~r-~,\ ..

/

. , . Entorgy Nuclear Generttion Company v

Pilgnm Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 At gust 13, 1999 ENGC Ltr. 2.99.084 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35 Submittal of Fitness-For-Duty Prooram Performance Data for Pilarim Nuclear Power Station The enclosed Fitness-For-Duty Program performance data sheets are subrnitted in accordance with 10CFR26.71(d). This submittal contains data for the period January 1,1999 through June 30,1999.

Please contact me if you have any questions or comments regarding the enclosed submittal.

) ander, ctor uclear Assessment Group l

CYM/sc Attachments 4

cc: Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWFN 14B20 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 1 U. S. Nuclear Regulatory Commission /

Region i 475 Allendale Road King of Prussia, PA 19406 Genior Resident Inspector 200011 Pilgrim Nuclear Power Station 9908200127 990813 PDR R ADOCK 05000293 PDR

I

_ _ , jr- -

] )

\_v._ _ f Entergy Nuclear Generation Company Pilgnm Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Nh Psoteethe Sewka Supstatendent (508) 730-8777 i faly29.1999 7kaea 7es Duty Pe<fosaaae Data Summa <9 ol% m-etdetaa Stz %th Pested Sadia9 fase 30.1999 During the period beginning January 1,1999 and ending on June 30,1999, we tested 38.76 percent of our work force. We had a total of 2.70 percent positive tests. All but one of these tests were identified during pre-access testing. No licensee tested positive during this period. All of these contractors were denied access. The one random test q identified as a positive was a security guard and his access was revoked.

The total confirmed positive test results reflect the number of substances abused and not the number of people tested.

A total of sixteen contractors were positive for marijuana. Only nine of those were positive at the 100 nanogram level.

We began adulterant testing on March 15,1999. We are using SmithKline's " Test Sure".

This program includes the following adulteration tests:

Creatinine pH Specific Gravity l Bleach Glutaraldehyde Nitrate -

Pyridine l

V ... .

I t

k

, We,had ten refusals to test. Five of those were adulterated samples. Three were u identified as nitrates and two were identified as pyridine.

l Integrity checks revealed that there were twelve specimens having creatinine levels of less than 200 nanograms per liter. Two contractors refused to repeat their tests and as a l

result, they were denied access.

Six For Cause tests were performed during this period. None of these tests were positive. We performed sixty-eight tests in our follow-up testing program.

Our plant began its 30 day outage in May. Because of the increased number of positive pre-access tests, we have increased our rate of contractor testing.

One of our self-assessments was to verify the lack of false positive results due to interfering substances using our Intoxilizer 5000. The final results were conclusive that over the counter substances such as gum, Nyquil, Listerine, etc. do not cause false positive test results.

1 l

l I

i l

1 l

l I

- J

o

, PERSENNEL SUBJECT TO 10CFR26 c8/08/1999 Date Criteria: From: 01/01/99 To: 06/30/99 80ston Edison Company Pitrim Nuclear Power Station Contact Name Johnny Neal Phone (include area code) (508) 850-8788 BREAKDOWN OF CONFORMED POSITIVE TESTS FOR SPECIFIC SU8 STANCES Idlerthanalc ' 5 caine ~ OpEes"^

liAUIEan~a]

50ng/m! , s00ng/mi j 300ng/mi 300ng/mi l1000ng/mihmphetaminei l 25ng/mi l! PhenEyclidind, to Test j , Alcohol] Itef

_.__3 _.._...__., .._.__._q,._.. , _ . _ . . _ .

smolovees ._

0 J 0

..; _ . _ _0, t 0, 0 >it 0, 0 L 0 i _ _ . . ___ . ; '. .a L ._ _ . a > i 4 . - _. . _ ... a L .3  !. _

l

~

som 7 8 8 O O O 7

,,g, _. _ ._ J .._ - _ 3 _ ._ . .; . .__ _ _ _ _ - _ . _ _ . _ . ._ 10l. . _ _ .

I fishniUtisulfs ...T.] 'L.lceliis~eiEr5plofEes] sontractor Personne(( ~'

~

hverage Numbel' ~~ i~ ~~647.77 ~ ~]E 466.92 With unescorted _ _. _ . .__ _

.j L _ _ _ _ _ __

categories _ ~ ~l tested] Positive _. i~1 fisfid positNe [

~

R Pre-Acceis~ _] [ [ 146 I 10 l[861) ((. _ _ ~ ((58

[ [3[l((((0((_]1$((i ~ll[6

~

For C_ ause (( ~ _]

kind _om ] (( ].] [201] ((_]~d [ _ 253 [~[ ~ _ _ _1. _

FOlloiM[Othir.)) ((.))j (((( 6[ [ 53 [ [ _i._._ [ l_3 fotal l .._~_i__l._] ((26h (_[- 6j[117f((

.. _[ ~ 56 l

PERCENT OF TOTAL WORKFORCE RANDOMLY TESTED DURING THis PERIOD = 58.76 %