Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21
ML20198K193
Person / Time
Site: 07200009, Fort Saint Vrain  Xcel Energy icon.png
Issue date: 10/10/1997
From: Fisher M
PUBLIC SERVICE CO. OF COLORADO
To: Haughney C
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
P-97044, NUDOCS 9710230184
Download: ML20198K193 (4)


Text

.

SAFEGUARDS l'

(gC ) PuticService' INFORMATlON

,,,,,,a.,.

Company of Colorado sso isen street, suae no Denver, Co 8020242s6 October 10,1997 FAX (303) 5717877 Fort St. Vrain ISFSI P-97M4 U.S, Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 ATTN:

Mr. Charles J. Haughney, Acting Director Spent Fuel Project Office Docket No. 72-9

SUBJECT:

ISFSI Physical Security Plan, Proposed Issue 4

REFERENCE:

PSCo letter, Fisher to NRC Document Control Desk, dated May 14,1997 (P-97032)

Dear Mr. Haughney:

This letter provides supplemental information in support of Public Service Company of Colorado's (PSCo) proposed revis;on to the Physical Security Plan for the Fort St. Vrain Independent Spent Fuel Storage Installation (ISFSI), previously submitted via the referenced letter.

The proposed changes -to the ISFSI Physical Security Plan are associated with the relocation of security personnel and equipment to a new Entrance Building recently installed at the ISFSI site. These relocation activities will eliminate the need to use

==e,

facilities on the repowered Fort St. Vrain Generating Station site, and are in preparation e!L.

for transferring the ISFSI materials license, License No. SNM-25M, to the U.S.

E Department of Energy.

g The proposed Issue 4 of the ISFSI Physical Security Plan that was submitted via the h

referenced letter, reflected the relocation of security program provisions to the new E

Entrance Building.

During subsequent discussions with NRC reviewers, it was EEE' determined that a redundant location to monitor security alarm status was also required to be consistent with current guidance. The proposed changes submitted with this letter reflect the addition of a backup alarm station. For completeness, the entire Physical Security Plan, Proposed Issue 4, is included with this letter.

Also, a complete I

. justification of changes is provided. and the information orovided with the previous V submittal is so noted.

971$.c30184 971010

/

,(n A PDR ADOCK 05000267 h[{q Y

PDR

.1:'

SAFEGUAHDS MNRE QNTES

~

SmGUARDS D@ORMEON I\\

lNFORMATION UPON SEPARGON DBS PAGE!$ DEGNTROMED

..