Other: ML20087D526, ML20091E427, ML20091E667, ML20096C267, ML20101P455, ML20101T673, ML20128N324, ML20128Q523, ML20132D461, ML20133E065, ML20133G264, ML20134E393, ML20135B283, ML20137G089, ML20137M414, ML20138M184, ML20141G663, ML20141P193, ML20148G166, ML20149E148, ML20155G379, ML20197B758, ML20198D937, ML20202F052, ML20204G480, ML20205D265, ML20206B182, ML20207E030, ML20207Q913, ML20209C232, ML20211G583, ML20212M102, ML20214P255, ML20214P273, ML20214S958, ML20214U381, ML20214U731, ML20214X272, ML20215G796, ML20215L534, ML20216D570, ML20216E230, ML20235F214, ML20235G486, ML20236C261, ML20236G303, ML20236H463
|
MONTHYEARML20087D5261984-03-0202 March 1984 Requests Exemption from Requirements of Sections Iii.G,J,L & O to 10CFR50,App R.Fire Protection Provisions Believed Adequate to Protect Health & Safety of Public in Event of Accidents Involving Fires.Affidavit Encl Project stage: Other ML20091E6671984-05-10010 May 1984 Forwards List of Correspondence on Fire Protection,Per 840427 Request.List Identifies Ltrs Originated from NRC & Util Relevant to Fire protection,10CFR50,App R,Branch Technical Position 9.5-1,cable Separation & Plant Issues Project stage: Other ML20091E4271984-05-11011 May 1984 Forwards Summary of Fire Protection Review to Determine Conformance of Facility to Section Iii.G of 10CFR50,App R, Per 840427 Commitment.Fire Protection Provisions Adequate Project stage: Other ML20092M5471984-06-22022 June 1984 Responds to 840608 Meeting Re Application of 10CFR50,App R Fire Protection Requirements to Facility.Schedule for App R Review & Submittal & Proposed Fire Protection Regulatory Guidance Resolving HTGR Issues Encl Project stage: Meeting PNO-IV-84-014, on 840623,reactor Tripped on High Pressure Signal & 6 of 7 Control Rod Pairs Failed to Drop.Cause Unknown.Drive Mechanisms Will Be Removed for Exam1984-06-25025 June 1984 PNO-IV-84-014:on 840623,reactor Tripped on High Pressure Signal & 6 of 7 Control Rod Pairs Failed to Drop.Cause Unknown.Drive Mechanisms Will Be Removed for Exam Project stage: Request ML19318H9481984-06-26026 June 1984 Summary of 840608 Meeting W/Util in Bethesda,Md Re Fire Protection Issues at Plant.List of Attendees & Meeting Agenda Encl Project stage: Meeting ML20090C5261984-07-0606 July 1984 Responds to NRC Concerns Re Fire Protection Review,Bldg 10 Licensing Requirements,Control Rod Failure to Scram, Documentation of Disciplinary Actions,Clearance Tags & Radiological Emergency Exercise Scenario,Per 840625 Meeting Project stage: Meeting ML20096C2671984-08-17017 August 1984 Forwards Revised Schedule for App R Review,Submittals,Plant Mods & Fire Protection Safe Reactor Shutdown/Cooldown Capability Incorporating NRC Concerns & Comments Project stage: Other ML20101P4551984-12-14014 December 1984 Advises That Final Installation of Oil Mist Detection Sys Completed Wk of 841105,per 840625 Commitment.Sys Inoperable During Initial Checkout.Manufacturer Repaired & Balanced Entire Sys on 841115,however,on 841121 Sys Inoperable Again Project stage: Other ML20101T6731985-01-25025 January 1985 Forwards Table 5.0.1,omitted from Rept 3 of App R Fire Protection Evaluation,Originally Submitted by Project stage: Other ML20128Q5231985-05-15015 May 1985 Responds to Re Contradictory Statements Submitted in Three Util Ltrs.Circulator Speed Instruments Not Relied Upon in 10CFR50,App R,Re Fire Protection Evaluation Because of Close Proximity Between Loops Project stage: Other ML20128N3241985-05-17017 May 1985 Informs of Completion of Mod Work to Automate G&J Wall Sprinkler Sys,Per 840817 App R Commitment Project stage: Other ML20132D4611985-07-11011 July 1985 Documents 850708 Telcon Re Interim Fire Protection Measures Committed to in or Lee .Fire Watch Frequency