Letter Sequence RAI |
---|
CAC:000993, (Approved, Closed) CAC:001028, (Approved, Closed) EPID:001028, CoC 1029 Renewal Rsi Transmittal Letter Package (Approved, Closed) EPID:L-2020-LNE-0004, (Approved, Closed) EPID:L-2020-RNW-0024, (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML18101A024, ML18108A052, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18215A370, ML19276D398, ML19280B250, ML20014E677, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N282, ML20065N285, ML20094G482, ML20104C016, ML20115E377, ML20121A272, ML20136A049, ML20150A300, ML20155K742, ML20160A040, ML20161A088, ML20182A700, ML20212L878, ML20223A036, ML20224A287, ML20260H376, ML20267A102, ML20279A501, ML20279A558, ML20280A290, ML20289A493, ML20293A102, ML20315A013, ML20318A322, ML20323A043, ML20328A129, ML20349A207, ML20349A208, ML20349A209, ML20349A210, ML20349A211, ML20351A371, ML20352A045, ML21025A332, ML21050A321... further results
|
MONTHYEARML18060A3302018-02-28028 February 2018 Package: Request for Additional Information Regarding GE-Hitachi's Decommissioning Funding Plan Update for Morris ISFSI Project stage: Request ML18060A3322018-02-28028 February 2018 Enclosurequest for Additional Request (Request for Additional Information Regarding GE-Hitachi's Decommissioning Funding Plan Update for Morris ISFSI) Project stage: RAI ML18060A3332018-02-28028 February 2018 Letter to S. P. Murray Request for Additional Information Regarding GE-Hitachi's Decommissioning Funding Plan Update for Morris ISFSI Project stage: RAI ML18101A0242018-03-31031 March 2018 Rancho Seco ISFSI - License Renewal Application, Revision 0 Project stage: Other ML18108A0522018-04-12012 April 2018 E-mail from W. Reed/Dsfm to D. Tallman/Sacramento Municipal Utility District/Rancho Seco Assets Acknowledgement of Rancho Seco ISFSI Renewal Application Project stage: Other ML18150A0862018-05-29029 May 2018 Letter to D. Tallman Request for Supplemental Information for Acceptance Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (W/Enclosursi and Observations) Project stage: Acceptance Review ML18179A2662018-06-25025 June 2018 Enclosure 10 - California All Purpose Acknowledgment of Smud Affirmation Pursuant to 10 CFR 72.16(b) Project stage: Other ML18179A2582018-06-25025 June 2018 Enclosure 2 - Rsi and Observations and Responses Project stage: Other ML18179A2562018-06-25025 June 2018 Transmittal of Response to Request for Supplemental Information for Acceptance Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License No. SNM-2510 for the Rancho Seco Independent Spent Fuel Storage Ins Project stage: Response to RAI ML18179A2602018-06-30030 June 2018 Enclosure 4 - Rancho Seco ISFSI License Renewal Application, Revision 1 (Non-Proprietary Version) Project stage: Other ML20052D9362018-07-0303 July 2018 Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Project stage: Request ML18201A4552018-07-20020 July 2018 Letter to D. Tallman Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM 2510 - Accepted for Review (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Other ML18215A3702018-08-0303 August 2018 08/03/2018, Conversation Record with D. Shaw (Tn) Discuss Declared Proprietary Information in License Renewal Application (Conversation Held on July 20, 2018) Project stage: Other ML18267A2142018-08-29029 August 2018, 25 September 2018 Package: Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Request ML18261A0312018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18261A0222018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18261A0102018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18267A2112018-09-25025 September 2018 Memorandum to A. Rivera-Varona Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Meeting ML18285A3812018-09-26026 September 2018 Transmittal of Response to Request for Information for Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License No. SNM-2510 for the Rancho Seco Independent Spend Fuel Storage Installation Project stage: Response to RAI ML18298A0702018-10-23023 October 2018 Letter to K. Manzione Holtec Internationals Certificate of Compliance No. 1040 - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18320A1842018-11-16016 November 2018 Letter to J. Isakson Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI, Part 1 (W/Enclosure 1) Project stage: RAI ML19032A2302019-02-0404 February 2019 Summary of Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the Interim Storage Partner Consolidated Isfs Application for a Facility at Andrews County, Texas (W/Encl. 1&2) Project stage: RAI ML19065A0192019-03-0606 March 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the WCS Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72.1050 - First Request for RAI Part 2 (W/Enclosure 1) Project stage: RAI ML19072A1562019-03-14014 March 2019 Summary of Partially Closed Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the ISP Cisf Application for a Facility at Andrew'S County, Tx (W/Encl. 1&2) Project stage: RAI ML19126A0682019-04-0303 April 2019, 6 May 2019 Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas Project stage: Request ML19112A0732019-04-17017 April 2019 Enclosursi (Non-Proprietary)(Letter to K. Manzione Acceptance Review of Holtec International HI-STORM Umax Application for Certificate If Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Dkt No. 72-1040, EPID: L-2018-LLA-0275) Rsi) Project stage: Acceptance Review ML19112A0712019-04-17017 April 2019 Package: Acceptance Review of Holtec International HI-STORM Umax Application for Certificate If Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Dkt No. 72-1040, EPID: L-2018-LLA-0275) Request for Supplemental Information Project stage: Request ML19112A0722019-04-17017 April 2019 Letter to K. Manzione Acceptance Review of Holtec International HI-STORM Umax Application for Certificate If Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Dkt No. 72-1040, EPID: L-2018-LLA-0275) Request for Supplemental Information Project stage: Acceptance Review ML19105B2172019-04-19019 April 2019 Memorandum to C. Regan Summary of March 20, 2019, Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the Interim Storage Partners Consolidated Isf Application (W/Enclosures 1 and 2) Project stage: RAI ML19120A4282019-04-23023 April 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI (W/Enclosure) Project stage: RAI ML19126A0662019-05-0606 May 2019 Memorandum to C. Regan Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas (W/Enclosure 1 & 2) Project stage: RAI ML20015A4502019-05-31031 May 2019 Sprint Andrews County Disposal Facility, Andrews County, Texas- Railroad Commission of Texas Commercial Processing and Disposal Facility Permit Application Project stage: Other ML19150A5592019-06-0303 June 2019 Letter to J. Isakson Site Audit Plan for Interim Storage Partners Proposed Application for a Site-Specific License of an Away-from-Reactor Independent Spent Fuel Storage Installation Project stage: Other ML19156A0532019-06-0404 June 2019 E-Mail from C. Markley/Nrc to Y. Douglas/Orano Acknowledgement of NRC Receipt of Standardized Advanced Nuhoms CoC 1029 Renewal Application Project stage: Other ML19168A0582019-06-13013 June 2019 Letter to D. Tallman Request for Clarification of Response to Additional Information for the Technical Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (W/Enclosure) Project stage: Approval ML19164A1732019-06-24024 June 2019 Letter to K. Manzione Acceptance Review Completed for Holtec International HI-STORM Umax Application for Certificate of Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Docket No. 72-1040, EPID: L-2018-LLA-0275) Project stage: Acceptance Review ML19182A1072019-07-0101 July 2019 Letter to J. Isakson Interim Storage Partners Llc'S Application for a Specific ISFSI for the Waste Control Specialists Consolidated Interim Storage Facility for Spent Nuclear Fuel - Revised Review Schedule Project stage: Other ML20015A4512019-08-22022 August 2019 Report No. R1432-01, Acoustical Analysis of ISP Cisf Project stage: Other ML19266A4202019-09-10010 September 2019 Letter to P. Narayanan U.S. Nuclear Regulatory Commission Approval of Tn Americas' Request for Withholding Information from Public Disclosure for CoC 1029 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML19280B7632019-09-30030 September 2019 Letter to D. Tallman Nuclear Regulatory Commission Approval If Sacramento Municipal Utility District Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI Project stage: Withholding Request Acceptance ML19280B2502019-09-30030 September 2019 Conversation Record with D. Tallman/Smud Discuss California Department of Fish and Wildlife Recommendations for the California Tiger Salamander, Conversation Held on September 24, 2019 Project