MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20128G1421996-09-25025 September 1996 Advises NRC Approved Decommissioning Plan, Impact Of... Fsv Final Decommissioning, Satisfies All Elements of License Termination Plan as Required by Rev to Reactor Decommissioning Rule 10CFR50.82(a)(9) ML20136B2561996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Falsification of Radiation Survey Records.Revised NOV Encl ML20136B2731996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Util Failure to Assure Compliance w/10CFR50.9 Concerning Accuracy of Radiation Survey Records. Revised NOV Encl ML20136B3241996-04-0202 April 1996 Informs That NRC Will Be Withdrawing NOV ,based on Reevaluation of Evidence Provided & Response to NOV ML20058G9671993-12-0707 December 1993 Ack Receipt of Ltrs of 931110,responding to Notice of Violation & Proposed Imposition of Civil Penalty Issued on 931013 IR 05000267/19930021993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Rept 50-267/93-02. Deficiency Determined to Have Contributed to 930527 Crane Overload Event IR 05000267/19930011993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/93-01 ML20056G0041993-06-25025 June 1993 Submits Info Re Implementation of Training Rule 10CFR50.120 for Licensees of Plant in Decommissioning Process ML20128D6931992-12-0101 December 1992 Forwards Exemption from Requirement in 10CFR50,app E,Section IV.F.2 to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise. EA & SE Also Encl ML20198C7511991-06-25025 June 1991 Suggests That Region Iv/Senior Util Executive Conference Be Held During Month of Sept 1991 in Arlington,Tx to Provide Open Forum for Candid Discussions Limited to Topics of General Interest & Not Pertain to Plant Specific Issues ML20058K0231990-11-30030 November 1990 Forwards Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted ML20062H8131990-11-29029 November 1990 Forwards Partially Withheld Insp Rept 50-267/90-18 on 901022-26 & Notice of Violation ML20062H2041990-11-21021 November 1990 Forwards Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted ML20058J0121990-11-16016 November 1990 Forwards Insp Rept 50-267/90-20 on 901029-1102.Violations Noted But Not Cited IR 05000267/19900161990-10-30030 October 1990 Discusses Insp Rept 50-267/90-16 on 900928 & 901018 Enforcement Conference & Forwards Notice of Violation ML20062B3971990-10-15015 October 1990 Forwards Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted ML20058A0941990-10-12012 October 1990 Confirms 901018 Enforcement Conference in Region IV Ofc Re Violations & Radiation Program Weakness Noted in Insp Rept 50-267/90-16.Proposed Agenda Encl ML20059N8231990-10-0303 October 1990 Forwards FEMA Final Radiological Emergency Preparedness Exercise Rept, for 891115 Exercise.One Deficiency & Several Areas Requiring Corrective Actions Identified ML20059C1381990-08-24024 August 1990 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 900605 Application,For Info ML20056B4021990-08-20020 August 1990 Forwards Insp Rept 50-267/90-11 on 900601-0728.No Violations or Deviations Noted ML20058M8681990-08-0808 August 1990 Forwards Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Identified.Licensee Commitment to Revise Manual Dose Assessment Procedure to Incorporate Appropriate Unit Conversion Factor,Noted ML20055J3951990-07-31031 July 1990 Ack Receipt of 900713 Request for Exemption from FY90 Annual Fee Requirements of 10CFR171.Annual Fee Will Not Be Billed ML20056A3601990-07-31031 July 1990 Forwards Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Actions Taken Re Previously Identified Insp Findings & Status Examined ML20059D1281990-07-30030 July 1990 Ack Receipt of 900713 Request for Full Exemption from FY90 Annual Fee Requirements of 10CFR171 for Plant.Annual Fee Will Not Be Billed While Request Under Review ML20055G5921990-07-19019 July 1990 Agrees W/Removal of B Helium Circulator,Per Requesting NRC Concurrence.Solution to Correct Leakage Problem by Removal of Circulator Acceptable ML20055D2031990-06-26026 June 1990 Ack Receipt of 900525 Response to 900402 Emergency Preparedness Insp Rept & 900427 Notice of Violation ML20055C8021990-06-18018 June 1990 Concludes That Financial Info Forwarded by Meets Requirements of 10CFR140.21 ML20248H7751989-10-0303 October 1989 Forwards Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted IR 05000267/19890171989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-17. Implementation of Corrective Actions Will Be Examined During Future Insps IR 05000267/19890081989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-08. Understands That Revised Flow Test Surveillance Procedures Performed on 890821 & 0921 & cross-connect Valves Stroked ML20248B2971989-09-26026 September 1989 Forwards Insp Rept 50-267/89-16 on 890716-0831 & Notice of Violation IR 05000267/19890121989-09-22022 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-267/89-12 ML20247K9051989-09-19019 September 1989 Advises That 890726 Request for Approval of Route to Transport Spent Reactor Fuel Approved.Route,From Facility to DOE Inel in Idaho,Encl ML20247L1381989-09-19019 September 1989 Advises That Request to Delete Requirement to Provide Status Repts on Performance Enhancement Program Approved.Updated List of Commitments Encl 1998-07-20
[Table view] |
Text
.
