20
[Table view] |
Text
- - -
smy7- ,
, 7
'
^
Hl t
,
'
- m .
-
_
>
,
,' '
s
'
+
0CT:-2 N '
, , 5):
,In Rep 1'y Refer To:.
"
Docket: 50-E67/89-08
. . ' r
_
Public' Service Company of Colorado-m ; ATTN:: 2 A. Clegg Crawford, Vice President
, K ' Nuclear. Operations
- ,P.O.
- Box.-840~ .
"
'
's : Denver, Colorado 80201-0840
.. ,
' %. ~ Gentlemen:
,
1 .Thankiyou for your letter of' August 31, 1989, in response to our letter
,i . . ;and the attached Notice of> Violation dated August 3.1989.. As a result 4 fof ourLreview, we found that additional information, as discussed with your-
.
i
^
>
Mr. M. H.-Holmes (during telephone calls on September 21 and 22, 1989)
, was.needed.1 Specifically, we noted that the surveillance test procedures for the cross-connect' valves. and for the PCRV cooling water high flow alams had e . been' revised, but you_had not indicated that the cross-connect valves had been iL - '
foperated using.the revised procedures or that the.high flow setpoint values 1c . had been . verified to' be' correct.-
a. .
<
>
'It'is'our understanding, based on our conversations with Mr. Holmes, that the revised flow test surveillance: procedures were performed on August 21 and September 21, 1989, and that the cross-connect valves in' question were stroked on September. 22, 1989, using.the revised procedure. If our understanding of.
the above infomation is correct, no further response is required because we
' find your reply to be responsive to the concerns raised in our Notice of
. Violation. We will review the implementation of your corrective actions-during a future. inspection to determine that full compliance has been achieved and will be maintained..
Sincerely, en ' ' Drldnal Signed By J. L. Mihan
,
James L. Milboan, Director Division of Reactor Projects cc:-
-Fort St. Vrain Nuclear Station ATTN: .C. Fuller, Manager. Nuclear Production Division 16805 WCR 191 Platteville, Colorado 80651 a
- RIV:C:0PS *D:DRS P JEGagliardo/lb LJCallan- JLMilhoan y / /89 / - /89 ./0/7J8F
- Pfeviously concurred; i I
8910060077 89:002
'
f DR ADOCK 05000267 FDC b_ - - - _ _ _ _ - _ _ _ - _ _ _ _ _ - _ _ _ _
g rymym; y +
.
- p .y ,
- w . s
- - - - ,
~ ,
- P <'
'
'
,, fi;b ,ih m
. f2, 3$" ['.;Mff 'j % * M.
~
,
b/, 1 T 'b'. t(; ,) p; ; 3
9? t
- v;-
, h*h$ li$ '
+. *
'
I '
.$ '
'
'
> g g x J .e
'
. . .
<, .+.. .... . , .
es... '
'*iT<* "
- g , fM h p <It? .,frA fi c,n? -
t s '
,.. : ,
c -
-
4; ;p (hblMrvi$'Manyiof' Colorado ' -12l- ,
.n, e my
-
,
, -
' #'
M A'- )
o ; ,
, ,
t .
- ,7 - , .
.;- ,. . . .~_ <
.:t .
4 .: Fort.St. Vrain Nuclear Station 1 -
'
ic
'M ' Y ATTN:' 1P. Tomlinson' Manager' .. - 2 fMi" '. .-
16805 WCit191
- ; Quality Assurance Division: '
Q_ 'Platteville, Colorado 1 80651a - .
, ,.
,p g
'
, , f .
g 'M
- . , . . . -
,
Colorado: Public; Utilities Comission =
p "; ATTN:
4 1.JRalph Teague, P.E.-
^ '
g" ,.
,
1580 Logan Streeti.0Lic <
'
- Denver, Colorado 80203; '
Q+.y. - .
.
'
_, A,6 ; Colorado Radiation Control ~ Program Director-
.*, .
~.r , ,
n 'K 'bec~toDMB(IE0"1)': .
,
"
"
h1cc'distrib'.(byIRIV: S
'
.
. ,
^
-
"~
RRIi, .
