ML20209B979

From kanterella
Jump to navigation Jump to search
Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13
ML20209B979
Person / Time
Site: Pilgrim
Issue date: 06/29/1999
From: Alexander J
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20209B985 List:
References
BECO-2.99.067, NUDOCS 9907080385
Download: ML20209B979 (1)


Text

.

10CFR50.36 maanan amean Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 June 29,1999 BECo Ltr. 2.99.067 U. S. Nuclear Regulatory Commission Attention: Document Control Desk

- Washington, DC 20555 j 1

l I

Docket No. 50-293 License No. DPR-35 Core Operatina Limits Reports. Revision 13 A The attached revision of Pilgrim's Core Operating Limits Report (COLR) is submitted in accordance with the requirements of Pilgrim's Technical Specification 5.6.5.

Revision 13A provides cycle-specifii lits for operating Pilgrim during the remainder of cycle 13.

The core operating limits in COLR, i vision 13A, have been established using the NRC-approved I methodology provided in the references listed in COLR, Section 5.0 and in Technical Specification - 5.6.5.

Should you require further information concerning COLR, Revision 13A, please contact P M. Kahler at (508) 830-7939.

i exan r clear Assessment Group Manager PMK/sc --

Attachment:

Pilgrim Nuclear Power Station Core Operating Limits Report, Revision 13A cc: Mr. Alan B. Wang, Project Manager U.S. Nuclear Regulatory Commission

Project Directorate 1-3 Region 1 Office of Nuclear Reactor Regulation 475 Allendale Road Mail Stop: OWFN 14B20 King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission 1 White Flint North Senior Resident inspector g 11555 Rockville Pike Pilgrim Nuclear Power Station Rockville, MD 20852 ,

] {I 9907090385 990Mt9 --

PDR ADOCK 05000293 P PDR ,

290067