Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP
ML20210U576
Person / Time
Site: Pilgrim
Issue date: 08/18/1999
From: Adensam E
NRC (Affiliation Not Assigned)
To: Murray T
MASSACHUSETTS, COMMONWEALTH OF
Shared Package
ML20210U581 List:
References
NUDOCS 9908200165
Download: ML20210U576 (3)


Text

[

Thi Honorcbl3 Thir se'Murray August 18, 1999 Missachusetts Sanits t

  • Stats Houss Boston, MA 02133-1053

Dear Ms. Murray:

I am responding to the letter you sent to Mr. Samuel Collins on June 25,1999, opposing the merger of BEC Energy and Commonwealth Energy System in the Commonwealth of l

Massachusetts. This merger was related to the issuance of the sale and transfer conforming

]

amendments for the Pilgrim Nuclear Power Station (Pilgrim) only if the. merger were to precede the sale of the plant. BEC Energy owns Boston Edison Company, which did own Pilgrim.

i Therefore, BEC Energy would not be able to merge with Commonwealth Energy System without Nuclear Regulatory Commission (NRC) approval of an indirect transfer of the operating license as long as Boston Edison Company owned Pilgrim.

By Order dated April 29,1999, the staff approved the sale and transfer of Pilgrim from Boston Edison Company to Entergy Nuclear Generation Company. The Conforming Amendment finalizing the sale.and transfer was issued on July 13,1999. As such Boston Edison Company is no longer the licensee.

Your comments relate to th' e potential effects of the merger on the financial consequences to

~

the public and on the reliability of the distribution system. Even if Boston Edison Company were still the licensee, these comments are not within the purview of the NRC. For the sale, the NRC had the responsibility only to ensure that Entergy Nuc; oar Generation Company (the buyer) is both financially and technically ovalified to own and operate Pi! grim. We have forwarded this

' letter to the Federal Energy Replatorv Commission and the Massachusetts Department of Transportation and Energy for their consideration ct tha !ssues raised in your letter.

Thank you for sharing your concerns with the NRC. If you should have any further questions, please contact me at (301) 415-1353, or Intemet EGA1 @NRC. GOV.

Sincerely, ORIGINAL SIGNED BY:

Elinor G. Adensam, Director Project Directorate i Division of Licensbg Project Management f

- Office of Nuclear Reactor Regulation t

O h

DISTRIBUTION:

Docket File (50-293 w/ orig. Incoming)

PUBLlC' (w/ incoming)

BBoger JZwolinski/SBlack AWang EAdensam (EGA1)

WKane

{

CNorsworthy (RCN)

TClark NRR Mail Rm. (YT990179) MKing BSheron-'

CAndersen, RI SCollins/RZimmerman -

JClifford l

l PDI-2 r/f(w/ incoming) 7(f', O N -

~ Document Name: G:\\PDl-2\\ Pilgrim \\murray.wpd l

OFC-PDI 2/PM PDI-2//LA PDl-2/SC PQfPD NAME AWank TClarh JCb EA am DATE

$ /17/99 8 / /8'/99

[/l 7/99 k /h/99 COPY YES/NO '

(MNO YES/NO YES/NO oTgiCIAL RECORD COPY fo8E E,5!p Mllf CENE SM

.q.

p e accoq fe k

UNITED STATES NUCLEAR REGULATORY COMMISSION f

WASHINGTON. D.c. 20555-0001 i

August 18, 1999 The Honorable Therese Murray Massachusetts Senate State House Boston, MA 02133-1053

Dear Ms. Murray:

I am responding to the letter you sont to Mr. Samuel Collins on June 25,1999, opposing the merger of BEC Energy and Commonwealth Energy System in the Commonwealth of Massachusetts. This merger was related to the issuance of the sale and transfer conforming amendments for the Pilgrim Nuclear Power Station (Pilgrim) only if the merger were to precede the sale of the plant. BEC Energy owns Boston Edison Company, which did own Pilgrim.

Therefore, BEC Energy would not be able to merge with Commonwealth Energy System without Nuclear Regulatory Commission (NRC) approval of an incirect transfer of the operating

)

license as long as Boston Edison Company owned Pilgrim.

]

By Order dated April 29,1999, the staff approved the sale and transfer of Pilgrim from Boston Edison Company to Entergy Nuclear Generation Company. The Conforming Amendment finalizing the sale and transfer was issued on July 13,1999. As such Boston Edison Company is no longer the licensee.

Your comments relate to the potential effects of the merger on the financial consequences to the public and on the reliability of the distribution system. Even if Boston Edison Company were still the licensee, these comments are not within the purview of the NRC. For the sale, the NRC had the responsibility only to ensure that Entergy Nuclear Generation Company (the buyer) is both financially and technically qualified to own and operate Pilgrim. We have forwarded this letter to the Federal Energy Regulatory Commission and the Massachusetts Department of Transportation and Energy for their consideration of the issues raised in your letter.

Thank you for sharing your concerns with the NRC. If you should have any further questions, please contact me at (301) 415-1353, or Internet EGA1 @NRC. GOV.

Sincerely,

~

Elinor G. Adensam, Director Project Directorate i Division of 1.icensing Project Management Office of Nuclear Reactor Regulation

)

ORIGINAL'DUE DT: 07/23/99 TICKET NO: 019990179 FROM:

DOC DT: 06/25/99 Therese Murray NRR RCVD DATE: 07/06/99 TO:

Sam Collins

    • YEL FOR SIGNATURE OF :

DESC:

ROUTING:

j

-Merger of BEC Energy and Commonwealth Energy Collins /Zimmermn System in the Commonwealth of Massachusetts Kane Sheron NRR Mailroom ASSIGNED TO:

CONTACT:

DLPM Zwolinski SPECIAL INSTRUCTIONS OR-REMARKS:

Coordinate,with~ DRIP.'for response 9

ACTION l' DUE T01RR DIRECTOR

'r-Q y