Forwards Insp Rept 50-267/89-10 on 890501-31.No Violations or Deviations Noted
ML20245A220
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/15/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20245A221 List:
References
NUDOCS 8906210156
Download: ML20245A220 (2)


See also: IR 05000267/1989010

Text

_,

,

9

.- .

. P. .

.

.

'

h l5 BB0

In Reply Refer to:

Docket: -50-267/89-10

.

Public Service Company of Colorado.

ATTN: Robert 0. Williams,' Jr.

Senior Vice President, Nuclear Operations'

P.O.' Box 840

Denver, Colorado 80201-0840

Gentlemen: , , ,

4 s

ThisreferstotheinspectionconductedbyMessrs.'E.E.Farrellandl

P. W. Michaud of this office during the period May 1-31,1989, ~ of' activities .

.

authorized by NRC Operating License DPR-34 for: Fort St. Vrain' Nuclear '

Generating Station, and to the discussion of our findings with Mr. C. ' Craw'fordi ,

'

and other members of your staff.at the conclusion of.the inspection. -

Areas examined during the inspection included onsite followup of licen'see~ event

reports, -licensee action on previously' identified inspection findings,

operational safety verification, monthly surveillance observation, and monthly >

maintenance observation. Within these areas, the inspection ~ consisted of.

~

selective examination of procedures and representative records, _ interviews with

personnel, and observations by the inspector. The inspection findings are

documented in the enclosed inspection report. ,

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously.  ;

identified inspection findings. The status of these' items is identified in '

paragraph 4 of the enclosed report.

Should you have any' questions concerning.this inspection, we will be pleased to

discuss them with you.

Sincerely,

Odginsi signed By.

[ T hAkW

J. L. Milhoan, Director

.!

Division of Reactor Projects  ;

1

Enclosure: (see next page)

RIV: SRI'd h RI Yh DRP/B 2 b ' C:DRP/B b

h/

D:D l

REFarrell/kc PWMichaud RPMullikin TFWesterman JkMilhoan

6/ 6/89 s //f/89 g //f/89 6/ry/89 - 6 //8/89  !

..

l

p m m m y e7

-

$

'

. _ _ _ _ _ _ _ _ _ _ .__ _ _ . _ _ _ _ _ . . _ _ _ __

. .

j

,

.

Q

Public Service Company of Colorado -2-

Enclosure:

Appendix - NRC Inspection Report

50-267/89-10

cc w/ enclosure:

Fort St. Vrain Nuclear Generating Station

ATTN: C. Fuller, Manager

Nuclear Production Division

16805 WCR 19 1/2

Platteville, Colorado 80651

Fort St. Vrain Nuclear Generating Station

ATTN: P. Tomlinson, Manager

Quality Assurance Division

16805 WCR 19 1/2

'

Platteville, Colorado 80651

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

ATTN: Ralph Teague, P.E.

1580 Logan Street OL1

Denver, Colorado 80203

l bec to DMB (IE01)

bcc distrib. by RIV:

  • RR1 *R. D. Martin, RA
  • Section Chief (DRP/B) * Project Engineer, DRP/B

l *RPB-DRSS Lisa Shea, RM/ALF

  • MIS System *RSTS Operator
  • K. Heitner, NRR Project Manager (MS: 13-D-18)
  • RIV File *DRS
  • DRP
  • w/766

l

l

l

l

l l

l

l

1

h