ML20211M450

From kanterella
Jump to navigation Jump to search
Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2
ML20211M450
Person / Time
Site: Pilgrim
Issue date: 09/03/1999
From: Alexander J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ENGC-2.99.087, NUDOCS 9909090117
Download: ML20211M450 (2)


Text

. . , 3

.h / j Y-M

" Entergy Nuclear Generation Company Pdgnm Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 September 3,1999 ENGC Ltr. 2.99.087 J.F. Alexander, Director Nuclear Assessment Group U. S. Nuclear Regulatory Commission Attn: Document Control Desk (w/o attachment)

Washington, DC 20555 Docket No. 50-293 License No. DPR-35

Subject:

Schedulina of Pilarim Nuclear Power Station 1999 Emeraency Preparedness Exercise In accordance with the requirements of 10 CFR 60, Appendix E, Section IV.F.2, Pilgrim Nuclear Power Station plans to conduct a full participatior 5mergency Preparedness Exercise with the Commonwealth of Massachusetts on December 7,1999.

Two copies of the proposed scope and objectives for this Exercise are attached for your review. Also included for your review is the proposed schedule for activities surrounding the Exercise.

The objectives include demonstration, where appropriate, of corrective actions taken in regard to areas that warrant attention previously identified during NRC inspections, emergency exercises, and drills. The scope and objectives are submitted in accordance with FEMA's Radiological Emergency Preparedness (REP) Exercise Manual, FEMA-REP-14, dated September 1991 g Please note that in conjunction with this Exercise, the Commonwealth and local govemment agencies will be demonstrating offsite Ingestion Pathway activities. Objectives and scope for those activities are found in the Commonmalth's correspondence with FEMA and are not included here.

If you have any questions or require additionalinformation, please do not hesitate to contact Mr. Ronald Markovich, Acting Emergency Preparedness Department Manager,600 Rocky Hill Road, Plymouth, MA 02360, or call (508) 830-8032.

N . A erander

((/

'\

RW/

Attachments ,'2 9 cc: see next page' %20 9909090117 990903 PDR ADOCK 05000293 F PDR

1

=;.* .,

c'

'ENGC Ltr. 2.99.087' U. S. Nucle:r Regulat:ry Commission 4 Page 2 cc: Regional Administrator, Region 1 (w/o attachment)  !

U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Alan B. Wang, Project Manager (w/o attachment)

Project Directorate 1-3 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation ,

1 Mail Stop: OWF 8F2 1 White Flint North 11555 Rockville Pike 3 Rockville, MD 20852 l

Chief of Emergency Preparedness and Radiation Protection Mail Step: 14E21 l One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Senior NRC Resident inspector (w/o attachment)

Pilgrim Nuclear Power Station i

299067