.- par p* - t UNITED STATE 3 g j 4"
HUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666-0001 o
, , , o ,o September 25, 1996 Mr. A. Clegg Crawford Vice President. Electric Operations Public Service Company of Colorado P.O. Box 840 Denver, Colorado 80201-0840
SUBJECT:
IMPACT OF THE FINAL DECOMMISSIONING RULE ON FORT ST. VRAIN DECOMMISSIONING
Dear Mr. Crawford:
The U.S. Nuclear Regulatory Commission has reviewed the Public Service Company of Colorado's (PSC) August 22, 1996, submittal (P-96073) entitled, " Impact of the Final Decommissioning Rule on Fort St. Vrain Final Decommissioning."
Based on its review, the NRC staff has concluded that the Decommissioning Plan (DP), as amended, which has been approved by the staff, satisfies all of the elements of a license termination plan as required by the recently issued revisions to the Reactor Decommissioning Rule,10 CFR 50.82(a)(9), and the related modifications to the requirements for an updated Final Safety Analysis Report ' 9 R) or Updated Safety Analysis Report (USAR). 10 CFR 50.71(e)(4).
The ba for our determination is discussed below in detail.
On November 23, 1992, the NRC approved the Decommissioning Plan, su)plement to the Environmental Report, and revised Technical Specifications for : ort Saint 4 Vrain (FSV). NRC has concluded that the submittal and approval of these documents meet the requirements rf 10 CFR 50.82(a)(9)(i), requiring submittal of a termination plan at least two years before license termination. In addition, NRC has also concluded that the FSV-approved DP meets the information requirements as defined in 10 CFR 50.82(a)(9)(ii)(A), " Site Characterization": 10 CFR 50.82(a)(9)(ii)(B), " Identification of Remaining Dismantlement Activities": 10 CFR 50.82(a)(9)(ii)(C), " Plans for Site Remediation": 10 CFR 50.82(a)(9)(1)(E), " Description of the End Use of the Site, if Restricted": and 10 CFR 50.82(a)(9)(ii)(F), "An Updated Site-Specific Analysis of the Remaining Decommissioning Costs.
The requirements of 10 CFR 50.82(a)(9)(ii)(G), "A Su)plement to the Environmental Report " were met by the licensee's su)mittal to and NRC's approval of the supplement to the Environmental Report. The requirements of 10 CFR 50.82(a)(9)(ii)(D), " Detailed Plans for the Final Radiation Survey "
were met by the FSV submittal to and NRC approval of the FSV Final Survey Plan in January 26, 1995.
s to the requirement in section 50.71(e)(4) for a nuclear power plant, mcluding a plant .n decommissioning, to maintain an updated FSAR. )ursuant to the November 23, 1992, Order A) proving Decommissioning Plan and Aut1orizing Decommissioning of Facility, t1e DP replaced the licensee's USAR. Although the licensee has not, therefore, been updating its USAR, pursuant to the 1992 Decommissioning Order, it has been submitting quarterly reports of any changes to the DP, including a written safety evaluation. Pursuant to a further commitment, the licensee has also been providing an annual update of the DP.
sea *88 8 !!838 6 W PDR NRC HLE CENTER COPY WI"
. . , . 2 o
.e .