R. D. Martin, RA' , . , - -
ESection Chief (DRP/B){ ProjectEngineer'(DRP/B)--
RPB-DRSS: ~
Lisa Shea, RM/ALF
, ,
<
- MIS' System' ( RSTS Operator; y ' , TK.e Heitner, NRR. Project Manager (MS:. '13-D-18)
' ' RIV. File
-
DRS:
'DRP ._. .' "" -
J . '
+
2 D. : Rv Hunter . ,
,
.
,,.t.. .
.
-
,'4, 4 ,
3 ' g
,,
6.r s * '4 ,
-
i, .. ,
y
- r, -.
L ,t k *
sd 4 g
' '
4.
-. - , ,
,, eh j.;fl
. ,
y- <
g..(
e ct i.
'{4'
'. t
, _ 2 .
-
Y
.~t,--
%
I -f
- 2-
- ,
.,
~ ,
,
r sp 4 t
l 1 1
~ i >
l ', / ii.
"
. e 1
,
) *4
,.s.
'
f ,:'f :, A , .--
,
n
'
k
-
>
r
, 4. : . - , ,
t
s
_ _
' .
'
!. .a '..
'
.
hPublic Service * lCh.
P.O. Box 840 Denver CO 80201- 0640 16805 WCR 19 1/2, Platteville, Colorado 80651 A. Clegg Crawford ucieb Ner"a'tions August 31, 1989
.
Fort St. Vrain Unit No. I P-89340
{bb $l U. S. Nuclear Regulatory Commission lh !
ATTN: Document Cantrol Desk SEP - 51989 l
a Washington, D.C. 20555 ;
L du{ t Docket No. 50-267 SUBJECT: NRC Inspection Report 89-08 REFERENCE: 1) NRC Letter, Milhoan to Williams, dated August 2, 1989 (G-89253)
2) PSC Letter, Brey to
'
-
Calvo, dated May 27, 1989 (P-88184)
3) NRC Letter, Hietner to Williams, dated April 19, 1989 (G-89145) -
4) PSC Letter, Crawford to Hebdon, dated June 16, 1989 (P-89218)
Dear Sirs:
This letter is in response to the Notice of Violation received as a result of the inspection conducted by Messrs. J. E. Gagliardo, D. R.
Hunter and R. B. Vickrey from May 22 to May 26, 1989. The following response to the items contained in the Notice of Violation is hereby submitted.
[ (./ '
w
_ _ _ _ _ _ _ _ _ __ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ - _
l
' ~ '
- .;
. . . .
l.
j. t ..
-
p y P-89340.. -2- August 31, 1989 b
.
IDENTIFICATION OF VIOLATION:
A) Inadequate Testing of Cross-Connect Valves
'
Technical Specification .SR 5.3.4 requires that valves that must be manually. positioned for actuation of the safe -
shutdown mode of operation "shall be tested for operability by partial stroking every 92. days unless they cannot be operated during normal plant operation. A full functional test shall be performed annually, or at the next scheduled plant. shutdown if such test was.not performed during the previous year, provided that the surveillance interval does not exceed 18 months".
Contrary to the above, the licensee has not included two of the manually positioned cross-connect valves (V-46121 'and
.V-46122) between the firemain and the reactor water cooling system, which are used for safe shutdown, in their sur_veillance test procedure (SR. 5.3.4c3-Ax), which annually tests other' valves of this type.
B) Failure To Test High Flow Alarms Technical Specification SR 5.4.5 requires that the PCRV cooling water system scanner alarms shall be functionally checked monthly and calibrated annually or at the next plant shutdown, not to exceed 18 months.
Contrary to the above, the PCRV cooling water system scanner high flow alarms were not included in the surveillance test procedures (SR 5.4.5-M and SR 5.4.5-A), and there was no evidence that the high flow alarms had been checked ' monthly or calibrated annually.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . -
,__ _ _ - _ - _ _ _ _ . _. _ - _ .
_ _ _ __
,.
v p v.
i-P-89340 -3- August 31, 1989 RESPONSE-TO ITEM A: INADEQUATE TESTING OF CROSS-CONNECT VALVES-1)' The Reason for the Violation If Admitted:
g
[ The violation is admitted.
Valves V-46121 and V-46122 provide the outlet flow path in .
the_once-through mode.of firewater cooling for the PCRV liner cooling system. Technical Specification SR 5.3.4-requires' testing of valves that must be manually positioned
.
