Letter Sequence RAI |
---|
CAC:001028, (Approved, Closed) EPID:L-2021-LLA-0039, International, Submittal of HI-STORM 100 Multipurpose Canister Storage System Amendment 16 Request (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19276D398, ML20014E677, ML20049A082, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML20071F156, ML20076D696, ML20094G482, ML20099A180, ML20104C015, ML20104C016, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20115E377, ML20121A272, ML20136A049, ML20136A050, ML20136A051, ML20150A300, ML20150A335, ML20150A421, ML20155K741, ML20155K742, ML20155K743, ML20155K744, ML20160A040, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20212L878, ML20223A036, ML20224A287... further results
|
MONTHYEARML19276D3982019-10-0303 October 2019 Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML20014E6772020-01-0909 January 2020 Fws List of Threatened and Endangered Species That May Occur with Respect to the McGuire Exemption Request Project stage: Other ML20015A3142020-01-14014 January 2020 Package: Exemption Request McGuire Nuclear Facility Project stage: Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20049A0822020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20055F3372020-02-20020 February 2020 Conversation Record - Clarification Call (02/20/2020) on RAI 1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20065K2162020-03-0505 March 2020 Notice of Meeting with U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20065J4272020-03-0505 March 2020 Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021 Project stage: Request ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of Nrc'S Environmental Review Project stage: Supplement ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support Nrc'S Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information Project stage: Response to RAI ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20105A1732020-04-0606 April 2020 Interim Storage Partners, LLC - Affidavits Project stage: Other ML20105A1392020-04-0707 April 2020 Enclosure 8 - Referenced Documents Project stage: Other ML20105A1342020-04-0707 April 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4 Project stage: Request ML20105A1722020-04-0707 April 2020 Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3 Project stage: Supplement ML20105A1382020-04-0707 April 2020 Enclosure 7 - SAR Changed Pages Project stage: Other ML20105A1372020-04-0707 April 2020 Enclosure 5 - La Changed Pages Project stage: Other ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20100F2952020-04-0909 April 2020 Tn Americas LLC - Submittal of Renewal Application for the TN-68 Dry Storage Cask - CoC 1027 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20111A2382020-04-13013 April 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20111A2392020-04-13013 April 2020 Attachment 1: HI-STORM Umax Amendment 4 RAI Supplemental Response (non-proprietary) Project stage: Supplement ML20111A2402020-04-13013 April 2020 Attachment 2: Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages (non-proprietary) Project stage: Other ML20094G4822020-04-15015 April 2020 GEH-Morris QAP Rev 4 Approval Project stage: Other ML20092L1732020-04-17017 April 2020 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 0 Project stage: Approval ML20120A2282020-04-29029 April 2020 Tn Americas LLC, Response to the Request for Additional Information to Application for Certificate of Compliance No. 1042, Amendment No. 2, to NUHOMS Eos System, (Docket No. 72-1042, CAC No. 001028 EPID: L-2019-LLA-0078)- Request for Extens Project stage: Request 2020-03-05
[Table View] |
|
---|
Category:Letter
MONTHYEARAEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask ML24274A3032024-10-0909 October 2024 Amendment 19 to Certificate of Compliance 1014 for Hi-Storm 100 Multi-Purpose Canister Storage System Request for Additional Information ML24240A1182024-10-0808 October 2024 0 Issuance Letter Amendment 18 to Renewed Certificate of Compliance No. 1014 for the HI-STORM 100 Cask System SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask ML24263A2062024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS NL-24-0351, – ISFSI - Registration of Spent Fuel Cask Use2024-09-13013 September 2024 – ISFSI - Registration of Spent Fuel Cask Use ML24222A8592024-08-0909 