ML20209B979
| ML20209B979 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/29/1999 |
| From: | Alexander J BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20209B985 | List: |
| References | |
| BECO-2.99.067, NUDOCS 9907080385 | |
| Download: ML20209B979 (1) | |
Text
10CFR50.36 maanan amean Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 June 29,1999 BECo Ltr. 2.99.067 U. S. Nuclear Regulatory Commission Attention: Document Control Desk
- Washington, DC 20555 j
1 Docket No. 50-293 I
License No. DPR-35 Core Operatina Limits Reports. Revision 13 A The attached revision of Pilgrim's Core Operating Limits Report (COLR) is submitted in accordance with the requirements of Pilgrim's Technical Specification 5.6.5.
Revision 13A provides cycle-specifii lits for operating Pilgrim during the remainder of cycle 13.
The core operating limits in COLR, i vision 13A, have been established using the NRC-approved I
methodology provided in the references listed in COLR, Section 5.0 and in Technical Specification - 5.6.5.
Should you require further information concerning COLR, Revision 13A, please contact P M. Kahler at (508) 830-7939.
i exan r clear Assessment Group Manager PMK/sc --
Attachment:
Pilgrim Nuclear Power Station Core Operating Limits Report, Revision 13A cc: Mr. Alan B. Wang, Project Manager U.S. Nuclear Regulatory Commission
- Project Directorate 1-3 Region 1 Office of Nuclear Reactor Regulation 475 Allendale Road Mail Stop: OWFN 14B20 King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission 1 White Flint North Senior Resident inspector g
11555 Rockville Pike Pilgrim Nuclear Power Station Rockville, MD 20852
]
{I 9907090385 990Mt9 PDR ADOCK 05000293 P
PDR 290067