Increased.Personnel Will Carry Flashlights at All Times Per Operating Order 85-11,prior to Plant Startup Project stage: Other ML20133G2641985-07-16016 July 1985 Documents 850715 Telcon Re App R Fire Protection Evaluation Schedule.Util Will Complete Mod Item 4.2 Re Penetration Seals by 850717.Revised Completion Date Allows for Installation of Final Seal,Surveillance Testing & Sign Offs Project stage: Other ML20132F0721985-07-19019 July 1985 Safety Evaluation Documenting Deficiencies in Licensee Program for Environ Qualification of Electric Equipment Important to Safety.Licensee Response to Generic Ltr 84-24 Inadequate.However,Operation at 15% Power Authorized Project stage: Approval ML20132F0231985-07-19019 July 1985 Forwards Safety Evaluation Re Environ Qualification of Electric Equipment Important to Safety & Authorizes Interim Operation in dry-out Mode at Max 15% of Rated Power,Based on Listed Conditions,Until Technical Review Completed Project stage: Approval ML20133H5331985-08-0202 August 1985 Requests Assessment of Consequences of Loss of Shutdown Sys Due to Fire in Bldg 10,as Part of Review of Fire Protection Features at Plant.Evaluation Requested within 30 Days of Ltr Date Project stage: Approval ML20134E3931985-08-0505 August 1985 Submits Info on Status of Mods Proposed in 850401 Rept 4 Re Exemptions & Mods to App R Fire Protection Evaluation.Listed Mods Complete Project stage: Other ML20137G0891985-08-0808 August 1985 Notifies of Delay in Obtaining All Replacement Fire Door Matls,Per ,Due to Door to Hardware Compatibility Problems W/Facility Security Sys.Matls Will Be Delivered by 851015 Project stage: Other ML20135B2831985-08-30030 August 1985 Provides Info to Resolve Questions & Concerns Identified in Review of Repts 1-4 for App R Evaluation & Rept 5 for Branch Technical Position 9.5-1,App a Evaluation of Bldg 10.Page Changes for Repts 1-5,incorporating Resolutions,Encl Project stage: Other ML20205D2651985-09-0303 September 1985 Informs of Fire Detection Sys Design Status.Initial Change Notice Providing Detection Device Design & Location Issued on 850901,per 850401 Commitment.Installation Expected by 860201 Project stage: Other ML20133E0651985-09-10010 September 1985 Responds to NRC Re Violations Noted in Insp Rept 50-267/85-16.Corrective Actions:Design for New Storage Ctr Initiated Project stage: Other ML20138M1841985-10-14014 October 1985 Clarifies Commitment Dates in Util Re Proposed Mods Per 10CFR50,App R Fire Protection Evaluation.Remaining Mods Expected to Be Completed During Refueling Outage Project stage: Other ML20136J3161985-11-0101 November 1985 Forwards Questions Re Manual Operations & Instrumentation Based on Review of 841116-1217 & 850117 & 0401 Submittals of App R Safe Shutdown Models.Addl Info Requested within 30 Days of Ltr Receipt Project stage: Approval ML20138P3311985-12-20020 December 1985 Forwards Response to 851101 Request for Addl Info Re App R Safe Shutdown Model.Steps Included in Fire Protection Shutdown Procedure for Operators to Properly Position motor- Operated Valves Project stage: Request ML20137M4141986-01-21021 January 1986 Informs of Updated Efforts to Implement Fire Detection Sys. Completion Anticipated by 860601.As Result of extension,24 H Fire Watch Will Continue as Stated in Interim Measures of Rept 4 Project stage: Other ML20141P1931986-03-14014 March 1986 Forwards Info/Clarification for Open Items & Revised App R Fire Protection Evaluations (Repts 1-4) & Fire Hazards Analysis & Evaluation of Bldg 10 (Rept 5) Project stage: Other ML20202F0521986-04-0404 April 1986 Forwards Valve Position & Alignment Justification & Revs to App R Repts 1 & 3 Incorporating Manual Pressurization Sys for Helium Circulator Brake & Seal Sys Into