ML23229A517: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:October 4, 2023 Denise Elisio Licensing Engineer Holtec International Holtec Technology Campus 1 Holtec Blvd.
{{#Wiki_filter:October 4, 2023
 
Denise Elisio Licensing Engineer Holtec International Holtec Technology Campus 1 Holtec Blvd.
Camden, NJ 08104
Camden, NJ 08104


Line 27: Line 29:


==Dear Denise:==
==Dear Denise:==
By a {{letter dated|date=February 17, 2022|text=letter dated February 17, 2022}} (Agencywide Document Access and Management System (ADAMS) Accession No. ML22048C221), Holtec International (Holtec) submitted to the U.S.
By a {{letter dated|date=February 17, 2022|text=letter dated February 17, 2022}} (Agencywide Document Access and Management System (ADAMS) Accession No. ML22048C221), Holtec International (Holtec) submitted to the U.S.
Nuclear Regulatory Commission (NRC) a request to separate the portion implementing Graded Approach from the Amendment No. 7 application for the Certificate of Compliance (CoC)
Nuclear Regulatory Commission (NRC) a request to separate the portion implementing Graded Approach from the Amendment No. 7 application for the Certificate of Compliance (CoC)
No. 1032 for HI-STORM Flood/Wind Multi-purpose Canister Storage System. The graded approach portion is now Amendment No. 9. On March 13, 2023, Holtec provided supplemental information to this application (ML23072A426).
No. 1032 for HI-STORM Flood/Wind Multi-purpose Canister Storage System. The graded approach portion is now Amendment No. 9. On March 13, 2023, Holtec provided supplemental information to this application (ML23072A426).
The graded approach was developed to improve the spent fuel dry storage licensing process by applying risk insights to clarify the information required in the CoC and removing or relocating details that are not risk significant to safety, thereby providing additional flexibility for licensees.
The graded approach was developed to improve the spent fuel dry storage licensing process by applying risk insights to clarify the information required in the CoC and removing or relocating details that are not risk significant to safety, thereby providing additional flexibility for licensees.
The NRC endorsed the graded approach on January 8, 2020 (ML19353D337). Applicants requesting an amendment using the graded approach must demonstrate that there are no technical changes being requested as part of the transition to the new CoC format and content.
The NRC endorsed the graded approach on January 8, 2020 (ML19353D337). Applicants requesting an amendment using the graded approach must demonstrate that there are no technical changes being requested as part of the transition to the new CoC format and content.
The staff used the graded approach criteria in the endorsement letter for this review. After reviewing the Amendment No. 9 application and supplemental information, the staff determined additional information is needed to complete this review. We request that you provide the responses to the attached request for additional information (RAI) within 30 days from the date of this letter. If you are unable to meet this deadline, please notify us in writing, within 2 weeks of receipt of this letter, of your new submittal date and the reasons for the delay.
The staff used the graded approach criteria in the endorsement letter for this review. After reviewing the Amendment No. 9 application and supplemental information, the staff determined additional information is needed to complete this review. We request that you provide the responses to the attached request for additional information (RAI) within 30 days from the date of this letter. If you are unable to meet this deadline, please notify us in writing, within 2 weeks of receipt of this letter, of your new submittal date and the reasons for the delay.
D.Elisio 2


D. Elisio                                      2 Please reference Docket No. 72-1032, CAC No. 001028, and EPID No. L-2022-LLA-0027 in future correspondence related to this licensing action. If you have any questions, please contact me at 301-415-1018.
Please reference Docket No. 72-1032, CAC No. 001028, and EPID No. L-2022-LLA-0027 in future correspondence related to this licensing action. If you have any questions, please contact me at 301-415-1018.
Sincerely, Garcia Santos, Norma signing on behalf of Chen, Yen-Ju on 10/04/23 Yen-Ju Chen, Sr. Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1032 CAC No.: 001028 EPID: L-2022-LLA-0027


==Enclosure:==
Sincerely, Garcia Santos, Norma signing on behalf of Chen, Yen-Ju on 10/04/23
 
