Accepts Summary of QA Program Description Changes for 1989, Forwarded by
ML20246K509
Person / Time
Site: Pilgrim
Issue date: 08/24/1989
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
References
NUDOCS 8909050496
Download: ML20246K509 (2)


Text

p_ _ -- , - - - - ~ - - - - - - - ' - -

c--. -

i y4 #

p*.1 '

... 2,

(- y

,. r 3 ,

o f

AUG 2 41989 4

Docket No. 50-293

Boston Edison Company .
A,TTN: Mr. Ralph G. Bird' Senior Vice President.- Nuclear Pilgrim Nuclear Power _ Station RFD #1 Rocky. Hill Road- ,

Plymouth, Massachusetts' 02360-Gentlemen:

Subject:

.10;CFR 50.54 QUALITY ASSURANCE PROGRAM DESCRIPTION CHANGE REVIEW

Reference:

Letter BECo 89-091Ldated June 30, 1989, Ralph G. Bird to U' S. Nuclear Regulatory Commission,

Subject:

Annual Report' of Changes:to the Boston Edison Quality. Assurance Program Description Weh' ave received the referenced letter transmitting the Summary of QA Program-Description Changes (1989) of the Boston Edison Quality Assurance Program

~ Description. .The Region 1 staff has reviewed these submittals and found they.

'do not reduce your previous commitments to quality assurance and, therefore, Eare-acceptable.

The~ effectiveness of your Quality Assurance Program and procedure implementa-

-tion will continue to be the-subject of routine regional inspections.

If you have any questions concerning the a'oove, please call R. W. Winters on (215) 337-5244.

Sincerely, Original Signed Byi Clifford J. Anderson Jacque P. Durr, Chief Engineering Branch Division of Reactor Safety 0FFICIAL RECORD COPY 50-293 QA - 0001.0.0 ' '

08/24/89 8909050496 890824 IE'.01

_MM*i SE w - - - -

, . a,

~

.m

_ s

- L' ,.. LAUG 2 41999 4

r. .

. o n Boston' Edison CompanyL J2; ,

q i

i "cc w/ enc 1"  !

K','HighfillkStationDirector.. '

R. Anderson, Plant Manager z J. Keyes, Licensing. Division; Manager-E. Robinson, Nuclear. Information Manager .

a

- R. Swanson, Nuclear Engineering -Department Manager

The Honorable. Edward J. Markey.
l. The Honorable 1 Edward P. : Kirby ,

L -The Honorable Peter V.:Forman ~'

L i

'The Honorable Lawrence ~R.LAlexander >

j

The Honorable: Nicholas:-J. Costello .  !

p B. McIntyre, Chairman, Department. of Public Utilities L Chairman',' Plymouth Board of. Selectmen- _

Chairman,' Duxbury Board of Selectmen ' i Plymouth Civil. Defense. Director ^

. d j

- P. Agnes, Assistant Secretary of Public Safety, Commonwealth of 'j Massachusetts l-k

" S. Pollard, Massachusetts Secretary of Energy: Resources R. Shimshak, MASSPIRG .

l Public Document Room.(PDR) . j Local;Public: Document. Room.(LPDR)- . . ~1 NuclearLSafety Information Center (NSIC) J. .j NRC' Resident Inspector

CommonwealthofMassachusetts.(2)

'bec w/ encl: ~

Region I Docket Room (with concurrences) f = p;.,;.,t Assistant,---On",A (,/c cr,ct).

W. Russell, RA -)

i J.' Dyer, EDO R. Wessman, NRR D. Mcdonald,.NRR

.S.l Collins,.DRP' J..Wiggins, DRP R. Blough, DRP'

.J. Lyash, DRP-M. Kohl, DRP-C. Warren, SRI - Pilgrim (with concurrences)

PA0'(21).Salp Reports and All Inspection Reports C t R RS RI-:DRS -

f Widters/rw Durr 8/)f/89 8/tf/89 0FFICIAL RECORD COPY 50-293 QA - 0002.0.0 08/24/89

. . _ - - J

+ .i 10CFR50.54(t)

