ML20245H389
| ML20245H389 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 08/08/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20245H391 | List: |
| References | |
| NUDOCS 8908170067 | |
| Download: ML20245H389 (2) | |
See also: IR 05000267/1989012
Text
__
_ _ _ - _ _ _ _ - -
.
.
-
,
.
,
AUG
8 t999
In Reply Refer To:
Docket:
50-267/89-12
,
Public Service Company of Colorado
ATTN:
Robert O. Williams, Jr.
Senior Vice President, Nuclear Operations
P.O. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Farrell and
P. W. Michaud of this of fice during the period June 1 through July 15, 1989, of
activities authorized by NRC Operating License DPR-34 for the Fort St. Vrain
i
. Nuclear Generating Station, and to the discussion of our findings with
Mr. A. C. Crawford and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included onsite followup of licensee event
reports, operational safety verification, monthly surveillance observation, and
monthly maintenance observation.
Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part.2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
'
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the-Office of Management and Budget as required
i
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
OriginalSigned By:
Thomas P.Gwynn
James L. Milhoan, Director
.
Division of Reactor Projects
i
Enclosures:
(see next page)
RIV: SRI
RI
DRP/B
C:DRP/B
REFarrelI c
PWMichaud
RPMullikn
TFWestermIn
)r0Lilhoan
f/J-/89
7 / 2-/89
f/2/89
T/2/89
8/g/89
8908170067 890808
i\\
ADOCK 05000267
O
PNU
i
fE
l
i
I
-
L
'
-
,
,
Public Service Company of Colorado
-2-
.
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/89-12
cc w/ enclosures:
Fort St. Vrain Nuclear Generating Station
ATTN:
C. Fuller, Manager
Nuclear Production Division
16805 WCR 19 1/2
Platteville, Colorado 80651
Fort St. Vrain Nuclear Generating Station
ATTN:
P. Tomlinson, Manager.
Quality Assurance Division
16805 WCR 19 1/2
Platteville, Colorado 80651
Colorado Public Utilities Commission
ATTN:
Ralph Teague, P.E.
1580 Logan Street OL1
Denver, Colorado 80203
Colorado Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RR1
- R. D. Martin, RA
l
- Section Chief (DRP/B)
- Project Engineer (DRP/B)
- RPB-DRSS
Lisa Shea, RM/ALF
'
- MIS System
- RSTS Operator
- K. Heitner, NRR Project Manager (MS:
13-D-18)
- RIV File
- DRS
- DRP
- w/766
l
i
i
)
i
_]