Responds to Ltr Sent to Chairman SA Jackson on 981028 Re Concern That NRC Will Not Perform Environ Assessment in Connection with Consideration of Approval of Transfer of License for Plants to Permit Sale
ML20197H852
Person / Time
Site: Pilgrim
Issue date: 12/09/1998
From: Travers W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Murray T
MASSACHUSETTS, COMMONWEALTH OF
Shared Package
ML20197H855 List:
References
NUDOCS 9812140183
Download: ML20197H852 (9)


Text

'

GQln s

g

[aur\ 4 UNITED STATES l

+

g j e

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055F0001

{[jg y3

\ ,,,, /

4 December 9, 1998 The Honorable Therese Murray i Massachusetts Senate State House i Boston, MA 02133-1053

Dear Ms. Murray:

I am responding to the letter you sent Chairman Shirley Ann Jackson on October 28,1998, in which you expressed concern that the NRC will not perform an environmental assessment in 1 connection with its consideration of approval of the transfer of the license for the Pilgrim Nuclear Power Station to permit its sale. The NRC has completed numerous environmental assessments related to license transfers. These assessments have uniformly demenstrated that there are no significant environmental effects from license transfers. Accordingly, the NRC t has amended its regulations to provide for a categorical exclusion that eliminates the need to perform individual environmental assessments in each transfer case.

The licensee at the time of decommissioning is fully responsible for decontamination and decommissioning of the site. Licensees determine how much sampling and analysis are needed to adequately characterize the site on the basis of available historical onsite radiation survey records and known liistory of site uses, regardless of who may have owned the plant.

This initial site charactenzation study is performed for the purpose of decommissioning planning and estimating decommissioning costs.

After decommissioning activities are completed, the licensee must furnish additional documentation of radiological evaluations to demonstrate compliance with the radiological criteria contained in "Subpart E- Radiological Criteria for License Termination" of 10 CFR Part

20. The licensee's radiological environmental monitoring program is maintained in effect // J throughout the decommissioning process so that the potential environmental impacts of //

decommissioning activities are monitored. The NRC periodically inspects the licensee's i decommissioning program during the decommissioning process and reviews the licensee's final l radiological survey data. The NRC can perform an independent radiological review of the i survey data if one is needed. The NRC can also, if needed, perform an independent radiological survey of the licensee's site to verity the licensee's compliance with regulatory f)fd/

l l

requirements. The NRC will terminate the license only when it is satisfied that the licensee's )

site is remediated to the levels specified in the regulations. j i

l 9012140183 981209 PDR P

ADOCK 05000293 PM f).p>/)

j

i

=

< l i t i ,

I i T. Murray '

J Thank you for sharing your concerns with the NRC. If you should have any further questions,  !

please contact me. i Sincerely, j i

l l

0 .

William D ravers i 2

Executive Director t 4 ,

for Operations  !

l cc: See next page i

J.

t t

4 i

4 e 4

?

t l

r b

1 r

5 e

Bost:n Edison Company Pilgrim Nuclair Pow 2r Station cc:

, Mr. Theodore A. Sullivan Mr. Jack F. Alexander Vice President Nuclear and Station Nuclear Assessment Group Manager  ;

Director Pilgrim Nuclear Power Station Boston Edison Company 600 Rocky Hill Road Pilgrim Nuclear Power Station Plymouth, MA 02360-5599 600 Rocky Hill Road Plymouth, MA 02360-5599 Mr. David F. Tarantino Nuclear Information Manager Resident inspector Pilgrim Nuclear Power Station U. S. Nuclear Regulatory Commission 600 Rocky Hill Road Pilgrim Nuclear Power Station Plymouth, MA 02360-5599 Post Office Box 867 Plymouth, MA 02360-5599 Ms. Kathleen M. O'Toole Secretary of Public Safety Chairman, Board of Selectmen Executive Office of Public Safety 11 Lincoln Street One Ashburton Place Plymouth, MA 02360 Boston, MA 02108 Chairman, Duxbury Board of Selectmen Mr. Peter LaPorte, Director Town Hall Attn: James Muckerheide 878 Tremont Street Massachusetts Emergency Management Duxbury, MA 02332 Agency 400 Worcester Road Office of the Commissioner P.O. Box 1496 Massachusetts Department of Framingham, MA 01701-0317 Environmental Protection One Winter Street Chairman, Citizens Urging Boston, MA 02108 l Responsible Energy ,

P.O. Box 2621 j Office of the Attomey General Duxbury, MA 02331 l One Ashburton Place l 20th Floor Citizens at Risk Boston, MA 02108 P.O. Box 3803 Plymouth, MA 02361 Mr. Robert M. Hallisey, Director Radiation Control Program John M. Fulton Massachusetts Department of Assistant General Counsel Public Health 800 Boylston St., P-361 305 South Street Boston, MA 02199 Boston, MA 02130 Chairman Regional Administrator, Region l Nuclear Matters Committee U. S. Nuclear Regulatory Commission Town Hall 475 Allendale Road 11 Lincoln Street King of Prussia, PA 19406 Plymouth, MA 02360 Ms. Jane Fleming Mr. William D. Meinert  ;

8 Oceanwood Drive Nuclear Engineer l Duxbury, MA 0233 Massachusetts Municipal Wholesale Electric Company Mr. C. Stephen Brennion P.O. Box 426 Regulatory Affairs Department Manager Ludlow, MA 01056-0426 Boston Edison Company 600 Rocky Hill Road l

Plymouth, MA 02360-5599 I o  !

t i' _,_

2  !

i 4

l y Mr. Ron Ledgett j Executive Vice President i, 1

- Boston Edison Co. I f

800 Boyleston Street

{

Boston, MA 02199

i r i k

i l

e i

i f

i

-i i

f T. Murray Thank you for sharing your concems with the NRC. If you should have any further questions, please contact me.