Shutdown Model, Per 860314 Commitment Project stage: Other ML20141G6631986-04-17017 April 1986 Requests Util Evaluate Encl NRC 851222 Press Release Re New Criteria for Granting Exemptions from 10CFR50 to Determine If Exemptions from App R Fire Protection Requirements Still Required.Info Requested within 60 Days Project stage: Other ML20155G3791986-04-28028 April 1986 Requests That 850401 Exemption from Sections Iii.G & Iii.J of App R & 10CFR50.12(a) Re Fire Protection Be Granted.List of Exemptions Encl Project stage: Other ML20198D9371986-05-15015 May 1986 Forwards App R Evaluation Re Valve Position & Alignment,As Encl to Walker ,Per Request Project stage: Other ML20202G6441986-07-10010 July 1986 Informs of Plans to Submit Documentation Re Results of CRD Improvements Integrated Sys Study by 860815.Requests NRC Confirmation of Submittal Date Project stage: Request ML20207F3771986-07-15015 July 1986 Forwards Supplemental Info to 860314 & 0404 Submittals Re Local Manual Operations Required for Fire in Each Area & Assessment of Adequacy of Present Staffing Levels to Accomplish Fire Protection Shutdown Project stage: Supplement ML20204C1671986-07-22022 July 1986 Responds to 860428 Request for Exemption from Fire Protection Requirements,Per 10CFR50.12.Although Technical Review Not Completed,Submittals Adequately Address Criteria. Request for Relief from 10CFR50.48 Cannot Be Acted Upon Project stage: Approval ML20204G4801986-07-31031 July 1986 Informs That 860710 Request for Delay of Submittal of Integrated Sys Study Until 860815 Acceptable.Revised Listing of Commitments,Updated to Reflect Completion of Items 11 & 16b,encl Project stage: Other ML0311502641986-08-20020 August 1986 Withdrawn NRC Generic Letter 1986-014: Operator Licensing Examinations Project stage: Request ML20212N4711986-08-26026 August 1986 Forwards Safety Evaluation Approving Util 850401 Exemption Requests from Requirements in 10CFR50.40 & 10CFR50,App R, Section Iii.J Re Emergency Lighting Project stage: Approval ML20212N4761986-08-26026 August 1986 Safety Evaluation Approving Licensee 850401 Exemption Request from Requirements in 10CFR50,App R,Section Iii.J Re Emergency Lighting Project stage: Approval ML20214S9581986-09-25025 September 1986 Requests That Util Take Listed Actions Re Three Repts Submitted Concerning Firewater Cooldown Analysis,Per NRC Review & 860917 Telcon.Response to Item 1 Requested within 15 Days of Ltr Date & Item 2 at Time Analysis Submitted Project stage: Other ML20215G7961986-10-10010 October 1986 Advises That Info Requested in NRC Re Best Estimate Schedule for Resolution of Problems Encountered W/Firewater Cooldown Analysis Will Be Submitted as Part of Util Graduated rise-to-power Program Project stage: Other ML20197B7581986-10-16016 October 1986 Notifies of Development of Fire Protection Program Plan at Plant in Accordance W/Requirements of 10CFR50.48(a),per 860314 Commitment.Plan Includes Updated Fire Hazards Analysis for Each Plant Fire Area Project stage: Other ML20211G5831986-10-22022 October 1986 Anticipates Completion of Steam Generator Analysis & App R Modeling Reanalysis Work by Feb 1987,per 860918 Telcon W/Nrc Re Steam Generator Cool Down Studies for App R Project stage: Other ML20215L5341986-10-23023 October 1986 Staff Requirements Memo Re Commission Briefing in Washington,Dc on Status of Facility Project stage: Other ML20214G1411986-11-18018 November 1986 Draft Safety Evaluation Supporting Util 850401 Request for Exemption from 10CFR50,App R Requirements Re Fire Protection & Proposed Safe Shutdown Sys.Related Info Encl Project stage: Draft Approval ML20214G1091986-11-18018 November 1986 Forwards Draft Fire Protection Safety Evaluation Supporting Util 850401 Request for