ML23096A301
Letter Sequence Other | |
---|---|
EPID:L-2021-LLA-0053, (Open) | |
Initiation Questions Answers Results Other: ML21237A176, ML21237A177, ML21288A542, ML22192A218, ML22192A219, ML22192A220, ML22192A222, ML22192A225, ML22194A957, ML22210A147, ML22210A149, ML22210A150, ML22210A153, ML22258A251, ML22336A133, ML22336A135, ML23006A266, ML23006A267, ML23006A268, ML23006A270, ML23006A274, ML23074A102, ML23096A301, ML23128A305, ML23128A307, ML23128A313, ML23181A193, ML23181A194, ML23181A198, ML23181A201, ML23192A032, ML23192A033, ML23192A035, ML23227A249, ML23227A250, ML23227A252, ML23321A246, ML23321A247, ML23321A249, ML23321A254 | |
MONTHYEARML21096A2342021-04-0505 April 2021
[Table View]Partially Closed Pre-application Meeting for the Holtec International HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 7 Project stage: Meeting ML21105A3702021-04-20020 April 2021 Handout for Pre-Application Meeting with Holtec on HI-STORM FW Amendment No. 7 (April 20, 2021) Project stage: Meeting ML21123A0622021-05-0505 May 2021 Summary of Public Meeting with Holtec International to Discuss Upcoming Application for Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind, Amendment No. 7 Project stage: Meeting ML21126A2672021-05-0606 May 2021 International HI-STORM FW Amendment 7 Request Project stage: Request ML21237A1772021-08-25025 August 2021 Request for Supplemental Information for Amendment No. 7 to Certificate of Compliance No. 1032 for the Hi-Storm Flood/Wind Multipurpose Canister Storage System Project stage: Other ML21237A1762021-08-25025 August 2021 Request for Supplemental Information Re Holtec Intl HI-STORM Flood/Wind Multipurpose Canister Storage System, Coc No. 1032, Amendment 7 Project stage: Other ML21251A5502021-09-0808 September 2021 International, Schedule for Responses to HI-STORM FW Amd. 7 Requests for Supplemental Information Project stage: Supplement ML21288A5422021-10-15015 October 2021 Attachment 19: Affidavit of Kimberly Manzione Project stage: Other ML21288A5212021-10-15015 October 2021 Holtec International HI-STORM FW Amendment 7 Responses to Requests for Supplemental Information Project stage: Request ML21322A2902021-11-24024 November 2021 Acceptance Review of the Request for Amendment 7 to Certificate of Compliance No. 1032 for HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML22172A1932022-06-30030 June 2022 Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Request for Additional Information Batch 2 Project stage: RAI ML22192A2182022-07-11011 July 2022 Attachment 2: HI-STORM FW Amendment 7 RAI Responses Part I (non-proprietary) Project stage: Other ML22192A2192022-07-11011 July 2022 Attachment 3: HI-STORM FW Amendment 7 Certificate of Compliance Appendix a, Changed Pages (non-proprietary) Project stage: Other ML22192A2202022-07-11011 July 2022 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance Appendix B, Changed Pages (non-proprietary) Project stage: Other ML22192A2222022-07-11011 July 2022 Attachment 6: HI-STORM FW FSAR Proposed Revision 10B, Changed Pages (non-proprietary) Project stage: Other ML22192A2252022-07-11011 July 2022 Attachment 9: Affidavit in Accordance with 10CFR2.390 Project stage: Other ML22192A2162022-07-11011 July 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part I Project stage: Response to RAI ML22192A2152022-07-11011 July 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part Project stage: Request ML22194A9542022-07-13013 July 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 1 - Additional Supporting Documents Project stage: Response to RAI ML22194A9572022-07-13013 July 2022 Attachment 3: Affidavit in Accordance with 10CFR2.390 Project stage: Other ML22210A1492022-07-29029 July 2022 Attachment 3: HI-STORM FW FSAR Proposed Revision 10C, Changed Pages Project stage: Other ML22210A1462022-07-29029 July 2022 HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 2 Project stage: Response to RAI ML22210A1482022-07-29029 July 2022 Attachment 2: Updated Summary of Proposed Changes (non-proprietary) Project stage: Request ML22210A1502022-07-29029 July 2022 Attachment 4: HI-STORM FW FSAR Proposed Revision 10C, Changed Pages (non-proprietary) Project stage: Other ML22210A1452022-07-29029 July 2022, 29 September 2022 HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 2 Project stage: Request ML22210A1532022-07-29029 July 2022 Attachment 7: Affidavit in Accordance with 10CFR2.390 Project stage: Other ML22258A2502022-09-15015 September 2022 International, HI-STORM FW Amendment 7 RAI Responses Part 1 Clarification Call Action Items Project stage: Request ML22258A2512022-09-15015 September 2022 International, HI-STORM FW Amendment 7 RAI Responses Part 1 Clarification Call Action Items Project stage: Other ML22210A1472022-09-29029 September 2022 Attachment 1: HI-STORM FW Amendment 7 RAI Responses Part 2 (non-proprietary) Project stage: Other ML22276A2812022-10-0303 October 2022 HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 3 Project stage: Request ML22276A2822022-10-0303 October 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 