ML20245A220

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/89-10 on 890501-31.No Violations or Deviations Noted
ML20245A220
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/15/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20245A221 List:
References
NUDOCS 8906210156
Download: ML20245A220 (2)


See also: IR 05000267/1989010

Text

_,

,

9

.-

.

. P.

.

h l5 BB0

'

.

.

In Reply Refer to:

Docket: -50-267/89-10

.

Public Service Company of Colorado.

ATTN: Robert 0. Williams,' Jr.

Senior Vice President, Nuclear Operations'

P.O.' Box 840

Denver, Colorado 80201-0840

Gentlemen:

,

,

,

s

4

ThisreferstotheinspectionconductedbyMessrs.'E.E.Farrellandl

P. W. Michaud of this office during the period May 1-31,1989, ~ of' activities .

.

authorized by NRC Operating License DPR-34 for: Fort St. Vrain' Nuclear

'

Generating Station, and to the discussion of our findings with Mr. C. ' Craw'fordi

'

,

and other members of your staff.at the conclusion of.the inspection.

-

Areas examined during the inspection included onsite followup of licen'see~ event

reports, -licensee action on previously' identified inspection findings,

operational safety verification, monthly surveillance observation, and monthly >

maintenance observation. Within these areas, the inspection ~ consisted of.

~

selective examination of procedures and representative records, _ interviews with

personnel, and observations by the inspector.

The inspection findings are

documented in the enclosed inspection report.

,

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously.

identified inspection findings.

The status of these' items is identified in

'

paragraph 4 of the enclosed report.

Should you have any' questions concerning.this inspection, we will be pleased to

discuss them with you.

Sincerely,

Odginsi signed By.

[ T hAkW

J. L. Milhoan, Director

.!

Division of Reactor Projects

1

Enclosure:

(see next page)

h/

RIV: SRI'd h

RI Yh

DRP/B 2 b

' C:DRP/B b

D:D

l

REFarrell/kc

PWMichaud

RPMullikin

TFWesterman

JkMilhoan

6/ 6/89

s //f/89

g //f/89

6/ry/89

- 6 //8/89

!

l

p m m m y e7

-

$

..

'

. _ _ _ _ _ _ _ _ _ _ .__ _ _ . _ _ _ _ _ . . _ _ _

__

j

.

.

,

.

Q

Public Service Company of Colorado

-2-

Enclosure:

Appendix - NRC Inspection Report

50-267/89-10

cc w/ enclosure:

Fort St. Vrain Nuclear Generating Station

ATTN:

C. Fuller, Manager

Nuclear Production Division

16805 WCR 19 1/2

Platteville, Colorado 80651

Fort St. Vrain Nuclear Generating Station

ATTN:

P. Tomlinson, Manager

Quality Assurance Division

16805 WCR 19 1/2

'

Platteville, Colorado 80651

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

ATTN:

Ralph Teague, P.E.

1580 Logan Street OL1

Denver, Colorado 80203

l

bec to DMB (IE01)

bcc distrib. by RIV:

  • RR1
  • R. D. Martin, RA
  • Section Chief (DRP/B)
  • Project Engineer, DRP/B

l

  • RPB-DRSS

Lisa Shea, RM/ALF

  • MIS System
  • RSTS Operator
  • K. Heitner, NRR Project Manager (MS:

13-D-18)

  • RIV File
  • DRS
  • DRP
  • w/766

l

l

l

l

l

l

l

l

1

h