00T 2 0 1990 lt Docket No. 50-293 I
Boston Edison Company i
ATTN: Mr. Thomas Nicholson l
a Fitness-For-Duty Manager Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road 1
Plymouth, Massachusetts 02360 Gentlemen:
Subject:
Fitness-For-Duty Program Inspection The purpose of this correspondence is to inform you that, in the near future, the NRC will be inspecting your Fitness-For-Duty (FFD) program. The duration i
of the inspection will be about two and one-half days. We w111' advise you by telephone in advance of the actual inspection' dates in order for you to make the arrangements that are discussed in this letter.
In preparction for the on-site inspection, Region I inspectors must familiarize themselves with the written-policies and procedures that are required by.10 CFR 26.20. To that end, we would appreciate.it:if you would send copies of those documents to this office, in care of Ronald J. Albert,"within two weeks of receipt of this letter. The documents will be retained-in the Region I Office during our review, and will be returned to you at the time of inspection, if i
you desire.
In addition, we would appreciate it if you would make us aware of-any subsequent revisions to those documents that occur to ensure,that our knowledge of your program is current at the time of the inspection.
i The inspection will involve interviews with you and your staff that are involved with the FFD program. The entrance meeting will provide an opportunity to schedule inspection activities based upon the availability of i
the persons to be interviewed.
Following that meeting we would like to discuss i
the overall FFD program, go over any questions we have regarding your written policies and procedures, and schedule interviews with you, the Medical Review-Officer, the Employee Assistance Program Director,>the FFD Training Director, and with other personnel who have substantial responsibilities in the!FFD program.
Please ensu a that these personnel, or' knowledgeable representatives, attend the entrance meeting so that we can schedule interviews <ith each of them. Additionally, a random sampling of licensee and contractor employees will-be selected for interviews to determine their knowledge and ur.darstanding of.the program. We would appreciate it if you would arrange for.a room where our interviews could be conducted in private.
v.
[
m k()
OFFICIAL RECORD COPY FFD BE - 0001.0.0 9011010306 901026 10/25/90 PDR ADOCK 05000293, y
1 Q
PNV:
9 s
i Boston Edison Company 2
OCT 2 01990 During the inspection, the following should be available for review:
I program audits and program records, including training records; personnel files for individuals administering the FFD program; records of pre-access authorization (suitable) inquiries; contracts with contractors and vendors; records of
[
chemical test results; and records of any' appeals.
If any of these records are i
not on the site, please inform Mr. Albert (215-337-5268) as soon as possible so i
that we can plan to include any off-site locations-in our inspection.
l Thank you for your cooperation in this matter.
l Sincerely,-
[
Ori;inal Signed By:
James Fl. joyner James H. Joyner, Chief j
Facilities Radiological Safety and.
Safeguards Branch Division of Radiation Safety and-Safeguards l
0FFICIAL RECORD COPY FFD BE - 0002.0.0 10/25/90
r I-DCT2gjpy Boston Edison Company 3
CC:
K. Highfill, Vice President, Nuclear Operations R. Anderson, Plant Manager J. Dietrich, Licensing Division Manager E. Robinson, Nuclear Information Manager R. Swanson, Regulatory Affairs Manager R. Hallisey, Department of-Public Health, Commonweel d 9f Massachusetts i
R. Adams, Department of L&bor and Indu tries; Commonwealth of Massachusetts D. Long, Security Group Leader The Honorable Edward J. Markey The Honorable Edward P. Kirby The Honorable Peter V. Forman The Honorable Edward M. Kennedy The Honorable Lawrence R. Alexander The Honorable Nicholas J. Costello B. McIntyre Chairman, Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Plymouth Civil Defense Director D. Tibbetts, Acting Massachusetts Secretary of Energy Resources Sarah Woodhouse, legislative Assistant A. Nogee, MASSPIRG J. W. McCormack, FEMA Regional Administrator Public Document Room (POR) tocal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts, SLO Designee bec :
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
T. Martin, RA J. Joyner, DRSS J. Johnson, DRP J. Roggee, DRP L
R. Wessman, NRR R. Eaton, NRR J. Macdonald, SRI - Pilgrim (with concurrences)
M. Conner, SALP Reports Only K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports 1 J. Caldwell,'EDO R..Wessman, NRR R D SS-RI:DRSS RI S
'RI:
S-'
RI RSS-Albert /mk Della Ratta King Keimig-Jo er i
10hA/90 10/o//90 10/*/90
.10/.2. /90 - -
10
-i 0FFICIAL RECORD COPY FFDBE-0002.1.0(0/90
-10/01/90-
- l