Letter Sequence RAI |
---|
EPID:L-2021-LLA-0039, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement
Results
Other: ML21223A048, ML21223A049, ML21223A050, ML21223A056, ML22028A372, ML22196A086, ML22243A274, ML22243A278, ML22325A338, ML23005A002, ML23005A006, ML23005A275, ML23013A340, ML23013A341, ML23013A342, ML23013A343, ML23013A344, ML23013A345, ML23013A346, ML23013A347, ML23076A272, ML23076A275, ML23076A278, ML23263B123, ML23263B124, ML23263B125, ML23263B127
|
MONTHYEARML21068A3612021-03-0909 March 2021 International, Submittal of HI-STORM 100 Multipurpose Canister Storage System Amendment 16 Request Project stage: Request ML21179A1792021-07-12012 July 2021 Acceptance Review of Request for Amendment No. 16 to Certificate of Compliance No. 1014 for HI-STORM 100 Multipurpose Canister Storage System, Request for Supplemental Information Project stage: Acceptance Review ML21201A0282021-07-23023 July 2021 Handout for Meeting with Holtec on HI-STORM 100 Amendment No. 16 (July 27, 2021) Project stage: Request ML21237A0422021-07-23023 July 2021, 25 August 2021 Summary of July 27, 2021, Public Meeting on HI-STORM 100, Amendment No. 16, Graded Approach Project stage: Request ML21223A0562021-08-10010 August 2021 Attachment 10: Affidavit in Accordance with 10 CFR 2.390 Project stage: Other ML21223A0452021-08-10010 August 2021, 11 August 2021 HI-STORM 100 Amendment 16 Responses to Requests for Supplemental Information Project stage: Request ML21223A0502021-08-11011 August 2021 Attachment 4: HI-STORM 100 FSAR Proposed Revision 21A, Changed Pages (non-proprietary) Project stage: Other ML21223A0462021-08-11011 August 2021 HI-STORM 100 Amendment 16 Responses to Requests for Supplemental Information Project stage: Supplement ML21223A0482021-08-11011 August 2021 Attachment 2: HI-STORM 100 Amendment 16 Rsi Responses (non-proprietary) Project stage: Other ML21223A0492021-08-11011 August 2021 Attachment 3: HI-STORM 100 Amendment 16 Certificate of Compliance Appendix D, Changed Pages (non-proprietary) Project stage: Other ML21237A0432021-08-25025 August 2021 Summary of July 27, 2021, Public Meeting with Holtec International to Discuss Certificate of Compliance No. 1014 for the HI-STORM 100, Amendment No. 16, Graded Approach Project stage: Meeting ML22028A3712022-01-28028 January 2022 International, HI-STORM 100 Amendment 16 Additional Information on Graded Approach Project stage: Request ML22028A3722022-01-28028 January 2022 International, HI-STORM 100 Amendment 16 Additional Information on Graded Approach Project stage: Other ML22048C2222022-02-17017 February 2022 International - HI-STORM 100 Multipurpose Canister Storage System Amendment 19 Project stage: Request ML22053A1302022-03-17017 March 2022 Acceptance Review Request for Amendment No. 16 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System (Docket No. 72-1014, CAC No. 001028, EPID: L-2021-LLA-0039) Project stage: Acceptance Review ML22167A1202022-07-0101 July 2022 Amendment No. 16 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Additional Information First Batch Project stage: RAI ML22196A0862022-07-15015 July 2022 International, Schedule for Responses to HI-STORM 100 Amendment 16 Requests for Additional Information Batch 1 Project stage: Other ML22243A2702022-08-31031 August 2022 HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batches 1 and 2) Project stage: Response to RAI ML22243A2782022-08-31031 August 2022 Attachment 8: Affidavit in Accordance with 10 CFR 2.390 Project stage: Other ML22243A2692022-08-31031 August 2022 HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batches 1 and 2) Project stage: Request ML22243A2742022-08-31031 August 2022 Attachment 4: HI-STORM 100 FSAR Proposed Revision 21B, Changed Pages (non-proprietary) Project stage: Other ML22243A2722022-08-31031 August 2022 Attachment 2: Holtec Response to Request for Additional Information (Batch 1 and Partial Batch 2) Project stage: Response to RAI ML22249A3472022-09-0606 September 2022, 9 September 2022 International, HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 2) Project stage: Request ML22249A3482022-09-0909 September 2022 International, HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 2) Project stage: Response to RAI ML22276A2862022-10-0303 October 2022 HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 3) Project stage: Request ML22276A2872022-10-0303 October 2022 HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 