Exemption from 10CFR50,App R Requirements & Proposed Safe Shutdown Sys.Status Rept on Listed Items & Comments Re Draft Evaluation Requested Project stage: Draft Approval ML20214P2551986-11-20020 November 1986 Forwards Updated & Condensed Version of Const Schedule for Proposed App R Mods,Per Request Project stage: Other ML20207E0301986-12-29029 December 1986 Forwards Corrected Schedule of Proposed App R Mods Noted in .Mod Re Emergency Lighting Will Be Completed,As Discussed in 860826 Ser,Within 12 Months Following NRC Approval Project stage: Other ML20235J4001987-01-16016 January 1987 Forwards Comments on Draft Fire Protection SER Project stage: Draft Other ML20209C2321987-01-23023 January 1987 Advises Util to Complete App R Mods to Facility Expeditiously.Staff Considers Dates in 861120 & 1229 Ltrs as Commitments.Nrc Considering Rev to Listing of Util Commitments Re Operation of Facility Project stage: Other ML20207Q9131987-02-27027 February 1987 Requests Concurrence to Reduce Roving Fire Watch,Committed to in Util ,To Hourly Fire Watch for Turbine Water Removal Pumps Effective on 870325.New Fire Detection Sys Described in Util Installed Project stage: Other 1985-09-03
[Table View] |
Text
"
,:, :.s
,...
,
.
Y
~ APPENDIX
'
-
U.S. NUCLEAR REGULATORY ~COMISSION REGION IV,
NRC Inspection Report: '50-267/87-01 License:
DPR-34 Licensee:
Public Service Company of Colorado-(PSC)
P. 0.-Box 840-Denver, Colorado - 80201-0840.
Facility Name:
Fort St.-VEain Nuclear Generating-Station (FSV)
~
l Inspection At:
Platteville, Colorado
'InspectionConducted:iFebruary'2-6,1987:
.
.
' Inspector:
M
_
Ad7h7 -
i M. E. Murppy, Pn6jecFInspector, Project Dat'e Section/B, Reactor Projects Branch
i
.
Approved:
bC C
Sk
D. R. Hunter, Chief, Project Section B, Date Reactor Projects Branch
- .
Inspection Summary
>
Inspection Conducted February 2-6, 1987 (Report 50-267/87-01)
l Areas Inspected:
Routine, unannounced inspection of fire protection / prevention program and implementation.
Results: Within the area inspected, no violations or deviations were identified.
l-L-
8703180220 870304 l.
PDR ADOCK 05000267 O
PDR
.
'*
'e b-2-
DETAILS 1.
Persons Contacted
'
- W. Dender, Jr., Nuclear Licensing Coordinator
- D. Edmiston, QA Training Engineer
- D. Evans, Superintendent, Operations
- M. Ferris, QA Operations Manager
- M. Holmes, Nuclear Licensing Manager
- T. McIntire, Supervisor, Nuclear Site Engineering
- F. Novachek, Technical / Administrative Services Manager
- G. Schmalz, Fire Protection Engineer
- A. Stithem, OIAG Coordinator J. Switzer, Training Instructor
- P. Tomlinson, Manager, QA F. Trujillo, Senior Designer
,
The NRC inspector also contacted other licensee personnel including administrative, clerical, and operations personnel.
- Denotes those attending the exit interview.
2.
Status of Previously Identified Inspection Items (Closed) Violation 267/8412-10, Failure to Maintain Fire Barrier Penetration Sealed: The licensee has sealed the specific penetration.
Fire area boundaries and boundary ratings are being completely redefined as part of the overall Appendix R compliance review. These aspects will be evaluated during the scheduled Appendix R inspection. This item is
'
closed.
(Closed) Deviation 267/8412-09, Failure to Meet Commitments in Res)onse To Branch Technical Position 9.5-1: The licensee has removed the )ulk combustible material from the reactor building and established, by
procedure revision, administrative controls for bulk combustibles. The
'
hydraulic oil mist detectors had been installed and were operable. The additional fire detectors in various locations have been added. This work i-was accomplished under CN-846, approved May 16, 1985, and completed January 14, 1987. This item is closed.