U

{ .k ~7f j g }

( ~7 Yi ,

m sosasus= \4Y\ >

Pilgnm Nuclear Power Station Rocky Hill Road bh QN 3 HY7 l Plymouth, Massachusetts 02360 Ralph G. Wird BECo 89-091 Senior Vice President - Nuclear U.S. Nuclear Rigulatory Commission June 30, 1989 Document Control Desk Hashington, DC 20555 License DPR-35 Docket 50-293 ANNUAL REPORT OF CHANGES TO THE BOSTON EDISON OUALITY ASSURANCE PROGRAM DESCRIPTION As required by 10CFR50.54(a), Boston Edison submits the. annual summary of

' changes made to. the 4 Boston Edison Quality Assurance Program Description as listed in the Boston Edison Quality Assurance Manual (BEQAM), Volume II.

He evaluated each change, summarized in enclosure _(A), to determine il any requirements contained in the previously NRC-approved QA Program Description were deleted or made less stringent. He concluded there were no reductions of commitments. 10CFR50, Appendix B, Criterion II requirements were used to conclude the revised program continues to satisfy the criteria of Appendix B.

R. G. Bird f A GGH/amm/3398

Enclosure:

(A) Summary of the Boston Edison QA Program Description Changes (1988-1989) cc: Mr. D. Mcdonald, Project Manager Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Mail Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD .02852 l

U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station

} jQ 5) 3fr -

P - -

~*

ENCLOSURE (A)

TO BECo LETTER NO.89-091  ;

t '

J

SUMMARY

OF THE BOSTON EDIS0N QA PROGRAM DESCRIPTION CHANGES  !

(1988-1989) i QA PROGRAM CHANGE #II-213 EVALUATION #88-28 This change modifies Section 18 of BEQAM II as follows:

To clarify and strengthen the requirements related to Supplier Finding Reports.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previoucly accepted by the NRC.

QA PROGRAM CHANGE #II-214 \  ;

EVALUATION #88-29 Void; no change was made to the BEQAH.

QA PROGRAM CHANGE #II-215 EVALUATION #88-30 Void; no change was made to the BEQAM.

QA PROGRAM CHANGE #II-216 EVALUATION #88-31 This change modifies Section 18 of BEQAM II as follows:

To clarify the requirements relative to the escalation time limits for Deficiency Reports without proper resolution.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

y ua.

w 7

'0A PROGRAM CHANGE:#II-217

-EVALUATION #88-32' LThis change modifies Section-13 of BEQAM II as follows:

To. reflect existing practice, using Stores / Claims to document discrepancies found during receipt inspection.

The revised program incorporating'this change continues to satisfy the criteria of 10CFR50,. Appendix B, and the Safety Analysis' Report Quality-Assurance Program description commitments previously accepted by the'NRC.

l 0A' PROGRAM CHANGE #1I-218' EVALUATION #88-33 This change modifies Section 4 of BEQAM II as follows:

.To add explanatory detail _about the Commercial Quality Item (CQI) process. _ Also, to provide a way to upgrade a .non-Q item to Q if..it meets the tests required for.a CQI.

\

To change the title of Vice President Nuclear Engineering to Director of Nuclear Engineering.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-219 EVALUATION #88-34 This change modifies Section 7 of BEQAM II as follows:

For consistency with the changes made to Section 4 by QA Program Change Request II-218.

Also, to explicitly address the use of the Material Receiving Inspection Report (MRIR), the QA Material Conformance Tag, and the MRIR Number.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix.B. and the Safety Analysis Report Quality Assurance. Program description commitments previously accepted by the NRC.

l.

  • i e .

h QA PROGRAM CHANGE #II-220 EVALUATION #88-35  ;

This change modifies Section 8 of BE0AM II as follows:

To explicitly address the use of the Material Receiving Inspection Report (MRIR), the QA Material Conformance Tag, and the MRIR Number, consistent with QA Program Change Request 11-219.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

0A PROGRAM CHANGE #II-221 EVALUATION #89-01 This change modifies Section 10 of BEQAM II as follows:

To remove the requirement for Quality Control to maintain copies of Installation Inspection Reports in Quality Assurance Department files since they are already captured as BECo QA Records in '

accordance with ANSI N45.2.9, and there is no need for redundant official files.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.