3 Project stage: Response to RAI ML22336A1352022-12-0101 December 2022 Attachment 2 - HI-STORM FW FSAR Proposed Revision 10F, Changed Pages Project stage: Other ML22336A1322022-12-0101 December 2022 HI-STORM FW Amendment 7 RAI 5-2 Response Clarification Project stage: Request ML22336A1342022-12-0101 December 2022 Attachment 1 - Holtec Clarification of Response to Request for Additional Information 5-2 Project stage: Response to RAI ML22336A1332022-12-0101 December 2022 HI-STORM FW Amendment 7 RAI 5-2 Response Clarification Project stage: Other ML22326A3612022-12-0707 December 2022 Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Request for Additional Information Batch 4 Letter Project stage: RAI ML22326A3592022-12-0707 December 2022 Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Request for Additional Information Batch 4 Enclosure 1 Project stage: RAI ML22326A3582022-12-0707 December 2022 Amendment 7 to CoC No. 1032 for HI-STORM FW, Request for Additional Information Batch 4 Project stage: Request ML23006A2742023-01-0606 January 2023 Attachment 10: Affidavit of Kimberly Manzione Pursuant to 10 CFR 2.390 Project stage: Other ML23006A2632023-01-0606 January 2023 International HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 4 Project stage: Request ML23006A2702023-01-0606 January 2023 Attachment 6: HI-STORM FW FSAR Proposed Revision 10G, Changed Pages (Non-Proprietary) Project stage: Other ML23006A2682023-01-0606 January 2023 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance Appendix B, Changed Pages (Non-Proprietary) Project stage: Other ML23006A2672023-01-0606 January 2023 Attachment 3: HI-STORM FW Amendment 7 Certificate of Compliance Appendix a, Changed Pages (Non-Proprietary) Project stage: Other ML23006A2662023-01-0606 January 2023 Attachment 2: HI-STORM FW Amendment 7 RAI Responses Part 4 (Non-Proprietary) Project stage: Other ML23006A2642023-01-0606 January 2023 International HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 4 Project stage: Response to RAI ML23074A1012023-03-23023 March 2023 Amendment 7 to CoC No. 1032 for HI-STORM FW, RAI Batch 5 Project stage: Request ML23074A1022023-03-23023 March 2023 Letter, Amendment No. 7 to CoC No. 1032 for the HI-STORM_RAI Project stage: Other ML23096A3012023-04-0606 April 2023 International - Schedule for Responses to HI-STORM FW Amendment 7 Requests for Additional Information Part 5 Project stage: Other ML23128A3072023-05-0808 May 2023 Attachment 4: HI-STORM FW FSAR Proposed Revision 10H, Changed Pages (non-proprietary) Project stage: Other ML23128A3032023-05-0808 May 2023 International - HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 5 Project stage: Response to RAI 2022-12-07 |
ML23096A301 | |
Person / Time | |
---|---|
Site: | 07201032 |
Issue date: | 04/06/2023 |
From: | Elisio D Holtec |
To: | Yen-Ju Chen Office of Nuclear Material Safety and Safeguards, Document Control Desk |
References | |
EPID L-2021-LLA-0053, 5018103 | |
Download: ML23096A301 (2) | |
Similar Documents at 07201032 | |
---|---|
Category:Letter
MONTHYEARML24016A1902024-01-30030 January 2024
[Table view]International, Inc. - Notice of Violation; the U.S. Nuclear Regulatory Commission Inspection Report 07201014/2022201 ML24018A1992024-01-18018 January 2024 International, Administrative Change to HI-2200343-A ML23361A1622024-01-0404 January 2024 Application for HI-STORM Flood/Wind Multipurpose Storage System, Amendment No. 9 - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Closure ML23355A0812023-12-21021 December 2023 International - Withdrawal of HI-STORM FW Multipurpose Canister Storage System Amendment 9 ML23321A2462023-11-17017 November 2023 HI-STORM FW Amendment 7 RAI Response Clarifications (Part 3) ML23289A2132023-10-16016 October 2023 International - Schedule for Responses to HI-STORM FW Amendment 9 Requests for Additional Information ML23229A5172023-10-0404 October 2023 Amendment No. 9 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Request for Additional Information ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) ML23145A1752023-09-12012 September 2023 NRC Choice Letter to Holtec International with Attached Safety Inspection Report, IR 72-1014/2022-201, December 12-15, 2022, Inspection of Holtec International in Camden, New Jersey (Docket Nos.: 72-1014, 72-1032) ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel ML23227A2492023-08-15015 August 2023 International, HI-STORM FW Amendment 7 RAI 3-10 Response Clarification Call Action Items ML23192A0322023-07-11011 July 2023 International, HI-STORM FW Amendment 7 RAI Responses Part 5 Clarification Corrected Attachments 4 and 5 ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23184A1392023-07-0303 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-295, -296, -297) ML23181A1932023-06-30030 June 2023 International HI-STORM FW Amendment 7 RAI Responses Part 5 Clarification Call Action Items ML23163A1782023-06-12012 June 2023 Registration of Use of Cask to Store Spent Fuel (MPC-292, -293, -294) ML23128A3032023-05-0808 May 2023 International - HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 5 ML23096A3012023-04-0606 April 2023 International - Schedule for Responses to HI-STORM FW Amendment 7 Requests for Additional Information Part 5 ML23074A1022023-03-23023 March 2023 Letter, Amendment No. 7 to CoC No. 1032 for the HI-STORM_RAI ML23072A4272023-03-13013 March 2023 International, HI-STORM FW Multipurpose Canister Storage System Amendment 9 Obs Responses ML23041A4662023-02-15015 February 2023 Amendment No. 6 to Certificate of Compliance No. 1032 for the Holtec International Storage Module (Hi-Storm) Flood and Wind (FW) Multipurpose Canister (MPC) Storage System (Docket No. 72-1032, CAC No. 001028, EPID: L-2019-LLA-0231) ML23025A3712023-02-10010 February 2023 Acceptance Review of Request for Amendment 9 to Certificate of Compliance No. 1032 for HI-STORM Flood/Wind Multipurpose Canister Storage System ML22300A1512023-02-0303 February 2023 Congressional Letters - Holtec International HI-STORM Flood - Wind Multipurpose Canister Storage System, Certificate of Compliance No. 1032, Amendment No.6 ML23006A2642023-01-0606 January 2023 International HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 4 L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration ML22326A3612022-12-0707 December 2022 Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Request for Additional Information Batch 4 Letter ML22336A1332022-12-0101 December 2022 HI-STORM FW Amendment 7 RAI 5-2 Response Clarification PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 ML22290A1472022-11-0808 November 2022 Approval of Holtec International Request Withholding Information from Public Disclosure of the Application for Holtec HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 6 (Docket No. 72-1032) ML22276A2822022-10-0303 October 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 3 ML22265A1732022-09-22022 September 2022 Registration of Use of Casks to Store Spent Fuel ML22258A2512022-09-15015 September 2022 International, HI-STORM FW Amendment 7 RAI Responses Part 1 Clarification Call Action Items ML22242A2202022-09-0606 September 2022 Amendment No. 8 to Certificate of Compliance No. 1032 for the HI-STORM FW System Transmittal Letter ML22216A0782022-08-0404 August 2022 Request for Exemption from Various 10 CFR Part 72 Regulations Resulting from Non-Destruction-Examination Compliance ML22210A1462022-07-29029 July 2022 HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 2 ML22206A1772022-07-25025 July 2022 Registration of Use of Cask to Store Spent Fuel (MPC-240, -241, -242, -243) ML22199A3052022-07-18018 July 2022 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML22194A9542022-07-13013 July 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 1 - Additional Supporting Documents ML22192A2162022-07-11011 July 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part I ML22189A0382022-07-0808 July 2022 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML22172A1932022-06-30030 June 2022 Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Request for Additional Information Batch 2 ML22180A1392022-06-29029 June 2022 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML22175A1092022-06-24024 June 2022 Registration of Use of Cask to Store Spent Fuel (MPC-211, -212, -213) NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NMP1L3465, Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications2022-06-17017 June 2022 Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications ML22157A4702022-06-0606 June 2022 Registration of Use of Cask to Store Spent Fuel (MPC-0208, -209, -210) ML22151A1822022-05-31031 May 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2024-01-04 |
Text
Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 April 6, 2023 Yen-Ju Chen, Sr. Project Manager Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 CAC No. 001028, EPID No. L-2021-LLA-0053
Subject:
Schedule for Responses to HI-STORM FW Amd. 7 Requests for Additional Information Part 5
Reference:
[1] Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Request for Additional Information Batch 5, letter from Y. Chen (NRC) to D. Elisio (Holtec) dated March 23, 2023.
Dear Ms. Chen:
By letter dated March 23, 2023 [1], the NRC staff sent Requests for Additional Information (Part
- 5) to support review of Amendment 7 for the HI-STORM FW Certificate of Compliance No. 1032 and requested that Holtec provide this information by April 23, 2023.
As there is overlap between these RAIs and requests for information related to the ongoing CBS 72.48 work, Holtec plans to submit responses to the RAIs by May 8, 2023. This extra time should help ensure Holtec can incorporate any additional feedback and/or direction received over the next weeks as more information is provided to the NRC related to the CBS 72.48.
If you have any questions, please contact me at 856-797-0900 ext. 3326.
Document ID 5018103 Page 1 of 2
Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Sincerely, Denise Elisio Licensing Engineer, Holtec International cc:(via email)
Kimberly Manzione (Holtec)
Document ID 5018103 Page 2 of 2