August 2024 International - HI-STORM 100 Multipurpose Canister Storage System Amendment 19 Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel ML24178A4312024-07-29029 July 2024 Issuance of Certificate of Compliance No. 1014, Amendment No. 16 for the HI-STORM 100 Cask System, Cover Letter AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel NL-24-0199, Request for Specific Exemption2024-06-25025 June 2024 Request for Specific Exemption NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24183A2752024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel ML24145A0432024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel 10 CFR 72.212 SVPLTR 24-0019, Registration of Use of Casks to Store Spent Fuel2024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks NL-24-0197, Registration of Spent Fuel Cask Use2024-05-20020 May 2024 Registration of Spent Fuel Cask Use ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters SVP-24-028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-04-26026 April 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report ML24109A2072024-04-18018 April 2024 International - Submittal of HI-STORM Final Safety Analysis Report Update BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration ML24046A2552024-02-15015 February 2024 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML24016A1902024-01-30030 January 2024 International, Inc. - Notice of Violation; the U.S. Nuclear Regulatory Commission Inspection Report 07201014/2022201 ML24018A1992024-01-18018 January 2024 International, Administrative Change to HI-2200343-A ML23363A0312024-01-0404 January 2024 Application for HI-STORM 100 Cask System, Amendment No. 19 - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Closure ML23355A0842023-12-21021 December 2023 International, Withdrawal of HI-STORM I00 Multipurpose Canister Storage System Amendment ML23324A0952023-12-0606 December 2023 Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multi-purpose Canister Storage System - Request for Additional Information ML23328A0052023-12-0505 December 2023 Issuance of Renewed Certificate of Compliance No. 1014, Amendment No. 17 for the Hi-Storm 100 Cask System (Cac/Epid 001028/L-2021-LLA-0140) ML23338A3052023-12-0404 December 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23334A1912023-11-30030 November 2023 International, Submittal of Topical Report HI-2210161-A Version ML23321A2172023-11-17017 November 2023 International, Responses to NRC Questions Form EA-23-044 Pre-Decisional Enforcement Conference JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use ML23310A0362023-11-0909 November 2023 International, Inc. - U.S. Nuclear Regulatory Commission Inspection Report 07201014/2023201 ML23283A1262023-11-0202 November 2023 Letter - Second Request for Additional Information - HI-STORM 100 Amd 18 ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23263B1232023-09-20020 September 2023 HI-STORM 100 Amendment 16 Responses to Second Round Requests for Additional Information ML23234A1572023-09-14014 September 2023 Letter to Holtec International Final Safety Evaluation for Hi-2210161, Revision No. 4, Topical Report on the Radiological Fuel Qualification Methodology for Dry Storage Systems ML23145A1752023-09-12012 September 2023 NRC Choice Letter to Holtec International with Attached Safety Inspection Report, IR 72-1014/2022-201, December 12-15, 2022, Inspection of Holtec International in Camden, New Jersey (Docket Nos.: 72-1014, 72-1032) ML23251A2512023-09-0808 September 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23230B1582023-08-28028 August 2023 Amendment 16 to Certificate of Compliance 1014 for HI-STORM 100 Multipurpose Canister Storage System Request for Additional Information Second Round 2024-09-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24274A3012024-10-0909 October 2024 Amendment 19 to CoC 1014 RAI Enclosure 1 ML24031A5622024-01-24024 January 2024 Enclosure 1 -(Public) - Second Round Requests for Additional Information Clarifications ML23324A0942023-12-0606 December 2023 Request for Additional Information ML23283A1242023-11-0202 November 2023 Enclosure 1 (Public) - HI-STORM 100 Amd 18 - 2nd RAI Round ML23257A0402023-09-12012 September 2023 SUNSI and Proprietary Review Determination Email Regarding: Holtec HI-STORM 100 