'.
(Closed) Unresolved Item 267/8412-06: This item was pending the l
licensee's investigation and acquisition of documentation confirming that
'
Overly Manufacturing Company was authorized to double label a fire area boundary door for both bullet proof and fire proof ratings. By letter
,
dated August 14, 1984, from Underwriters Laboratories, Inc. to PSC, the
'
licensee now holds adequate documentation that the Overly Manufacturing l
Company is properly listed with UL for both rating categories. This item l
'is closed.
!
I
. - - - -.
.
+
.
y :.pg
"
,
-
-3--
~
.(Closed) Unresolved Item 267/8412-07:.ThisLitem was pending resolution of:
-
.the: questionable exposed metal structural members throughout the plant.
The specific. item of concern was the exposed metal I-beam cap on the
'3-hour fire rated wall separating level 5 into two fire areas in building 10.-
The licensee.has now. classified level 5 of building 10 as one fire area'and the I-beam was not structurally required in the' abutting
'
walls.
The item is' closed.
(Closed) Unresolved Item 267/8412-08:
This item was pending the licensee's decision and action in assigning a specific individual to
-
handle the overall. day-to-day management of'the fire protection / prevention program onsite.
The licensee has hired a full-time fire protection
^
engineer.into their Nuclear Engineering Division. -This individual is well qualified and presently spends a significant amount of his time-onsite.
Future plans lare to assign an onsite individual the day-to-day management of-the program.
This itam is closed.
'(Closed) Open Item 267/8412-03:
This item was open pending installation 1
,
.and satisfactory testing of a remote alarm / trouble indication in the control-room for areas of' building 10 that contain or are planned to contain' safety-related equipment..The licensee issued CN-846 to install the' indication.
This CN was completed January 14, 1987.
This item is
- closed.
>
,
.
(Closed) Open Item'267/8412-04:
This; item was open pending installation.
and successful,.' testing of battery room 1C air flow indication.
The licensee issued CN-1849'to install an' air' flow indication and remote alarm in the control ~ room.
This.CN-1849 physical-installation and testing has been completed. This item is closed.
(Closed) Open Item 267/8412-05: 'This item was open pending the 1icensee's
.
action to establish a unit identification system for portable extinguishers.
The licensee' issued CN-1674 to' renumber plant fire
!-
extinguishers and hose stations.
This CN was completed May-20, 1985.
'
-This item is clo' sed.
3.
Fire Protection / Prevention Program This inspection was to evaluate the overall adequacy of the licensee's program and to determine that the licensee was implementing the program in
'
conformance with regulatory requirements and industry guides and i
standards, sThe NRC inspector ^ reviewed the following FSV procedures:
s Number Title Date
ADM-P-8 Fire Fighting and Prevention 03/26/86 SMAP-24 Fire Prevention Work Permit 01/02/86
,
-
,
,
+
/
t. 7.,
.
'
.
QAMP-P-8-1-Quality Assurance Monitoring Checklist ^
Fire Brigade Training and Fire Drill 09/06/85-PGEP-14 Fire Prevention / Protection Policy 02/01/82 50P 45-01 Fire Protection System 06/13/85 50P 45-02 Halon Fire Extinguishing Systems 04/30/85'
MAP-17 Requirements During Performance of Maintenance on FSV Fire Rated Doors 07/24/86 PM 45.9 Preventive Maintenance on Fire Water Deluge Valves 05/01/85 TPAM Situation Response Training Program -
Fire Fighting 01/29/86
/
'EP-I
~ Discussion of Fire 08/14/84 FSP-1 Fire Fighting Organization and Responsibilities 04/01/86 FSP-2 General Instructions 10/27/83 FSP-3 Portable Fire Extinguisher Use 10/14/86 FSP-4 Hose Water Streams in Fire Fighting Near Live Electrical Apparatus, Inside the Plant 06/10/86 FSP-6 Halon System Operation 12/29/82 FSP-7 Carbon Dioxide Extinguishing Systems 12/29/82 FSP-8 Emergency Breathing Equipment 06/14/82 FSP-10 Flammable and Hazardous Compressed Gases 10/07/86 FSP-11 Fire Fighting Response Guidelines and Specific Area Preplans 01/07/87 FSP-12 Hazardous Material Marking 12/29/82 FSP-13 Hydraulic Oil Isolation Valve Locations and Guidelines 04/22/83 FSP-14 Additional Fire Fighting Equipment 10/18/83 FSP-15 Use of Portable Smoke Ejectors 01/07/87
....,
-5-This review verified that the licensee had technically adequate procedures to implement the fire protection program.