The NRC staff considers the DP to be the functional equivalent of a USAR, '
pa'rticularly considering the stage of activities at FSV, and the quarterly reporting requirement and annual update commitment to satisfy the updating requirement of 10 CFR 50.71(e)(4).
As to the process for _ staff approval of termination of the FSV license, the procedures in the revised Reactor Decommissioning rule are controlling. Thus, the licensee's termination request, which is anticipated to be filed shortly, will be processed as a request for license amendment (10 CFR 50.82(a)(10)).
Pursuant to 10 CFR 50.82(a)(9) and 2.1205(c), the NRC will notice receipt of the termination request and the termination plan and make them available for public comment. The staff will provide an opportunity for a hearing under Subpart L of 10 CFR Part 2 (10 CFR 2.1205(c)). If a request for a hearing is filed and granted. that proceeding must be completed )rior to license termination (10 CFR 2.1201(a)(3)). The staff will pu)lish notice of, and hold in the vicinity of the plant, a public meeting regarding the termination plan (10 CFR 50.82(a)(9)).
f As soon as your termination request is received, the staff will commence the process described above. Preliminary discussions have already been held with the Platteville Town Administrator regarding holding two public meetings, one in late 1996 and a second in the Spring of 1997.
As soon as your termination request is received, the staff will commence the process described above. Preliminary discussions have already been held with i the Platteville Town Administrator regarding holding two public meetings. one l in late 1996 and a second in the Spring of 1997.
If you have any questions, I can be contacted at (301) 415-6702. !
Sincerely.
[0RIGINAL SIGNED BY R. NELSON FOR:]
Michael F. Weber. Chief Low-Level Waste and Decommissioning Projects Branch Division of Waste Management Office of Nuclear Material Safety Docket No.00-267 License No. DPR-34 cc: See attached list DISTRIBUTION: Central File NMSS r/f LLDP r/f RIV Spitzberg TCJohnson RNelson
- & See y $ Path &Fileprevious concurrence Name s
- \DWM\LLDP\CLP\FSVLTR19 0FC : LLDP* OGC* LLDP* LLDP g g NAME: CPittiglio Slewis LBell MWebW ;
DATE:
9 /16/96 9/17/96 9/19/96 <//g/96 0FFICIAL RECORD COPY PDR : YES X NO Category: Proprietary or CF Only ACNW: YES NO IG: YES NO 1 Delete file after distribution Yes No [ l
. 1 1
' l 2
l i
The NRC staff considers the DP to be the functional equivalent of a USAR. l
- particularly considering the stage of activities at FSV. and the quarterly I
- reporting requirement and annual update commitment to satisfy the updating :
- requirement of 10 CFR 50.71(e)(4). I 4 As to the process for staff approval of termination of the FSV license, the 4
procedures in the revised Reactor Decommissioning rule are controlling. Thus.
, the licensee's termination request, which is anticipated to be filed shortly. I
! will be processed as a request for license amendment (10 CFR 50.82(a)(10)).
4 Pursuant to 10 CFR 50.82(a)(9)(iii) and 2.1205(c) the NRC will notice receipt 1
of the termination request and the termination plan and make them available for public comment. The staff will provide an opportunity for a hearing under
- Subpart L of 10 CFR Part 2 (10 CFR 2.1205(c)). If a request for a hearing is
- filed anj granted, that proceeding must be completed ]rior to license termination (10 CFR 2.1201(a)(3)). The staff will pu]lish notice of, and hold in the vicinity of the plant, a public meeting regarding the termination plan
- (10 CFR 50.82(a)(9)(iii)).