Amd. 18 - Supplemental RAI Responses ML23230B1582023-08-28028 August 2023 Amendment 16 to Certificate of Compliance 1014 for HI-STORM 100 Multipurpose Canister Storage System Request for Additional Information Second Round ML23215A0612023-08-0202 August 2023 Enclosure - Summary of Discussion ML23058A1282023-03-0606 March 2023 CoC No.1014 Amendment 18 - RAI Letter (Public) ML23058A1272023-03-0606 March 2023 CoC No.1014 Amendment 18 - Enclosure RAI (Public) ML22335A4572022-12-13013 December 2022 Enclosure 1- Amendment 16 to Certificate of Compliance No. 1014 for Hi-Storm 100 Multipurpose Canister Storage System Request for Additional Information Batch 5 ML22297A1252022-10-31031 October 2022 Enclosure 1 - Summary of RAI Discussion Between NRC and Holtec Staff ML22167A1202022-07-0101 July 2022 Amendment No. 16 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Additional Information First Batch ML22122A2002022-06-23023 June 2022 Enclosure - Request for Supplemental Information - Rsi ML22021B5632022-01-19019 January 2022 Enclosure 2 - NRC Staff Comments on Draft RAI Response ML21299A2652021-11-0303 November 2021 RAI Letter to Holtec_Shielding Moe Topical Report ML21299A2662021-11-0303 November 2021 Enclosure - Moe Topical Report RAIs ML21176A1102021-06-29029 June 2021 Moe Fqt Topical Report - Enclosure (Request for Supplemental Information) ML21029A1072021-02-18018 February 2021 HI-STORM 100 CoC Renewal Clarification RAIs ML20205L5022020-08-0404 August 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Second Request for Additional Information ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information ML18292A5232018-10-19019 October 2018 Letter to K. Manzione Acceptance Review of Request for Amendment No. 13 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Supplemental Information (W/Enclosure) 0CAN111405, Response to Request for Additional Information Request for Exemption from Holtec International Certificate of Compliance (CoC) (72-1014) Fuel Specification and Loading Conditions (TAC No. L24954)2014-11-0707 November 2014 Response to Request for Additional Information Request for Exemption from Holtec International Certificate of Compliance (CoC) (72-1014) Fuel Specification and Loading Conditions (TAC No. L24954) ML14308A0152014-11-0303 November 2014 Ltr to S. L. Pyle Request for Exemption from Holtec International Certificate of Compliance No. 1014 Fuel Specification and Loading Conditions at Arkansas Nuclear One Independent Spent Fuel Storage Installation - Request for Additional Info 2024-10-09
[Table view] |
Text
July 1, 2022 Denise Elisio Licensing Engineer Holtec International Holtec Technology Campus 1 Holtec Blvd.
Camden, NJ 08104
SUBJECT:
AMENDMENT NO. 16 TO CERTIFICATE OF COMPLIANCE NO. 1014 FOR THE HI-STORM 100 MULTIPURPOSE CANISTER STORAGE SYSTEM -
REQUEST FOR ADDITIONAL INFORMATION FIRST BATCH
Dear Denise Elisio:
By letter dated March 9, 2021 [Agencywide Documents Access and Management System (ADAMS) Accession No. ML21068A360] and supplemented by letters dated August 11, 2021 (ML21223A045), and January 28, 2022 (ML22028A372), Holtec International (Holtec) submitted to the U.S. Nuclear Regulatory Commission a request to amend the Certificate of Compliance No. 1014 for HI-STORM 100 Multipurpose Canister Storage System. By a letter dated February 17, 2022 (ML22048C222), Holtec requested to separate the portion implementing Graded Approach (ML19353D337) from the Amendment No. 16 application.
The NRC staff reviewed your application and determined the need for additional information.
Due to resources and schedules, we will issue staggered requests for additional information (RAIs). The enclosure to this letter contains RAIs for all disciplines except structural, shielding, and materials. We plan to issue the second batch of RAIs in August 2022. We request that you provide the responses to these RAIs within 30 days from the date of this letter. If you are unable to meet this deadline, please notify us in writing, within two weeks of receipt of this letter, of your new submittal date and the reasons for the delay.
D. Elisio 2 Please reference Docket No. 72-1014, CAC No. 001028 and EPID No. L-2021-LLA-0039 in future correspondence related to this licensing action. If you have any questions, please contact me at 301-415-1018.