stage: Other ML19275E9082019-09-30030 September 2019 Letter - Holtec International HI-STORM Umax Application for Certificate of Compliance No. 1040, Amendment No. 4 - Request for Additional Information Project stage: RAI ML19275E8282019-09-30030 September 2019 Holtec Umax Amendment 4 RAI Project stage: Request ML19276D3982019-10-0303 October 2019 Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML19310F8842019-11-0404 November 2019 CoC 1029 Renewal Rsi Transmittal Letter Enclosure - v02 (Pub) Project stage: Other ML19310F7442019-11-0404 November 2019 CoC 1029 Renewal Rsi Transmittal Letter Package Project stage: Request ML19310F8832019-11-0404 November 2019 CoC 1029 Renewal Rsi Transmittal Letter Project stage: Other ML20015A4542019-11-30030 November 2019 Socioeconomic Impacts of the Proposed Spent Nuclear Fuel Consolidated Interim Storage Facility, Andrews County, Texas, Revision 5 Project stage: Other ML19345E2012019-12-0606 December 2019 Conversation Record - Clarification Call (12/6/2019) on RAI #1 for CoC 1040 Umax Amendment 4 Project stage: RAI 2019-11-04
[Table View] |
|
---|
Category:Letter
MONTHYEARML24299A0682024-10-25025 October 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24284A1182024-10-10010 October 2024 GEH - Notification of GE Company Stock Beneficial Ownership Filing ML24296B1562024-07-0303 July 2024 GE-Hitachi Nuclear Energy Americas, LLC - Updated GEH Morris Operation Decommissioning Funding Plan, Revision 6 (Redacted Version of ML24185A193) ML24156A0752024-06-10010 June 2024 Application for Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 for the Morris Operation - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Clos ML24145A1292024-05-24024 May 2024 Morris Operation Request to Withdraw Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation IR 07200001/20230012024-03-0707 March 2024 GE Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation NRC Inspection Report 07200001/2023001 ML24057A2742024-02-26026 February 2024 GE-Hitachi Nuclear Energy Americas, LLC, 2023 GEH Morris Operation Annual Effluent Report ML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24004A1652024-01-0404 January 2024 Morris Operation (Mo) Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23345A0812023-12-11011 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed IR 07200001/20234012023-11-28028 November 2023 GE Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation NRC Security Inspection Report 07200001/2023401 ML23276B3952023-10-13013 October 2023 The U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23177A0892023-06-26026 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 2 ML23171A9762023-06-20020 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 1 ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23044A3282023-02-10010 February 2023 GEH Morris Operation Submittal of Updated Consolidated Safety Analysis Report (CSAR, Rev 15A, Feb 2023) ML22350A4702022-12-12012 December 2022 GEH Morris Operation Submittal of Biennial Report 10CFR72.48; Changes, Tests, and Experiments ML22242A0162022-11-22022 November 2022 Cover Letter for GEH Morris Operation ISFSI Subsequent License Renewal ML22313A1452022-11-0909 November 2022 Usfws Illinois-Iowa Ecological Services Field Office - Species List for Proposed License Renewal for GE-Hitachi Morris Operation Independent Spent Fuel Storage Installation - Project Code: 2022-0044583 ML22249A0952022-09-0808 September 2022 Proprietary Determination Letter for GEH-Morris License Renewal Application Submittals ML22249A3652022-09-0606 September 2022 GEH Notification of GE Company Stock Beneficial Ownership Filing ML22146A3512022-05-19019 May 2022 Usfws Illinois-Iowa Ecological Services Field Office - Species List for Proposed License Renewal for Morris Operation Independent Spent Fuel Storage Installation - Project Code: 2022-0044583 ML22132A0722022-05-12012 May 2022 GEH Morris Operation (Mo) Response to NRC Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 ML22084A5782022-03-23023 March 2022 GNF-A/GEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML22068A1322022-03-0909 March 2022 GE-Hitachi Nuclear Energy Americas, LLC, Notification of Stock Beneficial Ownership Filing ML22054A0292022-02-22022 February 2022 GE-Hitachi Nuclear Energy Americas, LLC, 2021 Morris Operation Annual Effluent Report ML22042A4152022-02-11011 February 