- for actuation of the . safe shutdown cooling mode of
'
operation". The basis of SR 5. 3. 4. states that " Safe Shutdown Cooling, the systems or portions of systems
"
involved, are discussed in Section 10.3.9'and.10.3.10 of the FSAR and are represented in - FSAR, Figure 10.3-4". FSAR Section~10.3.9 states that " Conservatively, no credit is
< taken for PCRV liner cooling system heat removal during Safe Shutdown Cooling".
Although no credit is taken for PCRV liner cooling during Safe Shutdown Cooling, it is an available alternate cooling mode. Conservatively, PSC's intent is to test all such valves which may be manually positioned to initiate once through fire water cooling via the PCRV liner cooling system. . Surveillance procedure SR 5.3.4c3-AX, " Safe Shutdown. Cooling Manually Operated Valves" was developed for this purpose. Valves V-46121 and V-46122 were inadvertently omitted from the surveillance procedure when the procedure was orginally written.
2) The Corrective Steps Which Have Been Taken And The Results Achieved:
The flow path requirements for once through fire water cooling via the PCRV liner cooling system were re-reviewed.
V-46121 and V-46122 were the only two valves in the flow path that were found to be omitted. Surveillance procedure SR 5.3.4c3-AX has been revised to include V-46121 and V-46122.
3) The' Corrective Steps Which Will Be Taken To Avoid Further Violations:
No further corrective action is required.
4) The Date When Full Compliance Will Be Achieved:
Full compliance was achieved with the issuance of revised surveillance procedure SR 5.3.4c3-AX, " Safe Shutdown Cooling Manually Operated Valves", on September 1, 1989.
_ ___ _______- - _ ___ __ -
e i t 4 y c.1 ; ,
.. ....
. .; Q.,
^
- y,_ '@ \'
"
. s o .
P-89340. -4- August 31, 1989 1
~
RESPONSE TO ITEM B: FAILURE TO TEST HIGH FLOW ALARMS
-
.
1); The Reason For The-Violation If Admitted:.
'
,
.The violation is admitted.-
Technicali Spes:ification surveillance' requirement, SR 5.4.5, for " alarms" had been understood to apply to' the control room' annunciator, audible and visual, alarm which is actuated by.only low flow. This alarm is - not actuated by high flow. - Flows 'in excess _ of a predetermined programmed
.setpoint are not audibly alarmed but are identified with a series' of asterisks' printed next to the measured flow value
-
on the computer display console and on 'the flow scanner
" printout. The scanner must.be viewed, or a printout must be obtained, to determine if the programmed setpoint has been exceeded.
Surveillance requirement, SR 5.4.5, requires that a scanner flow readout-be obtained monthly. Since the readout depicts actual . flow and the programmed high flow setpoints, high flows 'are noted during review of the readout even. if the asterisks are not printed next to the actual value.
Conservative 1y', PSC had previously implemented surveillance procedure SR-RE-OP/RE-26-BiM " System 46 Flow And Temperature Scan Evaluation" to obtain a flow readout on a weekly basis.
High flows are checked on a more frequent basis than that specified in'the Technical Specifications.
I The high/ low flew setpoint values are contained in the scanner program and ' therefore do require periodic calibration. .The flow sensors are calibrated and correct sensor calibration values are verified by SR 5.4.5-AX2,
"PCRV Cooling Water Flow Scan Calibration".
. 2) The Corrective ~ Steps Which Have Been Taken And The Results Ar.hieved:
Surveillance procedure SR 5.4.5-M "PCRV Cooling Water Flow Scan Functional Test" has been revised to verify that a
L series of . asterisks are printed next to the measured flow 1- value on the flow scanner when the high flow setpoint has
! been exceeded. In addition, surveillance procedure SR l , 5.4.5-A1, "PCRV Cooling Water Flow Scan Calibration" has been revised to verify that the scanner program contains the correct high flow setpoint values.
L h
L - - - - - - - - - . - _ _ - - -___________--_ _ ---- _ --_ _ _ _
__
-4 .
,c .a. . ~
.
v .
h7 ~
, ,
' P-89340 -5- August 31, 1989 t
'
?
3) The Corrective Steps Which Will Be Taken To Avoid Further Violations:
No further corrective action is required.
. 4) The Date When Full Compliance Will Be Achieved:
Full Compliance was achieved with the issuance of revised surveillance procedure SR 5.4.5-A1, "PCRV Cooling Water Flow 4 Scan Calibration", on August 28, 1989.