Yen-Ju Chen, Sr. Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards


Request for Additional Information
Docket No.: 72-1032 CAC No.: 001028 EPID: L-2022-LLA-0027


D. Elisio                                   3 AMENDMENT NO. 9 TO CERTIFICATE OF COMPLIANCE NO. 1032 FOR THE HI-STORM FLOODWIND MULTl-PURPOSE CANISTER STORAGE SYSTEM - REQUEST FOR ADDITIONAL INFORMATION DATE October 4, 2023 DISTRIBUTION: DOCKET NO. 72-1032, CAC NO. 001028 ADAMS Accession No.: ML23229A515; Ltr ML23229A517 OFFICE           NMSS/DFM/STLB     NMSS/DFM/NARAB NMSS/DFM/CTCFB NMSS/DFM/STLB YChen NAME                                EGoldfeiz     EG FChang         FC WWheatley     WI/I.I NGarcia for   NG DATE             Sep 28, 2023     Sep 28, 2023     Sep 28, 2023     Sep 29, 2023 OFFICE           NMSS/DFM/NARAB NMSS/DFM/MSB       NMSS/DFM/IO8     NMSS/DFM/CTCFB NAME             DForsyth     OF LHowe         Lh ARivera-Varona AA DMarcano       DM DATE             Sep 28, 2023     Sep 28, 2023     Oct 3, 2023       Sep 29, 2023 OFFICE           NMSS/DFM/IO8     NMSS/DFM/NARAB NMSS/DFM/MSB       NMSS/DFM/STLB YDiaz-Sanabria NAME             JTapp         J1 DJohnson     DJ TBoyce         TB Tliu for         TL DATE             Oct 2, 2023       Sep 29, 2023     Sep 29, 2023     Oct 4, 2023 OFFICE           NMSS/DFM/STLB YChen NAME NGarcia for   NG DATE             Oct 4, 2023 OFRCLRECORDCOPY}}
==Enclosure:==
Request for Additional Information D.Elisio 3 AMENDMENT NO. 9 TO CER TIFICATE OF COMPLIANCE NO. 1032 FOR THE HI-STORM FLOODWIND MUL Tl-PURPOSE CANI STER STORAG E SYST EM - REQUEST FOR ADDITIONAL INFORMATION DATE October 4, 2023 DISTRIBUT ION: DOC KET NO. 72-1032, CAC NO. 001028 ADAMS Accession No.: ML23229A515; Ltr ML23229A517 OFFICE NMSS/DFM/STLB NMSS/DFM/NARAB NMSS/DFM/CTCFB NMSS/DFM/STLB NAME YChen EGoldfeiz EG FChang FC WWheatley WI/I.I NGarcia for NG DATE Sep 28, 2023 Sep 28, 2023 Sep 28, 2023 Sep 29, 2023 OFFICE NMSS/DFM/NARAB NMSS/DFM/MSB NMSS/DFM/IO8 NMSS/DFM/CTCFB NAME DForsyth OF LHowe Lh ARivera-Varona AA DMarcano DM DATE Sep 28, 2023 Sep 28, 2023 Oct 3, 2023 Sep 29, 2023 OFFICE NMSS/DFM/IO8 NMSS/DFM/NARAB NMSS/DFM/MSB NMSS/DFM/STLB NAME JTapp J1 DJohnson DJ TBoyce TB YDiaz-Sanabria Tliu for TL DATE Oct 2, 2023 Sep 29, 2023 Sep 29, 2023 Oct 4, 2023 OFFICE NMSS/DFM/STLB NAME YChen NGarcia for NG DATE Oct 4, 2023 OFRCLRECORDCOPY}}

Latest revision as of 13:52, 13 November 2024

Amendment No. 9 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Request for Additional Information
ML23229A517
Person / Time
Site: 07201032
Issue date: 10/04/2023
From: Yen-Ju Chen
Storage and Transportation Licensing Branch
To: Elisio D
Holtec
Shared Package
ML23229A515 List:
References
EPID L-2022-LLA-0027, CAC 001028
Download: ML23229A517 (1)


Text

October 4, 2023

Denise Elisio Licensing Engineer Holtec International Holtec Technology Campus 1 Holtec Blvd.