Sincerely, -

Original Signed ty YMak J. Mirngig e William D. Travers Executive Director for Operations cc: See next page This correspondence addresses policy issues previously resolved by the Commission, transmit factual information, or restates Commission Policy. f DOCUMENT NAME: G:\ PILGRIM \MURRAY.LET *SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy OFFICE PDI-3/PM l PDI-3/LA , , , l f* PDI-3/D , lhl TECM ED. ] DD:DRPE:W l NAME AWang TClark C M9 _ BCature* JZwolin6 V DATE / /98 f/ / 2 f /98 // / #d98 10/29/98 i/ / 3 4 /98 e un / /L  ;

0FFICE ADPR:NRR(A) @ k D:NRR p p} l/_ _aM_f_FI l BC:PERB* l OCA 1 M {

NAME B8oger $ E9t tins l ' " h/// gMA CLMitter DRathbun  ;

DATE 11/Jt498 7 V/ 3 /98 7 V2 / L/ /98 11/25/98 1?/ /4R  !

. IFF1ClAL RECOID COPY PP '

. _ - .. .-- . - . . . ~ . . . _ .

I r ,

DISTRIBUTION l

Docket File (50-293) w/inc.  ;

PUBLIC (w/inc.)

EDO #G19980669 PDI-3 r/f w/inc. i EDO Reading  !

W. Travers '

H. Thompson .

A. Thadani I P. Norry I

-J. Blaha S. Bums, OGC M. Miller, R1 i S. Collins /F_ Miraglia i B. Boger J. Zwolinski {:

l B. Sheron '

J. Roe R. Zimmerman C. Norsworthy (e-mail RC'N) '

l OGC '

OPA l OCA i-SECY # CRC-98-1031 l NRR Mail Room (EDO #G19980669) '

N. Olson A. Wang w/inc. ,

T. Clark I l C. Hehl, Ri i

i j

l 1

{

1 i-

l

/

f i

T. Murray l 4

- Thank you for sharing your concems with the NRC. If you should have any further questions,

- please contact me.'

1 Sincerely,  !

I i

William D. Trpvers l rector  !

Executive

< for Ope D)tions l

, cc: See next page This correspondence addresses policyissues . viously resolved by the Commission, transmit factual information, or restates Commission P licy..

DOCUMENT NAME: G:\ PILGRIM \MURRAY.LET To receive a copy of this document, indic e in the box: "C" - Copy without-attachment / enclosure "E" - Copy with at'tachment/ enclosure "N" - No copy 0FFICE PDI 3/PM - l PDI 3/LA a h , / l %. PyrT/D - lM TECH ED. DD:DRPE:(A) (_

NAME AWang bT,9 TClark d h U / W/ BCature* JZwotinski DATE il / 2 1 /98 jl / 2 4 /98 / J / / / L:f/98 10/29/98 11/03/98 Off!CE ADPR:NRR(A) 1 0 NRR /

! l EDO l

  • See previous concurrence

_PERB m m IF l NAME BBoger Scottins / WTrevers J C,Mi11er X 4 L DATE 11/- /98 11/ /f8 / /98 /r "// / 2f/ 98 OfflCIAL RECORD COPY (/

y" l

~

~

'?

ACTION EDO Principal Correspondence Control nwa 5 / 7f%

FROM DUE:

( h  ?

98 EDO CONTROL: G19980669 DOC DT: 10/28/98 L FINAL REPLY:

Sanctor Therese Murray Manacchusetts Senate //// L TO Chairman Jackson -

,FOR SIGNATURE OF : ** GRN **

CRC NO: 98-1031 Travers, EDO DESCs ROUTING:

SALE OF THE PILGRIM NUCLEAR PLANT Travers DEDE Thompson Norry  ;

Blaha '

Burns '

DATE: 11/10/98 Miller, RI ASSIGNED TO: CONTACT:

NRR _

Collins SPECIAL INSTRUCTIONS OR REMARKS: , ,

fu agw o dbb .

g p : A mLw/.u m i mee ami>u: baantwahg w _

ACTION DUE TO NRR DIRECTOR'S 07~; :

w .

n +s,-

/l]d

i l

OFFICE OF THE SECRETARY c

1. CORRESPONDENCE CONTROL TICKET PAPER NUMBER: CRC-98-1031 LOGGING DATE: Nov 9 98 l ACTION OFFICE: EDO  !

AUTHOR: THERESE MURRAY ,

AFFILIATION: MASSACHUSETTS

-ADDRESSEE: CHAIRMAN JACKSON l

LETTER DATE: Oct 28 98 FILE CODE: IDR 5 PILGRIM

SUBJECT:

SALE OF THE PILGRIM NUCLEAR PLANT I I

t ACTION: Signature of EDO-DISTRIBUTION: CHAIRMAN, RF, SECY/ RAS-SPECIAL HANDLING: SECY TO ACK l CONSTITUENT:

NOTES:  :

AS I DATE TUE: Nov. W 98 l SIGNATURE: . DATE SIGNED:  ;

AFFILIATION:  ;

I

^

_ i I

l EDO -- G980669

. . _ . _ , . _ _ _ _ _ _ _ _ _ _ _ _