MAR 1l11988
.
,
Docket No. 50-293 Boston. Edison Company ATTN: Mr. Ralph G. Bird Senior Vice President - Nuclear 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
Sub.iect: Region I Inspection Report No. 50-293/87-57 This refers to the routine safety inspection (50-293/87-57) conducted by
'  Messrs. C. Warren, J. Lye.sh and T. Kim of this office on December 7,1987 to January 19, 1988:at the Pilgrim Nuclear Power Station, Plymouth, Massachusett Areas examined during this inspection aredescribed in -the NRC Region I Inspection Report. which is enclosed with this lette Based on the resuits of this inspection, it appears that one of your activities related to high radiation area access control was not conducted in full com-pliance with NRC requirements, as set forth in the Notice of Violation enclosed herewith as Appendix A. - The problem was identified by your staff. However, a Notice of Violation is being issued because effective corrective actions apparently liave not been taken for previous problems with high radiation area-access control. In addition to following the irstructions of Appendix A in'
preparing the required response, please include chose actions you intend to take to preclude recurrence of this problem by insuring that your corrective actions are effective and' lastin Two significant integrated plant tests were successfully executed during-the inspection period. Preplanning and control of these activities was generally stron We also observed that increased management involvement in assuring effective problem followup has resulted in substantial improvement. Equipment failures identified as a result of an unanticipated safety system actuation however, indicate the.need for stronger post-work test practices and a thorough power ascension test progra The response directed by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
 
L OFFICIAL RECORD COPY IR PILGRIM 87-57 - 0001. ,  03/11/88 8803210184 880311      C A PDR ADOCK 05000293    .(/
Q  DCD    I&
        '
_ , . _ _ , , . _ ..,. . . _ _ _ - . _ . . -
 
________ _ -__ _ _ _______ _ -_
    '
i
, s    ,
t, ,- ..
r
  ;
Boston Edison Compan MAR 111988
..
Your cooperation with us in this matter is appreciate
 
Sincerely,
.
dgginal Stcncd I?2
'
'
<
Samuel J.' Collins, Deputy Director Division of Reactor Projects Enclosures: Appendix A, Notice of Violation NRC Region I Inspection Report No. 50-293/87-57-cc w/encis:
R. Barrett, riuclear Operations Manager B.-McIntyre, Chairman, Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Plymouth Civil Defense Director J. Keyes, Boston Edison Regulatory Affairs and Programs E. Robinson, Nuclear Information Manager R. Swanson, Nuclear Engineering Department Manager    >
,  The Honorable Edward J. Markey      *
'
The Honorable Edward P. Kirby The Honorable Peter V. Forman S. Pollard, Secretary of Energy Resources P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts R. Shimshak, MASSPIRG-Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts (2)
bec w/encls:
Region I Docket Room (with concurrences)
W. Russell, RA
  .M. Perkins, ORMA (w/o encis)
R. Blough, DRP L. Doerflein, ORP R. Bores, ORSS S. Collins, DRP C. Anderson, DRS D. Mcdonald, LPM, NRR
  .
T. Chandrasekaran, SPLB, NRR M.~ Callahan, OCA J. Nickerson 0FFICIAL RECORD COPY IR PILGRIM 87-57 - 0002. /11/88
_  u, . . - , _ _ , _ _ , , _ . . . _ , . , _ . - _
 
..
.
'
,,'
. .
..
Boston Edison Company  3 ER 111988
.
d RI:DRP RI:DRP RI:DRP h,R1:DRP i DRP ((CWarren/mjd s  RBlough MJWiggins v SCollins Kane
' ~ 3/ /// 88  3/w /88 3/0/88 3/\\/88
'V(g\c . $3/3/88 0FFICIAL RECORD COPY IR PILGRIM 87-57 - 0003. ) y T. '% q i e g /ff Sp  03/05/88
  's, Vdqh
      ,
}}
}}

Latest revision as of 01:18, 17 December 2020

Forwards Safety Insp Rept 50-293/87-57 on 871207-880119 & Notice of Violation.Equipment Failures Indicate Need for Stronger post-work Test Practices & Thorough Power Ascension Test Program
ML20195B175
Person / Time
Site: Pilgrim
Issue date: 03/11/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20153A853 List:
References
NUDOCS 8803210184
Download: ML20195B175 (3)


Text

. . ,

., .u - >

. s .

. . . .

' '

MAR 1l11988

.

,

Docket No. 50-293 Boston. Edison Company ATTN: Mr. Ralph G. Bird Senior Vice President - Nuclear 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:

Sub.iect: Region I Inspection Report No. 50-293/87-57 This refers to the routine safety inspection (50-293/87-57) conducted by

' Messrs. C. Warren, J. Lye.sh and T. Kim of this office on December 7,1987 to January 19, 1988:at the Pilgrim Nuclear Power Station, Plymouth, Massachusett Areas examined during this inspection aredescribed in -the NRC Region I Inspection Report. which is enclosed with this lette Based on the resuits of this inspection, it appears that one of your activities related to high radiation area access control was not conducted in full com-pliance with NRC requirements, as set forth in the Notice of Violation enclosed herewith as Appendix A. - The problem was identified by your staff. However, a Notice of Violation is being issued because effective corrective actions apparently liave not been taken for previous problems with high radiation area-access control. In addition to following the irstructions of Appendix A in'

preparing the required response, please include chose actions you intend to take to preclude recurrence of this problem by insuring that your corrective actions are effective and' lastin Two significant integrated plant tests were successfully executed during-the inspection period. Preplanning and control of these activities was generally stron We also observed that increased management involvement in assuring effective problem followup has resulted in substantial improvement. Equipment failures identified as a result of an unanticipated safety system actuation however, indicate the.need for stronger post-work test practices and a thorough power ascension test progra The response directed by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

L OFFICIAL RECORD COPY IR PILGRIM 87-57 - 0001. , 03/11/88 8803210184 880311 C A PDR ADOCK 05000293 .(/

Q DCD I&

'

_ , . _ _ , , . _ ..,. . . _ _ _ - . _ . . -

________ _ -__ _ _ _______ _ -_

'

i

, s ,

t, ,- ..

r

Boston Edison Compan MAR 111988

..

Your cooperation with us in this matter is appreciate

Sincerely,

.

dgginal Stcncd I?2

'

'

<

Samuel J.' Collins, Deputy Director Division of Reactor Projects Enclosures: Appendix A, Notice of Violation NRC Region I Inspection Report No. 50-293/87-57-cc w/encis:

R. Barrett, riuclear Operations Manager B.-McIntyre, Chairman, Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Plymouth Civil Defense Director J. Keyes, Boston Edison Regulatory Affairs and Programs E. Robinson, Nuclear Information Manager R. Swanson, Nuclear Engineering Department Manager >

, The Honorable Edward J. Markey *

'

The Honorable Edward P. Kirby The Honorable Peter V. Forman S. Pollard, Secretary of Energy Resources P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts R. Shimshak, MASSPIRG-Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Massachusetts (2)

bec w/encls:

Region I Docket Room (with concurrences)

W. Russell, RA

.M. Perkins, ORMA (w/o encis)

R. Blough, DRP L. Doerflein, ORP R. Bores, ORSS S. Collins, DRP C. Anderson, DRS D. Mcdonald, LPM, NRR

.

T. Chandrasekaran, SPLB, NRR M.~ Callahan, OCA J. Nickerson 0FFICIAL RECORD COPY IR PILGRIM 87-57 - 0002. /11/88

_ u, . . - , _ _ , _ _ , , _ . . . _ , . , _ . - _

..

.

'

,,'

. .

..

Boston Edison Company 3 ER 111988

.

d RI:DRP RI:DRP RI:DRP h,R1:DRP i DRP ((CWarren/mjd s RBlough MJWiggins v SCollins Kane

' ~ 3/ /// 88 3/w /88 3/0/88 3/\\/88

'V(g\c . $3/3/88 0FFICIAL RECORD COPY IR PILGRIM 87-57 - 0003. ) y T. '% q i e g /ff Sp 03/05/88

's, Vdqh

,