2022 GE-Hitachi Nuclear Energy Americas, LLC - GEH Notification of GE Company Stock Beneficial Ownership Filings ML22027A5162022-01-27027 January 2022 GEH - Morris Operation (Mo) Response to Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 ML21216A2752022-01-0505 January 2022 GEH Morris DFP Close-out Letter ML21326A2662021-11-22022 November 2021 GEH Notification of GE Company Stock Beneficial Ownership Filing ML21319A2202021-11-17017 November 2021 Letter - Proprietary Determination for GEH Morris DFP Submittals ML21340A2432021-09-28028 September 2021 Illinois Threatened and Endangered Species by County, as of December 2020 IR 07200001/20214012021-09-27027 September 2021 GE-Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07200001/2021401 ML21252A1382021-09-0909 September 2021 GEH - Morris Operation (Mo) Decommissioning Funding Plan (DFP) Redacted Versions ML22063B1752021-08-30030 August 2021 Email and Letter from D. Hunter of Miami Tribe NRC Preliminary Determination Under Section 106 of the NHPA for Proposed GE-Hitachi Morris Operation ISFSI License Renewal ML21214A3102021-08-30030 August 2021 Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 (Cac/Epid Nos. 001028/L-2020-RNW-0024) ML21138A9052021-08-0202 August 2021 Letter to Hannahville Indian Community Re NRC Preliminary Determination Under Section 106 of the National Historic Preservation Act ML21186A0082021-08-0202 August 2021 Letter to Citizen Potawatomi Nation Re NRC Preliminary Determination Under Section 106 of the NHPA ML21186A0092021-08-0202 August 2021 Letter to Forest County Potawatomi Re NRC Preliminary Determination Under Section 106 of the NHPA ML21186A0112021-08-0202 August 2021 Letter to Ho-Chunk Nation Re NRC Preliminary Determination Under Section 106 of the NHPA ML21188A2052021-08-0202 August 2021 Letter to Kickapoo Tribe in Kansas Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2312021-08-0202 August 2021 Letter to Little Traverse Bay Bands of Odawa Indians Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2522021-08-0202 August 2021 Letter to Match-E-Be-Nash-She-Wish Band of Potawatomi Indians Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2602021-08-0202 August 2021 Letter to Menominee Indian Tribe of Wisconsin Re NRC Preliminary Determination Under Section 106 of the NHPA 2024-07-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML21214A3102021-08-30030 August 2021 Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 (Cac/Epid Nos. 001028/L-2020-RNW-0024) ML21167A3322021-06-15015 June 2021 Request for Additional Information on Morris Operation Decommissioning Funding Plans ML20275A2802020-10-15015 October 2020 GEH-Morris License Renewal Rsi, Request for Supplemental Information for Acceptance Review of the Application for Renewal of the Morris Operation License No. SNM-2500 (Cac/Epid Nos. 001028/L-2020-RNW-0024 and 000993/L-2020-LNE-0004) ML18060A3322018-02-28028 February 2018 Enclosurequest for Additional Request (Request for Additional Information Regarding GE-Hitachi's Decommissioning Funding Plan Update for Morris ISFSI) ML1113003182011-06-0202 June 2011 Enclosurequest for Additional Information Regarding Parent Company Guarantee and Annual Financial Test for General Electric Hitachi (TAC No L33125) ML0722503042007-08-0909 August 2007 Request for Additional Information on Employee Transfers Val and Morris License Transfer Request 2021-08-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 30, 2021 Mr. Scott P. Murray Manager, Facility Licensing GE Hitachi Nuclear Energy 3901 Castle Hayne Road P.O. Box 780, M/C K-84 Wilmington, NC 28402
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE TECHNICAL REVIEW OF THE APPLICATION FOR RENEWAL OF THE MORRIS OPERATION LICENSE NO. SNM-2500 (CAC/EPID NOS. 001028/L-2020-RNW-0024)
Dear Mr. Murray:
By letter dated June 30, 2020, as supplemented February 26, 2021, March 19, 2021, and March 24, 2021, GE Hitachi Nuclear Energy Americas LLC (GEH) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for renewal of License No. SNM-2500 for the Morris Operation (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML20182A699, ML21057A119, ML21085A859, and ML21083A200). In my letter dated April 20, 2021, I acknowledged acceptance of your application for a detailed technical review and provided a proposed schedule for the NRC review (ADAMS Accession No. ML21104A080).
