Forwards Safety Insp Rept 50-293/90-09 on 900806-10.No Violations Noted.Concludes That Engineering & Technical Support Organizations Continue to Provide Strong Station Support
ML20059J652
Person / Time
Site: Pilgrim
Issue date: 08/29/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20059J655 List:
References
NUDOCS 9009200104
Download: ML20059J652 (2)


See also: IR 05000293/1990009

Text

R

.

, 'l

e

~ ' '

-

'*'

.l

,

. ,

-

1.

-

'

,

w

,

->

.

u

y

AUG 2 91990

r

-

,

Docket No. 50-293'.

.;

Boston' Edison Company

.

-

' ATTN: Mr. Ralph.G. Bird

J

Senior Vice. President - Nuclear

t

Pilgrim Nuclear Power Station:

RFD #1 Rocky-Hill Road

1

Plymouth, Massachusetts 02360

'

1

Gentlemenf

'

-:

Subject:

Inspection, Report No.- 50-293/90-09-

1

This' letter refers to the routine-safety inspection conducted by- ~

-

.Hr. James M. Trapp of this office on: August 6-10,11990,-and to the discussions

of our findings held by Mr. Trapp with Mr. K.- Highfill at the conclusion of the:

-i

inspection. The activities reviewed during this inspection'are' authorized by

NRC license-No. DPR-35=

freas examined during.this. inspection are described in the NRCLRegion'I In vection'

$

Report which is enclosed with this letter. Within these areas,1the inspection

consisted of selective' examinations of procedures and representativesrecords,

1

interviews with personnel, and observations by the inspector.'

.

This inspection concluded that engineering and. technical support organizations,

[

continue to provide strong station support'. Within.the' scope of this inspection,.

l

no violations were observed.

,

No reply to this letter is required.

Your cooperation with usLin this matter

3

is appreciated.

Sincerely,

-

Origi:ml Signed E71

,

Jacquo P.i Durrc

)

Jacque P. Durr., Chief.

' Engineering Branch

.

^

Division of~Reacto.r Safety'-

^

Enclosure: NRC Region I Inspection. Report No. 50-293/90-09:

q

00053-

9009200104 900829 7

0

6 0

I

L

7" ^" y "8%

V

._

__

-_

_ - _ _ _ _

,

Li

'

-

1

AUG 2 91990;

+

.-

Boston Edison Company 1

2>

l

l

cc w/ enc 1:'

'

K. Highfill, Vice President, Nuclear _ Operations

R. Anderson, Plant Manager

.

i

-J. Dietrich,_ Licensing Division Manager

1

E._ Robinson, Nuclear.Information Manager -

R. Swanson, Regulatory Affairs Manager

-The Honorable John F.'; Kerry

~

The Honorable Edward J. Markey

1

The Honorable Edward P. Kirby.

l

'

The Honorable Peter'V. Forman-

The HonorableiEdward M. Kennedy

The Honorable Lawrence R. Alexander

3

The Honorable Nicholas -J. Costello

<

>

B.- McIntyre, Chairman, Department of Public' Utilities

Chairman,-Plymouth. Board-of Selectmen

Chairman, Duxbury % d ofLSelectmen=

-

t

Plymouth Civil Defense Director

..

.

..

R._Hallisey, Department of Public Health, Commonwealth-~of~ Massachusetts-

.

R. Adams, Departmentof Labor and Industries,' Commonwealth _of. Massachusetts-

- D. Tibbetts, Acting Massachusetts Secretary:of Energy: Resources

Sarah Woodhouse', Legislative Assistant

'

A. Nogee, MASSPIRG

.

..

_

.;

J. W. McCor. mack, FEMA' Regional Administrator

.,

Public Document' Room (PDR).

i

Local Public Document Room-(LPDR)

,

' Nuclear Safety Information Center. (NSIC E

NRC Resident Inspector

_

,

Commonwealth of Massachusetts, SLO Designee-

.i

l

bec w/ enc 1: .

,

i

Region I Docket Room (with concurrences)"

Management Assistot, DRMA (w/o' enc 1)

T. Martin, RA'

R. Bellamy, DRSS

J. Johnson, DRP

J. Rogge, DRP

.

'-

J. Macdonald, SRI'- Pilgrim (with concurrences)

.M. Conner, SALP Reports Only

K. Abraham, PA0 (20) SALP Report and'(2) All Inspection Reportsi

J._Caldwell, ED0

R.'Wessman, NRR

.

R.'Eaton, NRR

'

RI:DRS

.RI:DRS

RI:DRS

Trapp

Chiramp1

.Durr

N-

W

4

\\

8/20 /90

' 8/).n/90

8//$/90

0FFICIAL RECORD COPY

PILGRIM 90-09 - 0002.0.0

08/I6/90

f

'

.

4

,

.

-

..

,