ML20058P047
| ML20058P047 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/09/1990 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bird R BOSTON EDISON CO. |
| Shared Package | |
| ML20058P051 | List: |
| References | |
| NUDOCS 9008160014 | |
| Download: ML20058P047 (2) | |
See also: IR 05000293/1990018
Text
.
,
. ,7 ,
-c
..
p.
.-
I
s
'
,
,
.-i
h
' AUG 0 91990
a
Docket No2 50-293L
I
-Boston Edison' Company m _
ATTN: .Mr. Raiph,G. Bird?
-- ,
,
.
Senior Vice President
< clear
P11 grim-Nuclear Power Station
- RFD #1zRocky= Hill Road'
q
'
' Plymouth,_Massachusettst::02360
iy
Gentlemen:
- I
,
,
s
Subj 2ct: -NRC Inspection Report _No. 50-293/90-18
l
LThis'-refers,to?the routine safety. inspection conducted by Mr.-R.-A.,McBrearty
,,
of this~ office on Julk 9-13,:1990 at- Pilg' rim Nuclear P.ower Station of
-)
. activities' authorized by NRC License No. DPR-35 and to.the discussions of'our
i
-
findings held by1Mr. McBrearty with Mr..'E.
S.. Kraft of your staff at the
>}
' conclusion of the inspection
->
i
Areas examined during this inspection are described in the.NRC Region:I.
Inspection Report-which is enclosed with'this letter. :Within these, areas, the
inspection consisted of selective examinations of procedures"and_ representative ~
' records,. interviews with personnel, and' observations'by.the inspector. We: note-
your efforts:to reduce > Cobalt bearing.materialf-in=the plant and encourage the
j
completion: of- these initiatives.
'
5
Within the scope of_ this inspection, no violations were observed.'
l
- !
1No reply to this letter.is required. Your cooperation with us in this matter
is' appreciated.
Sincerely,.
0-tc!nn nt;nda ny:
j
' Ja a <, uv ?. Der
Jacque_P. Durr, Chief
Engineering Branch
. Division'of Reactor Safety-
'Endlosure: NRC Region I Inspection Report No. 50-293/90-18
l
!
)
^F ICIAL RECORD COPY
IR PILG 90-18 - 0001.0.0
. 9008160014 900809
PDR3 'ADOCK 05000293
08/03/90-
lg\\
o.
ISOY ,
- L
. , .
,
)',4
AUG 0 91990i
.
.
i
Boston Edison Company-
2-
.
cc w/ encl. ,.
.
q
K.: Highfill',- Vice President,' Nuclear Operations -
i
R'.' Anderson, Plant Manager
_
'
'J. Dietrich,.-Licensing Division ManagerE
I
E. Robinson,: Nuclear Information Manageri
f
s
-R.- Swanson, Regulatory Affairs' Manager
'
-The Honorable l John F. Kerry:.
oThe Honorable Edward J._Markey=
.
- The Honorable Edward P. Kirby-
!
.The Honorable'-Peter V. Forman
i
- The Honorable Edward _M. Kennedy-
1
'The: Honorable-Lawrence R. Alexander.
f
~
'The Honorable.' Nicholas J. Costello' .
.
l
B. McIntyre, Chairman, Department of1Public Utilities
J
Chairman, Plymouth Board of Selectmen
j
'
Chairman,1Duxbury Board of Selectmen
'
~
,
Plymouth Civil Defense Director
-
R. Hallisey, Department ofLPublic-Health _,l Commonwealth of Massachusetts-
)
R. Adams,-Department'of Labor and-Industries, Commonwealth 1of Massachusetts
5
D. Tibbetts, Acting Massachusetts Secretary of' Energy Resources
Sarah Woodhouse, Legislative Assistant-
~
A. Nogee; MASSPIRG
J.LW. McCormack, FEMA Regional Administrator
-Public' Document Room (PDR)
Local Public Document Room (LPDR)= _ _
Nuclear Safety.Information Center (NSIC)
NRC Resident Inspector.
' Common,<ealth of, Massachusetts, SLO Designee
bec w/ encl:
Region I' Docket Room (with concurrences)
~
Management Assistant', DRMA (w/o encl)
(
-T. Martin, RA
-
R. Bellamy, DRSS.
!
J. Johnson,LDRP
.
J. Rogge,~DRP
J. Macdonald, SRI - Pilgrim-(with concurrences)
'
M.' Conner, SALP' Reports Only
K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports
J.'Caldwell~, ED0
R.' Wessman,'NRR
R. Eaton,iNRR
1RI:DRS
RIiDRS
RIiDRS
cB eart
cb
o id
.
Durr
07
/90
07/26/90
-03/6/90
i
,