In connection with the NRC staffs technical review, we need the information identified in the enclosed request for additional information (RAI). Discussion of the RAI and RAI response date occurred on August 25, 2021 (ADAMS Accession No. ML21242A281). We request that you provide this information by January 28, 2022. Inform us at your earliest convenience, but no later than 2 weeks before the response date, if you are not able to provide the information by that date. To assist us in rescheduling your review, you should include a new proposed submittal date and the reasons for any delays.
S. Murray 2
Please reference Docket No. 72-01 and CAC/EPID Nos. 001028/L-2020-RNW-0024 in future correspondence related to this request. If you have any questions regarding this matter, please contact me at 301-415-7116 or Kristina.Banovac@nrc.gov.
Sincerely, Kristina L. Banovac, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 72-01 License No. SNM-2500 CAC/EPID Nos. 001028/L-2020-RNW-0024
Enclosure:
Request for Additional Information cc:
Morris Operation Service List Kristina L. Banovac Digitally signed by Kristina L. Banovac Date: 2021.08.31 07:48:02 -04'00'
Morris Operation Service List cc:
Scott P. Murray Manager, Facility Licensing GE Hitachi Nuclear Energy 3901 Castle Hayne Road P.O. Box 780, M/C K-84 Wilmington, NC 28402 Bobbie Lockwood General Manager, Services Operations GE Hitachi Nuclear Energy 3901 Castle Hayne Rd Wilmington, NC 28402 Tony McFadden Site Manager, Morris Operation GE Hitachi Nuclear Energy 7555 East Collins Road Morris, IL 60450 Grundy County Clerk 111 East Washington Street P. O. Box 675 Morris, IL 60450-0675 Adnan Khayyat Division Chief, Division of Nuclear Safety Illinois Emergency Management Agency 1035 Outer Park Dr Springfield, IL 62704 Steven Reynolds Manager, Nuclear Facilities Inspection Illinois Emergency Management Agency 245 W. Roosevelt Rd Bldg. 8, Suite 55 West Chicago, IL 60185 Region III Administrator U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
S. Murray 3
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE TECHNICAL REVIEW OF THE APPLICATION FOR RENEWAL OF THE MORRIS OPERATION LICENSE NO. SNM-2500 (CAC/EPID NOS. 001028/L-2020-RNW-0024)
DOCUMENT DATE: August 30, 2021 DISTRIBUTION:
NMSS/DFM r/f RidsNmssRefsFab Resource JWise, NMSS MLearn, NMSS PPeduzzi, NMSS MHenderson, NMSS FMiller, NMSS CPineda, NMSS CWolf, OCA REdwards, RIII DHills, RIII G:\\SFST\\GE Morris\\License Renewal (subsequent)\\GEH-Morris renewal technical RAI.docx ADAMS Accession Number: ML21214A310
- via email OFFICE NMSS/DFM/STLB NMSS/DFM/MSB NMSS/DFM/MSB NMSS/DFM/STLB NAME KBanovac*
DTarantino*
JWise*
WWheatley*
DATE 7/26/2021 8/26/2021 8/26/2021 8/4/2021 OFFICE NMSS/DFM/MSB NMSS/DFM/STLB NAME TBoyce*
JMcKirgan*
DATE 8/26/2021 8/27/2021 OFFICIAL RECORD COPY
Enclosure Request for Additional Information GE Hitachi Nuclear Energy Americas LLC Docket No. 72-01 License Renewal By letter dated June 30, 2020, as supplemented February 26, 2021, March 19, 2021, and March 24, 2021, GE Hitachi Nuclear Energy Americas LLC (GEH) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for renewal of License No. SNM-2500 for the Morris Operation (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML20182A699, ML21057A119, ML21085A859, and ML21083A200). This request for additional information (RAI) identifies information needed by the NRC staff in connection with its technical review of the renewal application. The staff used NUREG-1927, Revision 1, Standard Review Plan for Renewal of Specific Licenses and Certificates of Compliance for Dry Storage of Spent Nuclear Fuel (ADAMS Accession No. ML16179A148),
NUREG-1801, Revision 2, Generic Aging Lessons Learned (GALL) Report (ADAMS Accession No. ML103490041), and NUREG-2191, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, (ADAMS Accession Nos. ML17187A031 and ML17187A204) in its review of the renewal application.
Each individual RAI describes information needed by the staff for it to complete its review of the renewal application and to determine whether the applicant has demonstrated compliance with the regulatory requirements.