In addition to the response directed by the Notice of Violation, Reference.1 requested the following:
'In addition to the response directed by the Notice of Violation, you are requested to provide in your response the corrective actions taken or planned regarding the operation of Reactor Water
' Cooling System (System 46) in a manner that will assure the system is . capable of performing .its design functica.
Specifically,'you are requested to address your practices of assuring that flow adjustments will result in closer monitoring of cooling water outlet temperatures, and will result in the
. appropriate. resetting of the high flow and low flow alarm set points.
You are also requested to provide your rationale for not testing, on a routine basis, the System 46 relief valves and check valves.
Additionally, you are requested to provide us your rationale for concluding that the System 46 surge tanks are not significantly degraded without periodic inspections. These items were all potential examples of a failure to test violation and are discussed. in paragraph 2.1.1 of the attached repert; however, rather than cite them herein, we offer you the opportunity to explain your position fully.
CORRECTIVE ACTION TAKEN REGARDING THE OPERATION OF SYSTEM 46:
Surveillance procedure SR-RE-26-BiM, previously SR-RE-0P/RE-26-BiM, " System 46 Flow and Temperature Scan Evaluation", has been revised. The procedure has been revised to monitor and evaluate cooling water temperatures in accordance with the frequency, methodology and criteria included in the last submittal of the Fort St. Vrain Upgraded Technical Specifications (Reference 2). NRC Preliminary concurrence with the Upgraded Technical Specifications is contained in Reference 3. The low and high flow setpoints have been reset as appropriate based on the methodology and criteria contained in SR-RE-26-BiM.
. _ _ . _ _ _ - - _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ -
_ , _ .
- -
....
.
p. ,
, . . . ..
P-89340 -6- August 31, 1989
.l CORRECTIVE ACTIONS REGARDING SYSTEM 46 RELIE? AND CHECK VALVE TESTING
,AND TANK INSPECTION:
A testing program for the relief valves in System 46 was being addressed under a plan to develop a comprehensive In-Service Inspection Program (ISI) at Fort St. Vrain. This ISI program was modified following the announcement to end operations no later than June, 1990. The plan was presented to the NRC in correspondence P-89218 (Reference 4). That letter specifies that a program to test valves will be developed and implemented 90 ' days after the start of defueling. This program will address the System 46 relief valves.
'
A formal check valve testing program is being implemented at Fort St.
Vrain. The program was reviewed with the NRC during this inspection visit. - The concern expressed, in the report, included the failure to consider the safety significance of valves in the selection process for the check valves to be tested using the acoustic monitoring technique. There was also a concern regarding the failure to define the- criteria for expanding the sample size based on negative test results. The nethod of selection of the check valves to be tested will be re-evaluated considering the following:
- the check valvt3 design to determine if it has been a problem for the industry; e.g. swing checks,
- whether recent maintenance, that would preclude the need to perform additional testing, had occurred.
This re-evaluation will focus on 6" and larger valves.
Techniques to be used in the program will include, as appropriate, acoustic monitoring, x-ray, backflow testing, and internal inspection. Specific criteria for expanding the sample, when
. problems are identified, will be included in a program document.
PSC previously did not have a preventive maintenance program that performed internal inspection of the surge tanks associated with
. System 46. An inspection could not be accomplished, without an extended plant outage, until after the discontinuation of plant operation in June,1990. Preventive maintenance activities for these tanks will be developed and placed on the integrated plant schedule after the start of defueling.
_ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _
-=
ym ;
G nw ;
-
l' .
c WN y,, _, 7. .:
1. m ;+;
- . . ..
. .,
'
.,
. 7. ,s
,
'l.. .
-7-
,
/ .
i -
. P-89340' August 31, 1989- 1
, i
-
,.
Should 'you' haveany_~ questions, please contact Mr. M. H. Holmes at (303)480-6960.
Sincerely,
~
'
,
m
'
a//A'A A. Clegg Crawford :
.
Vice President
. Nuclear Operations.
ACC:DLWbw
- cc: _ Region'IV R. Farrell e
'
_ - - - _ - _ . - _ _ - - _. _ -_ __._--_ _______-_ - - _ _._..__- - _._-____ - .-___ -__ -