- As soon as your termination request is received, the staff will commence the i i process described above. Preliminary discussions have already been held with i
! the Platteville Town Administrator regarding holding two public meetings, one
} in late 1996 and a second in the Spring of 1997.
- If you have any questions. I can be contacted at (301) 415-6702. l j Sincerely.
Michael F. Weber. Chief Low-Level Waste and Decommissioning Projects Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards Docket No. 50-267 License No. DPR-34 cc: See attached list
e 3
E' i
l Fort St. Vrain Letter dated: gg/rff,
~
Docket No. 50-267 License No. DPR-34 cc:
4 Mr. Wayne H. Burnett
- President, and i-Chief Executive Officer
- Public Service Company of Colorado l P.O. Box 840 Denver, CO 80201-0840 l Regional Administrator, Region IV i U.S. Nuclear Regulatory Commission i 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, CO 80631 Regional Representative Radiation Programs 4
Environmental Protection Agency 1 - Denver Place 999 18th Street, Suite 1300
- Denver, CO 80202-2413 Radiation Control Division (RCD-D0-B1) i Colorado Department of Health
, 4300 Cherry Creek Drive South
! Denver, CO 80222-1530 Commitment Control Program Coordinator Public Service Company of Colorado 16805 Weld County Road 19-1/2 Platteville, CO 80651 Mr. M. H. Holmes Nuclear Licensing Manager Public Service Company of Colorado 16805 Weld County Road 19-1/2
- Platteville, CO 80651 i
'1
f -
l ,
2 the November 23, 1992, Order Approving Decommissioning Plan and Authorizing Decommissioning of Facility, the DP replaced the licensee's USAR. Although the icensee I has not, therefore, been updating its USAR, pursuant to the 1992 Decommission g Order it has been submitting quarterly reports of any changes to the DP, including a ritten safety evaluation. Pursuant to a further commitment, the licensee has also been roviding an annual update of the DP. The NRC staff considers the DP to be the functjonal equivalent
~of-a-USAR, particularly considering the stage of activities at FSV, and'the quarterly (rperting2 requirement and annual update commitment to satisfy the upd t'ing requirement of /'
10 CFR 50.71(e)(4).
As to the process for staff approval of termination of the FSV li ense, the procedures in the revised Reactor Decommissioning rule are controlling. Thus the licensee's termination request, which is anticipated to be filed shortly will be processed as a request for license amendment (10 CFR 50.82(a)(10)). Pursua 'to 10 CFR 50.82(a)(9) and 2.1205(c), the NRC wiP notice receipt of the termination r quest and the termination plan and make them availaW for public comment. The staff wi provide an opportunity for a hearing under Subpart L of 10 CFR Part 2 (10 CFR 2.1205 )). If a request for a hearing is filed and granted, that proceeding must be complete prior to license termination (10 CFR 2.1201(a)(3)). The staff will publish notice of, and hold in the vicinity of the plant, a public meeting regarding the termination p n (10 CFR 50.82(a)(9)).
As soon as your termination request is received, t e staff will commence the process described above. Preliminary discussions have al eady been held with the Platteville Town Administrator regarding holding two public meet'tgs, one in late 1996 and a second in the Spring of 1997.
As soon as your termination request is recei d, the staff will commence the process described above. Preliminary discussions h e already been held with the Platteville Town Administrator regarding holding two publi meetings, one in late 1996 and a second in the Spring of 1997.
If you have any questions, I can be co acted at (301) 415-6702.
