ML20059J652

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-293/90-09 on 900806-10.No Violations Noted.Concludes That Engineering & Technical Support Organizations Continue to Provide Strong Station Support
ML20059J652
Person / Time
Site: Pilgrim
Issue date: 08/29/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20059J655 List:
References
NUDOCS 9009200104
Download: ML20059J652 (2)


See also: IR 05000293/1990009

Text

R

~ ' '

,

-

.,

e

'*'

-

.

, 'l

.l '

-

1. ,

w ,

. ->

u

y

AUG 2 91990 r -

,

Docket No. 50-293'.

.;

Boston' Edison Company .

-

' ATTN: Mr. Ralph.G. Bird J

Senior Vice. President - Nuclear t

Pilgrim Nuclear Power Station: *

RFD #1 Rocky-Hill Road 1

Plymouth, Massachusetts 02360 '

1

Gentlemenf

'

-:

Subject: Inspection, Report No.- 50-293/90-09- 1

This' letter refers to the routine-safety inspection conducted by- ~

-

.Hr. James M. Trapp of this office on: August 6-10,11990,-and to the discussions

of our findings held by Mr. Trapp with Mr. K.- Highfill at the conclusion of the: -i

inspection. The activities reviewed during this inspection'are' authorized by

NRC license-No. DPR-35=

freas examined during.this. inspection are described in the NRCLRegion'I In vection' $

Report which is enclosed with this letter. Within these areas,1the inspection

consisted of selective' examinations of procedures and representativesrecords, 1

interviews with personnel, and observations by the inspector.' .

This inspection concluded that engineering and. technical support organizations, [

continue to provide strong station support'. Within.the' scope of this inspection,. l

no violations were observed.

,

No reply to this letter is required. Your cooperation with usLin this matter 3

is appreciated.

Sincerely, -

Origi:ml Signed E71 ,

Jacquo P.i Durrc )

Jacque P. Durr., Chief. I

' Engineering Branch ^

.

Division of~Reacto.r Safety'- l

^

Enclosure: NRC Region I Inspection. Report No. 50-293/90-09: l

q

00053-

9009200104 900829 7 0 6 0 I

L 7" ^" y "8% V

._ __ -_ _ - _ _ _ _

,

Li +

'

1

.-

-

AUG 2 91990; i

l

Boston Edison Company 1 2> l

l

l

cc w/ enc 1:' '

K. Highfill, Vice President, Nuclear _ Operations  :

R. Anderson, Plant Manager .

i

-J. Dietrich,_ Licensing Division Manager 1

E._ Robinson, Nuclear.Information Manager -  :

R. Swanson, Regulatory Affairs Manager ~

-The Honorable John F.'; Kerry

The Honorable Edward J. Markey 1

The Honorable Edward P. Kirby. '

l

The Honorable Peter'V. Forman-

The HonorableiEdward M. Kennedy

The Honorable Lawrence R. Alexander 3

The Honorable Nicholas -J. Costello > <

B.- McIntyre, Chairman, Department of Public' Utilities

Chairman,-Plymouth. Board-of Selectmen

Chairman, Duxbury % d ofLSelectmen= -

t

Plymouth Civil Defense Director .. .

..

R._Hallisey, Department of Public Health, Commonwealth-~of~ Massachusetts- .

R. Adams, Departmentof Labor and Industries,' Commonwealth _of. Massachusetts-

- D. Tibbetts, Acting Massachusetts Secretary:of Energy: Resources

Sarah Woodhouse', Legislative Assistant '

A. Nogee, MASSPIRG . ..

_ .;

J. W. McCor. mack, FEMA' Regional Administrator .,

Public Document' Room (PDR). i

Local Public Document Room-(LPDR) ,

' Nuclear Safety Information Center. (NSIC E

NRC Resident Inspector _

,

Commonwealth of Massachusetts, SLO Designee- .i

l

bec w/ enc 1: . ,

i

Region I Docket Room (with concurrences)" l

Management Assistot, DRMA (w/o' enc 1)

T. Martin, RA'

R. Bellamy, DRSS

J. Johnson, DRP

J. Rogge, DRP

'-

.

J. Macdonald, SRI'- Pilgrim (with concurrences)

.M. Conner, SALP Reports Only

K. Abraham, PA0 (20) SALP Report and'(2) All Inspection Reportsi

J._Caldwell, ED0

. R.'Wessman, NRR

R.'Eaton, NRR '

RI:DRS .RI:DRS RI:DRS

Trapp Chiramp1 .Durr

N- W 4

\ 8/20 /90 ' 8/).n/90 8//$/90

0FFICIAL RECORD COPY PILGRIM 90-09 - 0002.0.0

08/I6/90

'

f

.

, 4

  • . - .. ,