Forwards SAIC-89/1121, In-Progress Audit Rept of Dcrdr at Boston Edison Co Pilgrim Nuclear Power Station & SAIC-89-1119, In-Progress Audit Rept for Boston Edison Co Pilgrim Nuclear Poser Station Spds
ML20245H837
Person / Time
Site: Pilgrim
Issue date: 04/26/1989
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20245G740 List:
References
TASK-1.D.2, TASK-TM GL-89-06, GL-89-6, NUDOCS 8905030547
Download: ML20245H837 (2)


Text

-

April 26,1989 I Dock;t N,0. 50-293 Mr. Ralph G. Bird Senior Vice President - Nuclear Boston Edison Company

. Pilgrim Nuclear Power Station RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Bird:

SUBJECT:

IN-PROGRESS AUDIT REPORTS OF DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR) AND SAFETY PARAMETER DISPLAY SYSTEM (SPDS) -

PILGRIH NUCLEAR POWER STATION

Reference:

TAC Number 59239 On March 20-23, 1989, members of the Human Factors Assessment Branch (HFAB),

and contractor personnel from Science Applications International Corporation (SAIC), accompanied by the NRC Project Manager for Pilgrim, conducted an in-progress audit of the Pilgrim Nuclear Generating Station DCRDR and SPDS programs. An exit interview was conducted on March 23, 1989, with personnel from the Pilgrim Station and Boston Edison Company in attendance, at which time the audit findings were presented.

Enclosed are the audit agenda; a list of entrance and exit meeting attendees; and two reports which document the findings of the team. The staff, as part of the audit team, agrees with the results and conclusions presented in the contractor's audit reports. q Subsequent to the in-progress audit, the NRC staff has issued Generic Letter (GL) No.89-06, Task Action Plan Item I.D.2 Safety Parameter Display System, dated April 12, 1989, to all licensees, applicants and holders of construction permits in accordance with the provisions of 10 CFR 50.54 (f). GL89-06 requires a response within 90 days of the date of the GL. The portion of the enclosure related to the SPDS should be of assistance in responding to the GL.

]

Sincerely, OriginalSigned by; j t

Daniel G. Mcdonald, Senior Project Manager i co Project Directorate I-3  !

M Division of Reactor Projects I/II j 08' oo

Enclosure:

l l

@ As stated Qd cc w/ encl: See next page )

DISTRIBUTION: WikstWile NRC& Local PORs, PDI-3 r/f, MRushbrook, DMcDonald, O BGrimes,EJordan,ACRS(10),RWessman,0GC,REckenrode,JBongarra,JWiggins,Rgn.I gs SVarga, BBoger 3 ,

coa.o.

S- PDI '

M DIR/P)l-3

, MRyshbrook DMcDonald:mw 4/Qy89 RWessman @f l

4/ 89 41%/89 ,

~

\

I Mr. Ralph G. Bird Boston Edison ~ Pilgrim Nuclear Power Station cc:

Mr. K. L. Highfill Mr. Ralph G. Bird Station Director Senior Vice President - Nuclear Pilgrim Nuclear Power. Station Boston Edison Company RFD #1 Rocky Hill Road. Pilgrim Nuclear Power Station Plymouth, Massachusetts 02360 RFD#1, Rocky Hill Road  !

Plymouth, Massachusetts 02360 Resident Inspector's,0ffice Mr. Richard N. Swanson, Manager U. S. Nuclear Regulatory Commission Nuclear Engineering Department -

Post Office Box 867 Boston Edison Company Plymouth, Massachusetts 02360 25 Braintree Hill Park Braintree, Massachusetts 02184 Chairman, Board of Selectmen 11 Lincoln Street .

Ms. Elaine D. Robinson Plymouth, Massachusetts 02360 Nuclear Information Manager Pilgrim Nuclear Power Station Office of the Commissioner RFD #1, Rocky Hill Road Massachusetts Department of Plymouth , . Massachusetts 02360 Environmental Quality Engineering One Winter Street Charles V. Barry Boston, Massachusetts 02108 Secretary of Public Safety Executive Office of Public Safety Office of the Attorney General One Ashburton Place One Ashburton Place Boston, Massachusetts 02108 20th Floor Boston, Massachusetts 02108 4

Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Region I {

U. S. Nuclear Regulatory Commission 1 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Regulatory Affairs and Programs Group Leader Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184