- 5 U.S. NUCLEAR REGULATORY COMMISSION
REGION I
'
Report No. 50-293/87-23 Docket No. 50-293 License No. DPR-35 Licensee: Boston Edison Company M/C Nuclear
_ 800 Boylston Street Boston, Massachusetts 02199 Facility Name: -Pilgrim Nuclear Power Station
'
Meet.ing Location: US Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA Meeting Date: May 1, 1987 d!M F///!/ 7 Prepared By:
Norman J. Blumtferg, Chief date Operational Programs Section 08, DRS PeterW.EselgrotfActingChief
_ 8/82/87 Approved by:
,
date Operations Branch, DRS Meeting Summary: A licensee requested meeting was held with NRC staff at the Region I office on May 1,1987, to discuss Notice of Violation (Item B) in NRC Inspection Report 50-293/87-04 concerning adequacy of the licensee's surveil-lance test program procedures. The licensee desired to ensure that its point of view was understood by NRC staff.
,.
O
_
y
...
.s DETAILS 1.
ATTENDEES Boston Edison Company (BECo)
K. Roberts, Nuclear Operations Manager N. Brosee, Maintenance Section Manager R. Grazio, Field Engineering Manager US Nuclear Regulatory Commission P. W. Eselgroth, Acting Chief, Operations Branch, DRS P. K. Eapen, Chief, Quality Assurance Section, OB, DRS N. J. Blumberg, Chief, Operational Programs Section, 08, DRS P. Bissett, Reactor Engineer, Operational Programs Section, OB, DRS 0. Gormley, Licensing Project Engineer, NRR M..McBride, Senior Resident Inspector, Pilgrim Station C. Warren, Acting Section Chief, Project Section IB, DRP R. Wessman, Licensing Project Manager, Pilgrim Station, NRR 2.
MEETING SUMMARY With regard to Notice of Violation B in Inspection Report 50-293/87-04, the BECo staff, acknowledging that improvements were needed in their test program administration, stated they felt they were in compliance with the words and intent of ANSI N 18.7-1976. They took issue with the violation as written and stated that compliance with the ANSI standard was accomplished by each implementing test ' procedure.
Their interpretation was that ANSI 18.7-1976 did not specifically require definitive test program administrative procedures separate from the implementing procedures.
Following a review of the NRC finding, the licensee concurred that more definite program controls should be put in place.
The licensee also stated that more centralized control of testing would be established.
Some of these improvements were presented to the NRC at a management meeting at the Pilgrim Chiltonville Training Facility on February 2,1987, (See Report No. 50-293/87-08). This meeting was held after the conclusion of Inspection No. 50-293/87-04 on January 16, 1987, and before the issuance of the report on March 10, 1987.
The NRC staff agreed that the individual test procedures, to the extent that they were reviewed during Inspection 87-04, were in compliance with administrative requirements of ANSI N 1 c
-
f,
.
The staff requested that BEco submit a written response concerning Violation B and in that response state what actions had been taken, or were planned to improve the program, as had been described verbally at the meeting.
These actions would be considered part of the licensee's response and would be evaluated accordingly.
.......