ML20059J652
| ML20059J652 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/29/1990 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bird R BOSTON EDISON CO. |
| Shared Package | |
| ML20059J655 | List: |
| References | |
| NUDOCS 9009200104 | |
| Download: ML20059J652 (2) | |
See also: IR 05000293/1990009
Text
R
.
, 'l
e
~ ' '
-
'*'
.l
,
. ,
-
1.
-
'
,
w
,
->
.
u
y
AUG 2 91990
r
-
,
Docket No. 50-293'.
.;
Boston' Edison Company
.
-
' ATTN: Mr. Ralph.G. Bird
J
Senior Vice. President - Nuclear
t
Pilgrim Nuclear Power Station:
RFD #1 Rocky-Hill Road
1
Plymouth, Massachusetts 02360
'
1
Gentlemenf
'
-:
Subject:
Inspection, Report No.- 50-293/90-09-
1
This' letter refers to the routine-safety inspection conducted by- ~
-
.Hr. James M. Trapp of this office on: August 6-10,11990,-and to the discussions
of our findings held by Mr. Trapp with Mr. K.- Highfill at the conclusion of the:
-i
inspection. The activities reviewed during this inspection'are' authorized by
NRC license-No. DPR-35=
freas examined during.this. inspection are described in the NRCLRegion'I In vection'
$
Report which is enclosed with this letter. Within these areas,1the inspection
consisted of selective' examinations of procedures and representativesrecords,
1
interviews with personnel, and observations by the inspector.'
.
This inspection concluded that engineering and. technical support organizations,
[
continue to provide strong station support'. Within.the' scope of this inspection,.
l
no violations were observed.
,
No reply to this letter is required.
Your cooperation with usLin this matter
3
is appreciated.
Sincerely,
-
Origi:ml Signed E71
,
Jacquo P.i Durrc
)
Jacque P. Durr., Chief.
' Engineering Branch
.
^
Division of~Reacto.r Safety'-
^
Enclosure: NRC Region I Inspection. Report No. 50-293/90-09:
q
00053-
9009200104 900829 7
0
6 0
I
L
7" ^" y "8%
V
._
__
-_
_ - _ _ _ _
,
Li
'
-
1
AUG 2 91990;
+
.-
Boston Edison Company 1
2>
l
- l
cc w/ enc 1:'
'
K. Highfill, Vice President, Nuclear _ Operations
R. Anderson, Plant Manager
.
i
-J. Dietrich,_ Licensing Division Manager
1
E._ Robinson, Nuclear.Information Manager -
R. Swanson, Regulatory Affairs Manager
-The Honorable John F.'; Kerry
~
The Honorable Edward J. Markey
1
The Honorable Edward P. Kirby.
l
'
The Honorable Peter'V. Forman-
The HonorableiEdward M. Kennedy
The Honorable Lawrence R. Alexander
3
The Honorable Nicholas -J. Costello
<
>
B.- McIntyre, Chairman, Department of Public' Utilities
Chairman,-Plymouth. Board-of Selectmen
Chairman, Duxbury % d ofLSelectmen=
-
t
Plymouth Civil Defense Director
..
.
..
R._Hallisey, Department of Public Health, Commonwealth-~of~ Massachusetts-
.
R. Adams, Departmentof Labor and Industries,' Commonwealth _of. Massachusetts-
- D. Tibbetts, Acting Massachusetts Secretary:of Energy: Resources
Sarah Woodhouse', Legislative Assistant
'
A. Nogee, MASSPIRG
.
..
_
.;
J. W. McCor. mack, FEMA' Regional Administrator
.,
Public Document' Room (PDR).
i
Local Public Document Room-(LPDR)
,
' Nuclear Safety Information Center. (NSIC E
NRC Resident Inspector
_
,
Commonwealth of Massachusetts, SLO Designee-
.i
l
bec w/ enc 1: .
,
i
Region I Docket Room (with concurrences)"
Management Assistot, DRMA (w/o' enc 1)
T. Martin, RA'
R. Bellamy, DRSS
J. Johnson, DRP
J. Rogge, DRP
.
'-
J. Macdonald, SRI'- Pilgrim (with concurrences)
.M. Conner, SALP Reports Only
K. Abraham, PA0 (20) SALP Report and'(2) All Inspection Reportsi
J._Caldwell, ED0
R.'Wessman, NRR
.
R.'Eaton, NRR
'
RI:DRS
.RI:DRS
RI:DRS
Trapp
Chiramp1
.Durr
N-
W
4
\\
8/20 /90
' 8/).n/90
8//$/90
0FFICIAL RECORD COPY
PILGRIM 90-09 - 0002.0.0
08/I6/90
f
'
.
4
,
.
-
..
,