Note that any revisions made to the Consolidated Safety Analysis Report (CSAR), in response to these RAIs, do not need to be submitted as a revised, implemented CSAR. Rather, GEH may submit proposed changes to the CSAR as a proposed CSAR supplement (i.e., proposed additions and changes to the CSAR to address aging management activities) to support the license renewal application, consistent with the guidance in NUREG-1927. The NRC staff will include a condition in the license renewal for GEH to submit to the NRC an updated CSAR that includes the aging management information provided in the proposed CSAR supplement. This will provide for a timely CSAR update after the license renewal that reflects the aging management information submitted in the renewal application and revised through the review process.
Aging Management Review
RAI-1
Justify the exclusion of the fuel basin crane, fuel handling crane, and cask crane from the aging management review. Revise the proposed CSAR supplement, as appropriate, to demonstrate that the effects of aging of the cranes will be adequately managed.
CSAR Section 11.3 includes the fuel basin crane, fuel handling crane, and cask crane that are determined to be structures, systems, and components (SSCs) important to safety within the scope of renewal. However, these SSCs are missing from the aging management review provided in Table 1, Aging Management Program Review, of CSAR Appendix A.8, Aging Management.
The NRC staff notes that CSAR Appendix A.8 designates the cranes and grapples as ancillary equipment important to safety that are on a routine maintenance schedule or inspected prior to use. Table 1 of CSAR Appendix A.8 includes the grapples subject to an aging management
2 review, but not the cranes. NUREG-1927 states that all important-to-safety SSCs should be within the scope of renewal and addressed with an aging management review. Also, 10 CFR 72.42(a) states that renewal applications should include descriptions of aging management programs (AMPs) for the management of aging issues for SSCs important to safety.
The staff notes that existing site processes can be credited for managing the effects of aging; however, the CSAR does not provide any details on the credible aging mechanisms and effects for the cranes or how the maintenance activities adequately manage the effects of aging.
This information is required to demonstrate compliance with 10 CFR 72.42(a).
RAI-2
Justify the exclusion of the Zircaloy cladding from the aging management review. Revise the proposed CSAR supplement, as appropriate, to demonstrate that the effects of aging of the Zircaloy cladding will be adequately managed.
CSAR Section 11.3 includes the spent fuel cladding fabricated from stainless steel or Zircaloy, which is determined to be an SSC important to safety within the scope of renewal. However, the Zircaloy cladding is missing from the aging management review provided in Table 1 of CSAR Appendix A.8. The NRC staff notes that Table 1 of CSAR Appendix A.8 includes the stainless steel cladding subject to an aging management review, but not the Zircaloy cladding.
NUREG-1927 states that all important-to-safety SSCs should be within the scope of renewal and addressed with an aging management review. Also, 10 CFR 72.42(a) states that renewal applications should include descriptions of AMPs for the management of aging issues for SSCs important to safety.
This information is required to demonstrate compliance with 10 CFR 72.42(a).
RAI-3
Clarify whether the coatings applied to the steel building structures are relied on to manage the aging effects for the SSCs within the scope of renewal and, if so, provide details on the type and quality of the coatings and the aging management activities that will ensure that the coatings remain intact. Revise the proposed CSAR supplement, as appropriate.
The Detection of Aging Effects program element of the Structures Monitoring AMP states that the 5-year visual inspections are supplemented with annual visual inspections for deterioration of the steel building structures due to corrosion and coating degeneration. Table 2 of CSAR Appendix A.8 provides acceptance criteria for coatings on the steel structures. However, the information for the coating materials is not included in the CSAR. It is unclear whether the coatings are credited with performing an important-to-safety function or protecting an important-to-safety component that meets the scoping criteria in NUREG-1927. An additional AMP may be necessary to manage protective coatings that perform an important-to-safety function.
This information is required to demonstrate compliance with 10 CFR 72.42(a).
3 Aging Management Program
RAI-4
Clarify the inspection coverage in the Structures Monitoring AMP that demonstrates that potential aging-related degradation will be identified and appropriately evaluated. Revise the AMP in the proposed CSAR supplement, as appropriate.
