Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21
ML20198K193
Person / Time
Site: 07200009, Fort Saint Vrain  Xcel Energy icon.png
Issue date: 10/10/1997
From: Fisher M
PUBLIC SERVICE CO. OF COLORADO
To: Haughney C
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
P-97044, NUDOCS 9710230184
Download: ML20198K193 (4)


Text

.

. _ SAFEGUARDS l' (gC ) PuticService' INFORMATlON ,,,,,,a.,.

Company of Colorado sso isen street, suae no Denver, Co 8020242s6 October 10,1997 FAX (303) 5717877 Fort St. Vrain ISFSI P-97M4 U.S, Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 ATTN: Mr. Charles J. Haughney, Acting Director Spent Fuel Project Office Docket No. 72-9

SUBJECT:

ISFSI Physical Security Plan, Proposed Issue 4

REFERENCE:

PSCo letter, Fisher to NRC Document Control Desk, dated May 14,1997 (P-97032)

Dear Mr. Haughney:

This letter provides supplemental information in support of Public Service Company of Colorado's (PSCo) proposed revis;on to the Physical Security Plan for the Fort St. Vrain Independent Spent Fuel Storage Installation (ISFSI), previously submitted via the referenced letter.

The proposed changes -to the ISFSI Physical Security Plan are associated with the relocation of security personnel and equipment to a new Entrance Building recently installed at the ISFSI site. These relocation activities will eliminate the need to use ==e facilities on the repowered Fort St. Vrain Generating Station site, and are in preparation e!L.

for transferring the ISFSI materials license, License No. SNM-25M, to the U.S. E Department of Energy. g The proposed Issue 4 of the ISFSI Physical Security Plan that was submitted via the referenced letter, reflected the relocation of security program provisions to the new h

E Entrance Building. During subsequent discussions with NRC reviewers, it was EEE' determined that a redundant location to monitor security alarm status was also required to be consistent with current guidance. The proposed changes submitted with this letter reflect the addition of a backup alarm station. For completeness, the entire Physical Security Plan, Proposed Issue 4, is included with this letter. Also, a complete I

. justification of changes is provided. and the information orovided with the previous V submittal is so noted. 971$.c30184 971010 PDR ADOCK 05000267

/ ,(n A

~

Y PDR MNRE QNTES h[{q

.1:'

- - - SAFEGUAHDS SmGUARDS D@ORMEON I\

lNFORMATION UPON SEPARGON DBS PAGE!$ DEGNTROMED

. .