3) Project stage: Response to RAI ML22325A3382022-11-21021 November 2022 Schedule for Responses to HI-STORM 100 Amendment 16 Requests for Additional Information Batch 4 Project stage: Other ML22335A4562022-12-13013 December 2022 Letter - Amendment 16 to Certificate of Compliance No. 1014 for Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Batch 5 Project stage: RAI ML22335A4552022-12-13013 December 2022 Amendment 16 to Certificate of Compliance 1014 for Hi-Storm 100 RAI Batch 5 Project stage: Request ML22335A4572022-12-13013 December 2022 Enclosure 1- Amendment 16 to Certificate of Compliance No. 1014 for Hi-Storm 100 Multipurpose Canister Storage System Request for Additional Information Batch 5 Project stage: RAI ML23005A0002023-01-0404 January 2023 International HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 4) Project stage: Request ML23005A0022023-01-0404 January 2023 Attachment 6 - Affidavit of Kimberly Manzione Project stage: Other ML23005A0042023-01-0404 January 2023 Attachment 2 - HI-STORM 100 Amendment 16 Response to Request for Additional Information (Batch 4) Project stage: Response to RAI ML23005A0062023-01-0404 January 2023 Attachment 4 - HI-STORM 100 FSAR Proposed Text Changes, Changed Pages Project stage: Other ML23005A0012023-01-0404 January 2023 International HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 4) Project stage: Response to RAI ML23005A2752023-01-0404 January 2023 Attachment 2 - Affidavit of Kimberly Manzione Project stage: Other ML23005A2732023-01-0505 January 2023 International HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 4) Additional Supporting Document Project stage: Response to RAI ML23013A3412023-01-13013 January 2023 Attachment 3 - HI-STORM 100 Amendment 16 Certificate of Compliance Appendix a, Changed Pages (Non-Proprietary) Project stage: Other ML23013A3402023-01-13013 January 2023 Attachment 2 - HI-STORM 100 Amendment 16 RAI Responses Batch 5 (Non-Proprietary) Project stage: Other ML23013A3382023-01-13013 January 2023 International HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 5) Project stage: Response to RAI ML23013A3432023-01-13013 January 2023 Attachment 5 - HI-STORM 100 Amendment 16 Certificate of Compliance Appendix C, Changed Pages (Non-Proprietary) Project stage: Other ML23013A3442023-01-13013 January 2023 Attachment 6 - HI-STORM 100 Amendment 16 Certificate of Compliance Appendix D, Changed Pages (Non-Proprietary) Project stage: Other ML23013A3452023-01-13013 January 2023 Attachment 7 - HI-STORM 100 Amendment 16 Certificate of Compliance Appendix A-100U, Changed Pages (Non-Proprietary) Project stage: Other ML23013A3462023-01-13013 January 2023 Attachment 8 - HI-STORM 100 FSAR Proposed Revision 21E, Changed Pages (Non-Proprietary) Project stage: Other ML23013A3372023-01-13013 January 2023 International HI-STORM 100 Amendment 16 Responses to Requests for Additional Information (Batch 5) Project stage: Request ML23013A3472023-01-13013 January 2023 Attachment 9 - Affidavit of Kimberly Manzione Project stage: Other ML23013A3422023-01-13013 January 2023 Attachment 4 - HI-STORM 100 Amendment 16 Certificate of Compliance Appendix B, Changed Pages (Non-Proprietary) Project stage: Other ML23076A2752023-03-17017 March 2023 Attachment 3: HI-STORM 100 FSAR Proposed Text Changes, Changed Pages Project stage: Other ML23076A2782023-03-17017 March 2023 Attachment 5: Affidavit Project stage: Other ML23076A2722023-03-17017 March 2023 HI-STORM 100 Amendment 16 RAI 3-3 Clarification Project stage: Other 2022-02-17
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24031A5622024-01-24024 January 2024 Enclosure 1 -(Public) - Second Round Requests for Additional Information Clarifications ML23324A0942023-12-0606 December 2023 Request for Additional Information ML23283A1242023-11-0202 November 2023 Enclosure 1 (Public) - HI-STORM 100 Amd 18 - 2nd RAI Round ML23257A0402023-09-12012 September 2023 SUNSI and Proprietary Review Determination Email Regarding: Holtec HI-STORM 100 Amd. 18 - Supplemental RAI Responses ML23230B1582023-08-28028 August 2023 Amendment 16 to Certificate of Compliance 1014 for HI-STORM 100 Multipurpose Canister Storage System Request for Additional Information Second Round ML23215A0612023-08-0202 August 2023 Enclosure - Summary of Discussion ML23058A1282023-03-0606 March 2023 CoC No.1014 Amendment 18 - RAI Letter (Public) ML23058A1272023-03-0606 March 2023 CoC No.1014 Amendment 18 - Enclosure RAI (Public) ML22335A4572022-12-13013 December 2022 Enclosure 1- Amendment 16 to Certificate of Compliance No. 1014 for Hi-Storm 100 Multipurpose Canister Storage System Request for Additional Information Batch 5 ML22297A1252022-10-31031 October 2022 Enclosure 1 - Summary of RAI Discussion Between NRC and Holtec Staff ML22167A1202022-07-0101 July 2022 Amendment No. 16 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Additional Information First Batch ML22122A2002022-06-23023 June 2022 Enclosure - Request for Supplemental Information - Rsi ML22021B5632022-01-19019 January 2022 Enclosure 2 - NRC Staff Comments on Draft RAI Response ML21299A2652021-11-0303 November 2021 RAI Letter to Holtec_Shielding Moe Topical Report ML21299A2662021-11-0303 November 2021 Enclosure - Moe Topical Report RAIs ML21176A1102021-06-29029 June 2021 Moe Fqt Topical Report - Enclosure (Request for Supplemental Information) ML21029A1072021-02-18018 February 2021 HI-STORM 100 CoC Renewal Clarification RAIs ML20205L5022020-08-0404 August 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Second Request for Additional Information ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information ML18292A5232018-10-19019 October 2018 Letter to K. Manzione Acceptance Review of Request for Amendment No. 13 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Supplemental Information (W/Enclosure) 0CAN111405, Response to Request for Additional Information Request for Exemption from Holtec International Certificate of Compliance (CoC) (72-1014) Fuel Specification and Loading Conditions (TAC No. L24954)2014-11-0707 November 2014 Response to Request for Additional Information Request for Exemption from Holtec International Certificate of Compliance (CoC) (72-1014) Fuel Specification and Loading Conditions (TAC No. L24954) ML14308A0152014-11-0303 November 2014 Ltr to S. L. Pyle Request for Exemption from Holtec International Certificate of Compliance No. 1014 Fuel Specification and Loading Conditions at Arkansas Nuclear One Independent Spent Fuel Storage Installation - Request for Additional Info 2024-01-24
[Table view] |
Text
Request for Additional Information Batch 5 Docket No. 72-1014 Certificate of Compliance No. 1014 Amendment No. 16 to the HI-STORM 100 Multipurpose Canister Storage System The staff identified additional information needed in connection with its review of the application of Amendment No. 16 to the Certificate of Compliance (CoC) No. 1014 for HI-STORM 100 Multipurpose Canister Storage (MPC) System as provided in the request for additional information (RAI) discussed below. Each question describes information needed by the staff to complete its review of the application and to determine whether the applicant has demonstrated compliance with regulatory requirements in Title 10 of the Code of Federal Regulations (10 CFR), Part 72.
Thermal RAI RAI 4-5 Clarify the meaning of, A minor deviation from the prescribed loading pattern in an MPCs permissible contents to allow one slightly thermally-discrepant fuel assembly per quadrant []., (e.g., the change in decay heat) and provide a bounding thermal analysis to show that the peak cladding temperature limits in interim staff guidance (ISG)-11 Rev. 3 and the important to safety (ITS) component temperature limits are met.
CoC No. 1014, appendix B, section 2.4.5, Fuel Loading Decay Heat Limits for UNVENTILATED OVERPACK, states, Tables 2.4-6a and 2.4-6b provide the maximum allowable decay heat per fuel storage location for MPC-68M in an UNVENTILATED OVERPACK. A minor deviation from the prescribed loading pattern in an MPCs permissible contents to allow one slightly thermally-discrepant fuel assembly per quadrant to be loaded as long as the peak cladding temperature for the MPC remains below the ISG-11 Rev 3 requirements is permitted for essential dry storage campaigns to support decommissioning.
It is not clear to staff what the actual meanings of: 1) a minor deviation, or 2) one slightly thermally-discrepant fuel assembly, are or 3) how it has been demonstrated through a bounding thermal analysis that the peak cladding temperature limits and ITS component temperature limits are still met should thermally-discrepant fuel assemblies be loaded in the MPC as described.
This information is needed to determine compliance with 10 CFR 72.236(f).
Confinement RAI RAI 9-2 See Enclosure 2.
RAI 9-3 See Enclosure 2.
RAI 9-4 See Enclosure 2.
RAI 9-5 See Enclosure 2.
Enclosure 1