The Detection of Aging Effects program element of the Structures Monitoring AMP states that the visual inspections will be performed every 5 years by qualified inspectors in accordance with Morris Operation Standard Operating Procedure (SOP) 16-17 and American Concrete Institute (ACI) 349.3R-02. As neither SOP 16-17 nor ACI 349.3R-02 has specific requirements for inspection coverage, the staff requires clarification of whether 100 percent of readily accessible surfaces will be inspected, or whether inspections will involve some justified lower extent of coverage.
This information is required to demonstrate compliance with 10 CFR 72.42(a).
RAI-5
Clarify inspection activities in the Structures Monitoring AMP for managing stress corrosion cracking and loss of material due to pitting and crevice corrosion of the fuel basin liner. Revise the AMP in the proposed CSAR supplement, as appropriate, to demonstrate that the effects of aging of the liner will be adequately managed.
The Structures Monitoring AMP in the CSAR states that the AMP elements are consistent with those in AMP XI.S6 (Structures Monitoring) from NUREG-1801, Rev. 2. NUREG-1801, Rev. 2 and NUREG-2191 recommend the Water Chemistry AMP and monitoring of the spent fuel pool water level and leakage from the leak chase channels to manage cracking due to stress corrosion cracking and loss of material due to pitting and crevice corrosion of the fuel pool liner.
However, the Structures Monitoring AMP in the CSAR includes various inspection activities at 5-year intervals, the details of which are unclear.
The Detection of Aging Effects program element of the Structures Monitoring AMP states that qualified inspectors will examine the stainless steel basin liner at 5-year intervals. Table 1 of CSAR Appendix A.8 identifies stress corrosion cracking and loss of material due to pitting and crevice corrosion as credible aging effects/mechanisms for the liner. The parameters inspected in the Parameters Monitored or Inspected program element and the acceptance criteria for the stainless steel liner in Table 2 of CSAR Appendix A.8 are associated with evidence of bulges or depressions in the liner plate, the measurement of leakage rate via the leak chase channels, and monitoring of the basin water chemistry.
Provide the following clarifying details of the liner inspections in the Detection of Aging Effects AMP element:
- 1. Clarify which of the five listed basin inspection/monitoring activities includes the periodic, 5-year, inspections of the liner plate. The staff notes that activity c cites a 5-year inspection, but it does not specifically mention the liner. Activity d appears that it may address the liner, but only in the context of an opportunistic inspection when fuel baskets are moved.
4
- 2. Describe the area of coverage of the 5-year inspections of the liner plate (i.e., to what extent the liner is normally accessible and inspected for these periodic inspections).
- 3. Explain how evidence of bulges or depressions in the liner plate are indicators of cracking and loss of material of the plate.
This information is required to demonstrate compliance with 10 CFR 72.42(a).
RAI-6
Clarify the role of the acceptance criteria for the basin water radioactivity for the management of the effects of aging in the Water Chemistry AMP, and revise the AMP in the proposed CSAR supplement, as appropriate.
The Acceptance Criteria program element of the Water Chemistry AMP states that basin water has the following radioactivity and conductivity limits.
a) Conductivity must be <1.35 µMho/cm.
b) Basin water activity (gross beta) must be less than 0.02 µCi/ml CSAR Section 10.4.5, Basin Water Chemical Characteristics, states that a conductivity value of 1.35 µMho/cm is equivalent to a pH value of 5.5 to 8.0, which is commensurate with a benign environment for fuel and equipment stored in the basin water. Technical Specification 4.6, Basin Water Radioactive Contaminants, states that the basin water beta activity value of 0.02 µCi/ml is consistent with current decontamination practices, above which additional basin water cleanup measures shall be initiated. The technical specification and the CSAR (Sections 4.3.8.2, 5.5.2.2, 7.3.2, 7.5, 10.4, 10.4.6) further indicate that this activity level assures that concentration of radioactive materials remain as low as is reasonably achievable (ALARA), in terms of radiation protection and keeping exposures ALARA. However, it is not clear how the basin water activity level is an indication of age-related degradation (i.e., how an aging mechanism is linked to this monitored parameter). Also, if this activity level is tied to degradation of an SSC (or fuel), clarify how this value is chosen as an acceptance criterion for timely identification of an aging effects and implementation of corrective actions.
This information is required to demonstrate compliance with 10 CFR 72.42(a).