Sincerely, Signed by Chen, Yen-Ju on 07/01/22 Yen-Ju Chen, Sr. Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1014 CAC No.: 001028 EPID No.: L-2021-LLA-0039
Enclosure:
RAI First Batch
D. Elisio 3
SUBJECT:
AMENDMENT NO. 16 TO CERTIFICATE OF COMPLIANCE NO. 1014 FOR THE HI-STORM 100 MULTIPURPOSE CANISTER STORAGE SYSTEM -
REQUEST FOR ADDITIONAL INFORMATION FIRST BATCH, DOCUMENT DATE:
July 1, 2022 DISTRIBUTION PKoch, DFM HLindsay, DFM EGoldfeiz, DFM LHowe, DFM J Colaccino, DFM MDiaz-Maldonado, DFM ADAMS Accession Number: ML22167A120 (Ltr and Enc)
OFFICE: NMSS/DFM NMSS/DFM NMSS/DFM NMSS/DFM NAME: YChen WWheatley JChang JWoodfield DATE: 6/16/2022 6/21/2022 6/16/2022 6/21/2022 OFFICE: NMSS/DFM NMSS/DFM NMSS/DFM BWhite for NAME: DMarcano ARivera-Varona YDiaz-Sanabria DATE: 6/22/2022 6/29/2022 6/30/2022 OFFICIAL USE ONLY
Request for Additional Information Docket No. 72-1014 Certificate of Compliance No. 1014 Amendment No. 16 to HI-STORM 100 Multipurpose Canister Storage System The staff identified additional information needed in connection with its review of the application of Amendment No. 16 to the Certificate of Compliance (CoC) No. 1014 for HI-STORM 100 Multipurpose Canister Storage System as provided in the request for additional information (RAI) discussed below. Each question describes information needed by the staff to complete its review of the application and to determine whether the applicant has demonstrated compliance with regulatory requirements in Title 10 of the Code of Federal Regulations (10 CFR), Part 72.
Thermal RAI RAI 4-1 (A) Justify the use of concrete conductivity of 1.50 Btu/hr-ft-°F for the HI-STORM 100 unventilated with high density concrete (UVH) overpack and (B) describe how conduction test is determined and performed at the site for using a higher concrete conductivity (>1.50 Btu/hr-ft-°F) for the UVH overpack.
The applicant listed a minimum concrete conductivity of 1.50 Btu/hr-ft-°F in the proposed final safety analysis report (FSAR) table 1.D.1 for the UVH overpack and stated in Note 3 of table 1.D.1 that the listed value of thermal conductivity is a lower bound and is considered to be acceptable a priori as in most cases it would likely be exceeded. A higher conductivity of plain concrete may be used in a site-specific safety qualification if supported by appropriate conduction tests.
(A) A concrete conductivity of 1.05 Btu/hr-ft-°F (FSAR Revision 20 [ADAMS Accession No. ML20167A018] table 4.2.2) was used for the ventilated overpack. Justify the use of the concrete conductivity of 1.50 Btu/hr-ft-°F for the UVH overpack. Using a higher concrete conductivity (1.50 Btu/hr-ft-°F) for the UVH overpack is considered less conservative for analysis.
(B) Describe how the conduction test is determined and performed at the site for using a higher concrete conductivity (>1.50 Btu/hr-ft-°F) for the UVH overpack.
The staff needs this information to determine compliance with 10 CFR 72.236(f).
RAI 4-2 Justify in the application: (A) the different temperature limits for overpack inner shell and remainder of the overpack steel structure ONLY under long-term normal condition of storage and (B) the temperature limit of the multipurpose canister (MPC) baseplate is changed from 400°F (Amendment No. 15, FSAR Revision 22
[ML21221A329]) to 440°F in the proposed FSAR table 2.2.3 for long-term normal condition of storage.
(A) The proposed FSAR Table 2.2.3 shows that both overpack inner shell and remainder of the overpack steel structure share the same temperature limits of 700°F, 800°F, and 450°F for short-term events, off-normal condition, and Enclosure
2 accident condition, respectively, but have different temperature limits for long-term normal condition (475°F for overpack inner shell and 400°F for remainder of the overpack inner shell) while both components are made of steel. Justify the different temperature limits used for overpack inner shell and remainder of the overpack steel structure under long-term normal condition of storage.
(B) Justify the temperature limit of the MPC baseplate is changed from 400°F (Amendment No. 15) to 440°F in the proposed FSAR Table 2.2.3 for long-term normal condition of storage while the temperature limits remain unchanged for off-normal and accident conditions of storage.