Camden, NJ 08104

SUBJECT:

AMENDMENT NO. 9 TO CERTIFICATE OF COMPLIANCE NO. 1032 FOR THE HI-STORM FLOOD/WIND MULTI-PURPOSE CANISTER STORAGE SYSTEM -

REQUEST FOR ADDITIONAL INFORMATION (DOCKET NO. 72-1032, CAC NO. 001028, EPID: L-2022-LLA-0027)

Dear Denise:

By a letter dated February 17, 2022 (Agencywide Document Access and Management System (ADAMS) Accession No. ML22048C221), Holtec International (Holtec) submitted to the U.S.

Nuclear Regulatory Commission (NRC) a request to separate the portion implementing Graded Approach from the Amendment No. 7 application for the Certificate of Compliance (CoC)

No. 1032 for HI-STORM Flood/Wind Multi-purpose Canister Storage System. The graded approach portion is now Amendment No. 9. On March 13, 2023, Holtec provided supplemental information to this application (ML23072A426).

The graded approach was developed to improve the spent fuel dry storage licensing process by applying risk insights to clarify the information required in the CoC and removing or relocating details that are not risk significant to safety, thereby providing additional flexibility for licensees.

The NRC endorsed the graded approach on January 8, 2020 (ML19353D337). Applicants requesting an amendment using the graded approach must demonstrate that there are no technical changes being requested as part of the transition to the new CoC format and content.

The staff used the graded approach criteria in the endorsement letter for this review. After reviewing the Amendment No. 9 application and supplemental information, the staff determined additional information is needed to complete this review. We request that you provide the responses to the attached request for additional information (RAI) within 30 days from the date of this letter. If you are unable to meet this deadline, please notify us in writing, within 2 weeks of receipt of this letter, of your new submittal date and the reasons for the delay.

D.Elisio 2

Please reference Docket No. 72-1032, CAC No. 001028, and EPID No. L-2022-LLA-0027 in future correspondence related to this licensing action. If you have any questions, please contact me at 301-415-1018.

Sincerely, Garcia Santos, Norma signing on behalf of Chen, Yen-Ju on 10/04/23

Yen-Ju Chen, Sr. Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards

Docket No.: 72-1032 CAC No.: 001028 EPID: L-2022-LLA-0027

Enclosure:

Request for Additional Information D.Elisio 3 AMENDMENT NO. 9 TO CER TIFICATE OF COMPLIANCE NO. 1032 FOR THE HI-STORM FLOODWIND MUL Tl-PURPOSE CANI STER STORAG E SYST EM - REQUEST FOR ADDITIONAL INFORMATION DATE October 4, 2023 DISTRIBUT ION: DOC KET NO. 72-1032, CAC NO. 001028 ADAMS Accession No.: ML23229A515; Ltr ML23229A517 OFFICE NMSS/DFM/STLB NMSS/DFM/NARAB NMSS/DFM/CTCFB NMSS/DFM/STLB NAME YChen EGoldfeiz EG FChang FC WWheatley WI/I.I NGarcia for NG DATE Sep 28, 2023 Sep 28, 2023 Sep 28, 2023 Sep 29, 2023 OFFICE NMSS/DFM/NARAB NMSS/DFM/MSB NMSS/DFM/IO8 NMSS/DFM/CTCFB NAME DForsyth OF LHowe Lh ARivera-Varona AA DMarcano DM DATE Sep 28, 2023 Sep 28, 2023 Oct 3, 2023 Sep 29, 2023 OFFICE NMSS/DFM/IO8 NMSS/DFM/NARAB NMSS/DFM/MSB NMSS/DFM/STLB NAME JTapp J1 DJohnson DJ TBoyce TB YDiaz-Sanabria Tliu for TL DATE Oct 2, 2023 Sep 29, 2023 Sep 29, 2023 Oct 4, 2023 OFFICE NMSS/DFM/STLB NAME YChen NGarcia for NG DATE Oct 4, 2023 OFRCLRECORDCOPY