Procedural guidance was provided to control combustible material and reduce fire hazards.
Administrative procedures also provided for maintenance and surveillances on fire suppression, detection, and support equipment. Personnel training, qualifications,'and responsibilities were adequately provided.
Maintenance evolutions that significantly increase fire risk were properly controlled.
The NRC inspector toured accessible areas of the plant site for general area condition, work activities in progress, and visual condition of fire protection systems and equipment. Combustible materials, flannable and combustible liquid and gas usage were restricted or properly controlled in areas containing safety-related equipment and components.
Items checked included positions of selected valves, fire barrier condition, hose stations, hose houses, halon systems lineups, fire lockers; and fire extinguishers for type, location, and condition.
During this tour, the NRC inspector noted two fire doors, between the reactor building and building 10, that were not closing completely due to the air pressure differential. The licensee representative accompanying the NRC inspector took imediate action to have the door closing mechanisms adjusted to provide positive closure for the doors.
There was no welding, cutting, or use of open flame ignition sources found in the areas toured. There were no construction activities in progress in the toured areas. There was some maintenance work noted. General housekeeping conditions _were found to be excellent.
Fire protection systems and equipment installed for protection of safety-related areas were found to be functional and tested in accordance with the requirements specified in the Technical Specifications.
Fire brigade equipment, including emergency breathing apparatus, was found to be properly stored and maintaired.
The NRC inspector also reviewed fire brigade training and drill records.
The records were in order and confinned that training and drills were being conducted at the specified intervals.
The last annual in-house QA audit in the area of fire protection, NFSCH-86-1 dated August 14, 1986, was reviewed by the NRC inspector. The audit was comprehensive and indepth. System / equipment alterations, tests, surveillances, maintenance, and records were addressed. Discrepancies identified were formally presented to the affected organization. Responses were tracked to closeout and actions taken were reviewed for adequacy.
These discrepancies were issued as Correction Action Requests (CAR).
During this audit review, the NRC inspector reviewed CAR-85-091 and CAR-85-092. CAR-85-091 dealt with the fire rating of the east wall of the
.
.,
. - -
.
-. - -
-
.
.
.
-
w..,.
.
-6-
,
auxiliary boiler room and had been closed by QA with no apparent problems.
CAR-85-092 dealt with the compliance of the suppression systems for the "J" and "G" walls to the installation requirements of NFPA-13. This CAR had also been closed by QA and had an extensive history of correspondence between the licensee's engineering group, the licensee's insurer, Professional Loss Control, Inc., and the licensee's fire protection
.
consultant, TENERA Corporation. The documentation package did not appear l
to support the final closure of this CAR because it did not address the concerns raised in the last Professional Loss Control, Inc., memo of
- April 3,1986. This issue will be referred to NRR for review. Pending e
i.
NRR disposition and subsequent review this matter will be considered an unresolveditem(267/8701-01).
'
There were.no violations or deviations identified in this area of ~ the i
inspection.
4.-
Unresolved Items An unresolved item is a matter about which more infomation is required to
,
detemine whether it is acceptable, a violation, or a deviation. One unresolved item is discussed in this report in paragraph 3.
h.
5.
Exit Interview
!
i An exit interview was conducted on February 6,1987, with those personnel
denoted in paragraph 1 of this report. At this exit interview, the NRC l
inspector summarized the scope and findings of the inspection.
,
'.
,
.
ji l
!
- -
-
..
-.
.
.
.
-
- -
.
.
. - - -.
-