ML20245A220
| ML20245A220 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 06/15/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20245A221 | List: |
| References | |
| NUDOCS 8906210156 | |
| Download: ML20245A220 (2) | |
See also: IR 05000267/1989010
Text
_,
,
9
.-
.
. P.
.
h l5 BB0
'
.
.
In Reply Refer to:
Docket: -50-267/89-10
.
Public Service Company of Colorado.
ATTN: Robert 0. Williams,' Jr.
Senior Vice President, Nuclear Operations'
P.O.' Box 840
Denver, Colorado 80201-0840
Gentlemen:
,
,
,
s
4
ThisreferstotheinspectionconductedbyMessrs.'E.E.Farrellandl
P. W. Michaud of this office during the period May 1-31,1989, ~ of' activities .
.
authorized by NRC Operating License DPR-34 for: Fort St. Vrain' Nuclear
'
Generating Station, and to the discussion of our findings with Mr. C. ' Craw'fordi
'
,
and other members of your staff.at the conclusion of.the inspection.
-
Areas examined during the inspection included onsite followup of licen'see~ event
reports, -licensee action on previously' identified inspection findings,
operational safety verification, monthly surveillance observation, and monthly >
maintenance observation. Within these areas, the inspection ~ consisted of.
~
selective examination of procedures and representative records, _ interviews with
personnel, and observations by the inspector.
The inspection findings are
documented in the enclosed inspection report.
,
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously.
identified inspection findings.
The status of these' items is identified in
'
paragraph 4 of the enclosed report.
Should you have any' questions concerning.this inspection, we will be pleased to
discuss them with you.
Sincerely,
Odginsi signed By.
[ T hAkW
J. L. Milhoan, Director
.!
Division of Reactor Projects
1
Enclosure:
(see next page)
h/
RIV: SRI'd h
RI Yh
DRP/B 2 b
' C:DRP/B b
D:D
l
REFarrell/kc
PWMichaud
RPMullikin
TFWesterman
JkMilhoan
6/ 6/89
s //f/89
g //f/89
6/ry/89
- 6 //8/89
!
l
p m m m y e7
-
$
..
'
. _ _ _ _ _ _ _ _ _ _ .__ _ _ . _ _ _ _ _ . . _ _ _
__
j
.
.
,
.
Q
Public Service Company of Colorado
-2-
Enclosure:
Appendix - NRC Inspection Report
50-267/89-10
cc w/ enclosure:
Fort St. Vrain Nuclear Generating Station
ATTN:
C. Fuller, Manager
Nuclear Production Division
16805 WCR 19 1/2
Platteville, Colorado 80651
Fort St. Vrain Nuclear Generating Station
ATTN:
P. Tomlinson, Manager
Quality Assurance Division
16805 WCR 19 1/2
'
Platteville, Colorado 80651
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
ATTN:
Ralph Teague, P.E.
1580 Logan Street OL1
Denver, Colorado 80203
l
bec to DMB (IE01)
bcc distrib. by RIV:
- RR1
- R. D. Martin, RA
- Section Chief (DRP/B)
- Project Engineer, DRP/B
l
- RPB-DRSS
Lisa Shea, RM/ALF
- MIS System
- RSTS Operator
- K. Heitner, NRR Project Manager (MS:
13-D-18)
- RIV File
- DRS
- DRP
- w/766
l
l
l
l
l
l
l
l
1
h