Sincerel ,
Clayto L. Pittiglio, Project Manager ow-Level Waste and De ommissioning Projects Branch Division of Waste Management 0 ice of Nuclear Material Safety and Safeguards Docket No. 50-267 License No. DPR-34 cc: See attached list - %
DISTRIBUTIO!b. Central ile NMSS r/f JGreeves Dir r/f y CPoland ' -
LtWM~r/f ~ RIV Spitzberg LL b' / F.
iMirkissa111 Boxes inLConcurr'ence? Block 1to" Define"w'EibitibnTCopy!PFsfdrende
^ ^
Dist In sma11'Bux oh~"0FCi '1ine p1hce"a ' C "= " Cover' ' E '= 'Co9eV L' Encloidte ' ~N = No"C6py \
o See previous conct)-eenece-ndk A': W, 0FC : LLDP* 0G'C* LLDP LLDP
/ ,
NAME:
CPittifio SLewis ,LBell([
MWeber DATE: ,9/j/96 / 9/l 7/96 9/ ff 96 7/ /96 Path &FieNames:\DWM\LLDP\CLP\FSVLTR19 0FFICIAL RECORD COPY j In smal Box on "DATE:" line place a: M = E-Mail Distribution Copy H = Hard Copy i PDR : YES NO Category: Proprietary or CF Only i ACNW: YES NO Delete file after distribution Yes No
/ IG: YES NO l
l
2 23, 1992, Order Approving Decommissioning Plan and Authorizing Decommissioni of Facility, the DP replaced the licensee's FSAR. Although the licensee h not, therefore, been updating its USAR, pursuant to the 1992 Decommissio ng Order it has been submitting quarterly reports of any changes to the D7, including a written safety evaluation. Pursuant to a further commitp6nt, the licensee has also been providing an annual update of the DP. The C staff considers the DP to be the functional equivalent of a USAR, parti ularly considering the stage of activities at FSV, and the quarterly r rting requirement and annual update commitment to satisfy the updat g requirement of 10 CFR 50.71(e)(4).
As to the process for staff approval of termination of the SV license, the procedures in the revised Reactor Decommissioning rule ar controlling. Thus, the licensee's termination request, which is anticipatep to be filed shortly, will be processed as a request for license amendment V CFR 50.82(a)(10)).
Pursuant to 10 CFR 50.82(a)(9) and 2.1205(c), the NR will notice receipt of the termination request and the termination plan an make them available for public comment. The staff will provide an opport ity for a hearing under Subpart L of 10 CFR Part 2 (10 CFR 2.1205(c)). Jf a request for a hearing is filed and granted, that proceeding must be com Teted prior to icense termination (10 CFR 2.1201(a)(3)). The staff ill publish notice of, and hold in the vicinity of the plant, a public meet' g regarding the termination plan (10 CFR 50.82(a)(9).
As soon as your termination request is re eived, the staff will commence the process described above. Preliminary d} cussions have already been held with the Platteville Town Administrator rega'rding holding two public meetings, one in late 1996 and a second in the Spri g of 1997.
As soon as your termination request s received, the staff will commence the /
process described above. Prelimin ry discussions have already been held with j the Platteville Town Administrat regarding holding two public meetings, one in late 1996 and a second in th Spring of 1997.
If you have any questions, I c n be contacted at (301) 415-6702.
Sincerely, Clayton L. Pittiglio, Project Manager Low-Level Waste and Decommissioning Projects Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards Docket No. 50-267 License No. DPR-34 cc: See attach list DISTRIBUTION: Cent al File NMSS r/f JGreeves Dir r/f CPoland LLWM r RIV Spitzb
[MarklSrliallToks/fsiinicondirre,nce.ergBl oc k7 teT Dsfiiie : Di s tFi tsu t'i dEC6py1:PFi in small" Box 'od/0FC:" lise place k ' 'C' = CbyeV'E"= Cover & Enclosure ~'N"= No" Copy
" ^'
0FC : OGC8h@Y,b LLDP LLDP LLDPM NAME: gP[i lio SLewis l W LBell MWeber DATE:[9h/96 9//'//96 9/ /96 7/ /96 i Patb& Filenames:\DWM\LLDP\CLP\FSVLTR19 0FFICIAL RECORD COPY IdsmallBoxon"DATE:"lineplacea: M = E-Mail Distribution Copy H = Hard Copy PDR : YES NO Category: Proprietary or CF Only
/ ACNW: YES NO Delete file after distribution Yes No IG: YES N0 l