This information is needed to determine compliance with 10 CFR 72.236(f).
RAI 4-3 Demonstrate the initial backfill pressure limits for MPC helium and annulus air pressure, shown in the proposed FSAR table 4.IV.1.3, are adequate for heat removal for MPC-32M and MPC-68M stored in HI-STORM UVH overpack.
The applicant provided initial backfill pressure limits for MPC helium and annulus air, in the proposed FSAR table 4.IV.1.3, for MPC-32M and MPC-68M stored in the UVH overpack. The applicant needs to provide derivations (e.g., calculations) in the application to demonstrate the initial backfill pressure limits in the proposed FSAR table 4.IV.1.3 are adequate for heat removal for the UVH overpack.
This information is needed to determine compliance with 10 CFR 72.236(f).
RAI 4-4 Provide information to Questions (A) and (B) below for using nitrogen (or another non-oxidizing gas) for backfill gas within MPC and annulus of the UVH overpack.
The applicant stated, in the proposed FSAR section 8.IV.1.7, step 7, that evacuate air within the MPC and the annulus of the UVH overpack and replace air with dry nitrogen (or another non-oxidizing gas) using couplings provided in the small penetrations in the cask body. The applicant provided the description of the UVH overpack annulus evacuation system and the nitrogen (or another non-oxidizing gas) backfill system in the proposed FSAR table 8.IV.1.6. The applicant also stated, in FSAR section 8.IV.1.7, step 7, that the target fill pressure of the non-oxidizing fill gas shall be as indicated in table 4.IV.1.3.
(A) Nitrogen (or another non-oxidizing gas) has different material properties from helium (e.g., viscosity, thermal conductivity, etc.), and the difference in properties may cause changes in flow pattern and heat removal capacity within the MPC. With differences existing in material properties between helium and nitrogen (or another non-oxidizing gas), justify the target backfill pressure limits of the non-oxidizing fill gas remain the same as the backfill pressure limits for the helium, as indicated in table 4.IV.1.3, set for the MPC and the annulus for MPC32M and MPC-68M stored within the UVH overpack.
(B) Clarify whether the annulus of the UVH overpack can be filled with the air when the MPC is backfilled with nitrogen (or another non-oxidizing gas) for storage.
This information is needed to determine compliance with 10 CFR 72.236(f).
3 Operating Procedure RAI 8-1 Revise the proposed FSAR section 8.IV.1.7 to provide clear step-by-step instructions on the installation of lid studs, washers, and hex nuts after the lid is placed on top of the gasket, prior to movement of the storage cask to the ISFSI pad.
In HI-STORM 100 Amendment No. 16 proposed FSAR, section 8.IV.0, Introduction, states:
The operations associated with the use of the HI-STORM 100 UVH system, are like the operations for the standard HI-STORM 100 system. The following sections describe those operations that are, in any respect, unique to the HI-STORM 100 UVH system and thus supplement the information presented in Chapter 8. Where practical, the section numbers used below directly reference the corresponding sections in Chapter 8. For example, Section 8.IV.3.5 supplements the operations described in Subsection 8.3.5. The guidance provided in this supplement shall be used along with the operations procedures provided in Chapter 8 to develop the site-specific operating procedures for the HI-STORM 100 UVH.
The proposed FSAR section 8.IV.1.7, Placement of HI-STORM 100 UVH into Storage, states that it shall incorporate the following instructions as additional steps to the generic guidance in section 8.1.6 (should be 8.1.7) on loading operations for unventilated cask models in the official HI-STORM 100 FSAR revision 23 (ML22108A277).
The proposed FSAR section 8.IV.1.7 step 1 states, Before installing the Closure Lid on the cask body, the lid gasket is placed on the top of the casks top ring.
The proposed FSAR section 8.IV.1.7 step 3 states, Place cask lid on top of the gasket.
The proposed FSAR section 8.IV.1.7 step 5 states, After the cask is placed in its storage location on the ISFSI pad install lid studs, washers, and hex nuts onto the cask.
The proposed FSAR section 8.IV.1.7 step 6 states, Tighten lid hex nuts to the point of contact with the washer. Then loosen nut to provide a nominal axial gap of 0.5 inches.
