Text
,-
-
-- ;
-
g ------ -- --
p . og
a
"';g.-
. ..
L
.
...o
..
E.
SEP 0 71989
Docket.No.150-293..
Boston Edison-Company.
ATTN: Mr. Ralph.G., Bird
,
-Senior Vice. President-Nuclear
. Rocky Hill Road
Plymouth, Massachusetts 02360
Gentlemen:
.
Subject: NRC Region.I Inspection Report No. 50-293/89-07
This refers to-the inspection conducted by the NRC Restart Staff on May 25
through July 10, 1989 at the Pilgrim Nuclear Power. Station, Plymouth, Massa-
chusetts. Areas' examined during this inspection are described in the.NRC
Region ~I. Inspection Report which is enclosed with this letter.
The Restart' Staff, through selected around-the-clock shift inspections and rou-
tine. program inspections, observed management controls, conduct of operations
and startup testing activities of the licensee's Power Ascension Test-Program.
Results of the NRC Restart Staff inspections and assessments are taken into-
consideration by the NRC Restart Assessment Panel during ongoing licensee.per-
formance reviews and ' deliberations at each Power Ascension Test Program ap-
proval point.
The Restart Staff has concluded that overall plant operations were conducted
in a safety-conscious manner. The Restart Staff has determined that your con-
' duct and control of the first phase of the Shutdown from Outside the Control
Room test was excellent.
However, our inspection also noted that several of your activities were not
conducted in accordance with NRC requirements as set forth in the Notice of
Violation, Appendix A, enclosed herein. These violations have been categorized
by severity level in accordance with the revised NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (Enforcement Policy
1988). You are required to respond to this letter and in preparing your re-
sponse, jou should follow the instructions in Appendix A.
The response directed by this letter and the accompanying notice are not sub-
ject.to the clearance procedures of the Office of Management and Budget as re-
quired by the Paperwork Reduction Act of 1980, PL 96-511.
i
t
OFFICIAL RECORD COPY IR PILGRIM 89-07 - 0001.0.0
/
08/22/89
(
8909210226 890907
f
ADOCK 05000293
Q
_ _ _ _ _ _ _ _ _
.
.
..J
c
1 -
.
'.
4
'
.,
m
~ Boston Edison Company.
2
-
,
,7
- Your. cooperation with'us in this matter is appreciated.
Sincerely,
'
i-
Original Signed By:
Samuel J. Collins, Deputy Director
,
Division of Reactor Projects
Enclosures:
'1.
_ Appendix A, Notice'of Violation
2.
NRC. Region I~ Inspection Report No. 50-293/89-07 w/ attachments
cc w/ enc 1s:
'K. Highfill, Station Director
R. Anderson, Plant Manager
J. Dietrich, Licensing Division Manager
E. Robinson, Nuclear-Information Manager
R. Swanson, Nuclear Engineering Department Manager
The Honorable John F. Kerry
The Honorable Edward J.'Markey
.The Honorable Edward-P. Kirby
The Honorable Peter V. Forman
The Honorable Nicholas J. Costello
>The' Honorable Lawrence R. Alexander
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
P. Agnes,' Assistant Secretary of Public Safety, Commonwealth of Massachusetts
S. Pollard, Massachusetts Secretary of Energy Resources
R. Shimshak, MASSPIRG
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
i
0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0002.0.0
08/22/89
e
-
-
- - _ _ - - - . - - . - - -
_ _ - - _ - _ _ - -
,
m . .
.
-
---
-
-
,
,
,,
,
"
4.
f.
Boston' Edison Company
3'
SEP e 7 igeg
bec w/encls:.
Region I. Docket Room (with concurrences)
- Management Assistant, DRMA (w/o encis)
W. Russell, RI
- T.. Martin,' RI
W. Kane, RI
- B. Boger,'RI-
M. Knapp, RI
.,J. Johnson, RI
S. Collins, RI
J. Johnson, RI.
R.tBlough, RI.
R; Bellamy,.RI
J. Durr,' RI.
R..Gallo, RI
R.. Bores, RI (See Paragraph 8.0)-
M. Miller, RI
K. Abraham, RI
- P. Eapen, RI
J. Golla, RI
R. Wessman, NRR
. D. