March 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR PILGRIM NUCLEAR POWER STATION (REPORT 05000293/2014001)
Dear Mr. Dent:
On February 9, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Pilgrim Nuclear Power Station (Pilgrim). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
On December 31, 2014, performance at Pilgrim was within the Degraded Cornerstone Column of the NRCs Reactor Oversight Process (ROP) Action Matrix due to two White PIs related to scrams in the Initiating Events cornerstone. The NRC determined the performance at Pilgrim during the most recent quarter remained in the Degraded Cornerstone Column of the NRCs ROP Action Matrix because two parallel White findings were opened in the Initiating Events cornerstone due to the objectives of Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, not being met for the two White PIs. The results of the 95002 inspection were issued on January 26, 2015 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML15026A069).
Since both of the White PIs have returned to Green in the first and third quarters of 2014 respectively, the parallel White findings will become effective during the quarter that the PIs returned to Green. These two White parallel inspection findings will not be removed from consideration in the NRCs assessment program until the identified weaknesses are addressed and corrected. The NRC will plan to resume the supplemental inspection, in accordance with Inspection Procedure 95002, after you have notified the NRC of your readiness. Specifically, this inspection will verify that Entergy has taken action to: (1) address the specific deficiencies in execution of corrective actions; (2) address the deficient cause evaluation; and (3) understand why corrective actions intended to address the identified corrective action program (CAP)
implementation weakness were not effective at ensuring the inspection objectives were satisfied. Additionally, the NRC will continue to assess the effectiveness and sustainability of your efforts to address challenges in CAP implementation during the next biennial problem identification and resolution inspection, scheduled for August 2015. Additionally on January 27, 2015, Pilgrim experienced a scram with complications due to a loss of both 345kV offsite electrical sources during a winter storm. On February 2, the NRC initiated a Special Inspection Team to inspect the performance of your operating crews and safety systems during the event. The results of this inspection have not yet been finalized but will be published in Inspection Report 05000293/2015007.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Raymond McKinley at (610)337-5150 with any questions you have regarding this letter.
Sincerely,
/RA/
Daniel H. Dorman Regional Administrator
Docket No.
50-293 License No. DPR-35
Enclosure:
Pilgrim Inspection/Activity Plan
cc w/encl:
Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/ORA
NAME JDeBoer/JPD RMcKinley/RRM HNieh/HKN DDorman/DHD
DATE 02/24/15 02/24/15 02/25/15 03/02/15
Page 1 of 2 01/06/2015 10:05:33 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Pilgrim Inspection / Activity Plan 01/01/2015 - 06/30/2016 ISFSI
- INITIAL LOADING INSPECTION
1 IP Operation Of An ISFSI 60855 01/05/2015 01/09/2015
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 01/05/2015 01/09/2015 71124
- 01 EXPOSURE CONTROL 02 ALARA
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/02/2015 03/05/2015
IP Occupational ALARA Planning and Controls 71124.02 03/02/2015 03/05/2015 EP
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 03/16/2015 03/20/2015
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/16/2015 03/20/2015
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/16/2015 03/20/2015 7111108G
- INSERVICE INSPECTION
1 IP Inservice Inspection Activities - BWR 7111108G 04/20/2015 04/24/2015 71124
- 01 EXPOSURE 02 ALARA 03 AIRBORNE 04 DOSE
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/04/2015 05/08/2015
IP Occupational ALARA Planning and Controls 71124.02 05/04/2015 05/08/2015
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/04/2015 05/08/2015
IP Occupational Dose Assessment 71124.04 05/04/2015 05/08/2015 71124.08
- RADWASTE
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/08/2015 06/12/2015 71124
- RADIOACTIVE EFFLUENT CONTROL RETS
1 IP Radiation Monitoring Instrumentation 71124.05 06/29/2015 07/03/2015
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/29/2015 07/03/2015 71124
- REMP
1 IP Radiological Environmental Monitoring Program 71124.07 07/20/2015 07/23/2015 PI&R
- PI&R - BIENNIAL
1 IP Problem Identification and Resolution 71152B 08/03/2015 08/07/2015
IP Problem Identification and Resolution 71152B 08/17/2015 08/21/2015 7111111B
- REQUAL INSP W/ P/F RESULTS
1 IP Licensed Operator Requalification Program 7111111B 10/19/2015 10/23/2015 TRI FI
- TRIENNIAL FIRE PROTECTION INSPECTION
1 IP Fire Protection [Triennial]
7111105T 11/02/2015 11/06/2015
IP Fire Protection [Triennial]
7111105T 11/16/2015 11/20/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 01/06/2015 10:05:33 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Pilgrim Inspection / Activity Plan 01/01/2015 - 06/30/2016 71151
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/16/2015 11/19/2015
IP Occupational ALARA Planning and Controls 71124.02 11/16/2015 11/19/2015
IP Performance Indicator Verification 71151 11/16/2015 11/19/2015 71124
- 01 EXPOSURE CONTROL
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/21/2016 03/24/2016 71124
- 02 ALARA
1 IP Occupational ALARA Planning and Controls 71124.02 03/21/2016 03/25/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure