Forwards SE of 980826 Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Sys Piping for Plant
ML20206M189
Person / Time
Site: Pilgrim
Issue date: 05/11/1999
From: Clifford J
NRC (Affiliation Not Assigned)
To: Ted Sullivan
BOSTON EDISON CO.
Shared Package
ML20206M192 List:
References
GL-90-05, GL-90-5, TAC-MA3507, NUDOCS 9905140211
Download: ML20206M189 (4)


Text

g Mr. Theodore A. Sulliv:n.

May i1, 1999.

. Vice President Nucle:r and Station Director Boston Edison Company 3,

Pilgrim Nuclear Power Station -

RFD #1 Rocky Hill Road Plymouth, MA 02360

SUBJECT:

SAFETY EVALUATION OF REQUEST TO USE THE GUIDANCE OF GENERIC LETTER 90-05 TO REPAIR FLAWS IN AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) CLASS 3 SALT SERVICE WATER SYSTEM PIPING FOR PILGRIM NUCLEAR POWER STATION (TAC No. MA3507)

Dear Mr. Sullivan:

By [[letter::05000293/LER-1998-019, :on 980727,declared Standby Liquid Control Subsystem B Inoperable.Caused by Leakage Through Pipe Fitting on Pressure Gauge PI-1160B.Removed Subject Gauge, Cleaned Pipe Threads & Reinstalled Gauge|letter dated August 26,1998]][the Boston Edison Company (BECo/ licensee) requested approval to repair flaws in ASME Code Class 3 Salt Service Water System piping at the Pilgrim Nuclear Power Station in accordance with the guidance provided in Generic Letter 90-05. The staff finds that performance of an immediate Code repair during plant operation is impractical and would have constituted an undue burden (create undue hardship) upon the f

licensee since the repair would have necessitated a unit shutdown. Shutting the unit down is not in the best interest of plant safety, given the magnitude of the flaws and the licensee's -

alternative program. The staff, therefore, grants the request for relief for performing the Code repair pursuant to 10 CFR 50.55a(g)(6)(i), and finds that implementation of the licensee's altamative program is authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public interest, giving due consideration to the burden upon the licensee and facility that could have resulted if the Code requirements were imposed on the facility. The alternative program is authorized.

The enclosure contains the staff's safety evaluation and conclusions concerning this request.

This action closes TAC No. MA3507.

Sincerely, ORIGINAL SIGNED BY:

James W. Clifford, Chief, Section 2 ngn Project Directorate 1

=,4 9905140211'990$it Division of Licensing Project Management PDR ADOCK 05000293 Office of Nuclear Reactor Regulation P

PDR J

Docket No. 50-293

\\

'd

Enclosure:

Safety Evaluation cc w/ encl: See next page U

\\

'.T. Clark ACRS

' PUBLIC -

A. Wang A. Blough PDI-2 Reading G. Hill (2)

G. Shear J. Zwolinski/S. Black -

R. Norsworthy (email SE to RCN)

J. Clifford

.OGC DOCUMENT NAME: A:\\SEMA350I.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment /enclosurej "E" = Copy l

' with attachment / enclosure "N" = No copy rM

/1 ;.

j IE PDI-2/LA ) J /)

lE OGC (C P l

P01 il/$7 l

dd{jj MD l

J OrricE pol 2/pm u s.

wME AWeng/rst &

TClark '// V

/f/4 M W n#

.lCll Word NChman/ m./ )

DATE OQ ll /99 06/dd/99 9'

/"? 68/A/

O./ d /99 4-/M A / W /

i f

5 Official Record Copy

)

4

G UQuqk-UNITED STATES

~ *

[

j NUCLEAR REGULATORY COMMISSION o

2 WASHINGTON, D.C. 30606-4001 May 11, 1999

. Mr. Theodore A. Sullivan Vice President Nuclear and Station Director Boston Edison Company Pilgrim Nuclear Power Station

~

RFD #1. Rocky Hill Road -

Plymouth, MA 02360

SUBJECT:

SAFETY EVALUATION OF REQUEST TO USE THE GUIDANCE OF GENERIC LETTER 90-05 TO REPAIR FLAWS IN AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) CLASS 3 SALT SERVICE WATER SYSTEM PIPING FOR PILGRIM NUCLEAR POWER STATION (TAC No, MA3507)

Dear Mr. Sullivan:

By [[letter::05000293/LER-1998-019, :on 980727,declared Standby Liquid Control Subsystem B Inoperable.Caused by Leakage Through Pipe Fitting on Pressure Gauge PI-1160B.Removed Subject Gauge, Cleaned Pipe Threads & Reinstalled Gauge|letter dated August 26,1998]], the Boston Edison Company (BECo/ licensee) requested approval to repair flaws in ASME Code Class 3 Salt Service Water System piping at the Pilgrim Nuclear Power Station in accordance with the guidance provided in Generic Letter 90-05. The staff finds that performance of an immediate Code repair during plant operation is impractical and would have constituted an undue burden (create undue hardship) upon the licensee since the repair would have necessitated a unit shutdown. Shutting the unit down is not in the best interest of plant safety, given the magnitude of the flaws and the licensee's altemative program. The staff, therefore, grants the request for relief for performing the Code repair pursuant to 10 CFR 50.55a(g)(6)(i), and finds that implementation of the licensee's attemative program is authorized by law and will not endanger life or property or the common oefense and security, and is otherwise in the public interest, giving due consideration to the burden upon the licensee and facility that could have resulted if the Code requirements were imposed on the facility. The altemative program is authorized.

The enclosure contains the staff's safety evaluation and conclusions concerning this request.

This action closes TAC No. MA3507.

Sincerely, M

J mes W. Clifford, Chief, Section 2 Project Directorate i Division of Licensing Project Manag' ament Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Safety Evaluation cc w/ encl: See next page i

l I

Pilgrim Nuclear Power St ti:n w

Mr. Ron Ledgett Mr. Jack Alexander Executive Vice President Manager, Reg. Relations and Quality 800 Boyleston Street Assurance Boston, MA 02199 Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Resident inspector Plymouth, MA 02360 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Mr. David F. Tarantino i

Post Office Box 867 Nuclear Information Manager Plymouth, MA 02360 Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road Chairman, Board of Selectmen Plymouth, MA 02360 11 Uncoln Street Plymouth, MA 02360 Ms. Kathleen M. O'Toole Secretary of Public Safety i

Chairman, Duxbury Board of Selectmen Executive Office of Public Safety Town Hall One Ashburton Place 878 Tremont Street Boston, MA 02108 Duxt>ury, MA 02332 Mr. Peter LaPorte, Director Office of the Commissioner -

Attn: James Muckerheide Massachusetts Department of Massachusetts Emergency Management i

Environmental Protection Agency l

One Winter Street 400 Worcester Road Boston, MA 02108 P.O. Box 1496 Framingham, MA 01701-0317 Office of the Attomey General One Ashburton Place Chairman, Citizens Urging 20th Floor Responsible Energy Boston, MA 02108 P.O. Box 2621 Duxbury, MA 02331 Mr. Robert M. HalM sy, Director Radiation Contrc: f2; ram Citizens at Risk Massachusetts Department of P.O. Box 3803 Public Health Plymouth, MA 02361 305 South Street Boston, MA 02130 W.S. Stowe, Esquire Boston Edison Company a

Regional Administrator, Region 1 800 Boyleston St.,36th Floor U. S. Nuclear Regulatory Commission Boston, MA 02199

{

475 Allendale Road i

King of Prussia, PA 19406 Chairman Nuclear Matters Committee Ms. Jane Fleming Town Hall 8 Oceanwood Drive 11 Lincoln Street j

Duxbury, MA 0233 Plymouth, MA 02360 l

1 Mr. James Keyes -

Mr. William D. Meinert Acting Licensing Division Manager Nuclear Engineer Boston Edison Company Massachusetts Municipal Wholesale 600 Rocky Hill Road Electric Company Plymouth, MA- 02360-5599 P.O. Box 426 I

Ludlow, MA 01056-0426 l

1

E-

',4 Ms. Mary Lampert, D! rector Massschusetts Citizens for Safe Energy 148 Washington Street I

Duxbury, MA 02332 S

l l