In the official HI-STORM 100 FSAR revision 23, the existing section 8.1.7, Placement of HI-STORM into Storage, step 18.a states: Remove the alignment device. Step 18.e states: Install the HI-STORM lid and the lid studs and nuts or lid closure bolts. See Table 8.1.5 for bolting Requirements. Step 18.i states: Secure HI-STORM to the transporter device as necessary. Step 20 states: Transfer the HI-STORM to its designated storage location at the appropriate pitch.
It is clear from the existing instruction in FSAR section 8.1.7, steps 18.a, 18.e, 18.i and 20, that a ventilated overpack lid must be mechanically fastened down (attached) to the overpack body prior to transferring the HI-STORM 100 to its storage location at an ISFSI. However, it is not clear whether the cask lid for the UVH is to be mechanically fastened down (attached) to the overpack body after placing the lid on
4 top of the gasket prior to transferring the MPC loaded HI-STORM 100 UVH to its storage location at an ISFSI. The proposed FSAR section 8.IV.1.7 step 5 only states that after the UVH cask is in its storage location on the ISFSI pad to install the lid studs, washers, and hex nuts onto the cask.
With the lid resting on the UVH cask without fastening it to the cask during cask transport is an unanalyzed condition. The UVH cask cannot be transported to its final location on a ISFSI pad after the stack up operation and having its lid placed on the top of the gasket without being mechanically fastened (attached) to the UVH cask. If a transport trailer is used to transport a MPC loaded UVH cask, the cask lid must first be mechanically attached to the UVH cask. Provide clear new step-by-step instructions in FSAR section 8.IV.1.7 that after the lid is placed on the top of the gasket, how will the lid studs, washers, and hex nuts be installed and the lid hex nuts hand tightened to contact the washers. Only after the UVH cask is at its final ISFSI location shall the nuts be loosened to provide a 0.5-inch axial gap.
If a Vertical Cask Transporter (VCT) is used to transport a MPC loaded UVH cask, revise the proposed FSAR section 8.IV.1.7 to provide procedural steps on how to attach the VCT special lifting devices so that the mechanical connection does not crush the gasket under the lid. If a VCT is used for transport, only after the UVH cask is at its final location on the ISFSI pad and the VCT special lifting devices removed, invoke new section 8.IV.1.7 steps 5 and 6.
This information is needed to determine compliance with 10 CFR 72.234(f).
Editorial Changes Consider the following editorial changes to the HI-STORM 100 Amendment No. 16 proposed FSAR:
A) In section 8.IV.1 paragraph, change Subsection 8.1.1 through 8.1.5 to Subsection 8.1.1 through 8.1.6.
B) In section 8.IV.1.7 first paragraph change Section 8.1.6 to Section 8.1.7.
C) Table 8.IV.1.8 should reference main table 8.1.8 instead of table 8.2.3.
D) The paragraph in section 8.IV.4 should reference section 8.4 instead of section 8.3.
E) The first sentence of the section 8.IV.5 paragraph should read: When the MPC is received from transport and transferred to a HI-STORM 100 UVH Overpack the procedures from Section 8.5 are used. The current statement is incorrect.
F) The paragraph in section 9.IV.2 should reference Supplement IV, not #I.
G) The sentence in section 9.IV.2.3 should read: The HI-STORM 100 UVH does not have vents and will not have the option of a monitoring system which must be maintained.
Ltr ML22167A120 OFFICE NMSS/DFM/STLB NMSS/DFM/STLB NMSS/DFM/CTCFB NMSS/DFM/IOB NAME YChen YC WWheatley WW FChang FC JWoodfield JW DATE Jun 16, 2022 Jun 21, 2022 Jun 21, 2022 Jun 21, 2022 OFFICE OEDO NMSS/DFM/CTCFB NMSS/DFM/STLB NMSS/DFM/STLB YDiaz-Sanabria NAME ARivera-Varona AR DMarcano DM YChen YC BWhite for BW DATE Jun 29, 2022 Jun 22, 2022 Jun 30, 2022 Jul 1, 2022