ML20209C776
| ML20209C776 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/06/1999 |
| From: | Alexander J BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BECO-2.99.059, NUDOCS 9907120211 | |
| Download: ML20209C776 (1) | |
Text
s 3
Boetan 6sioon Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 July 6,1999 BECo Ltr. 2.99.059 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35
Subject:
Report of Changes to the Boston Edison Quality Assurance Program Description in accordance with 10CFR50.54(a)(3), Boston Edison submits an annual summary report of changes made to the Boston Edison Quality Assurance Program Description as described in the Boston Edison Quality Assurance Manual (BEQAM), Volume 11. This report covers the period from July 1998 through June 1999.
During this period, there have been no changes in the Quality Assurance Program Description previously approved by the NRC.
OW W h Q d4 J.F. Alexander Nuclear Assessmen Group Manager JFA/sc cc:
Mr. Alan B. Wang, Project Manager Project Directorate 1-1 Mail Stop: 14B2 U.S. Nuclear Regulatory Commission l
1 White Flint North j
]
11555 Rockville Pike g
i Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road
.go k King of Prussia, PA 19406 o
- Sr. NRC Resident inspector P)ilgpggar Power Station -
9907120211 990706 PDR ADOCK 05000293 p
PDR c
.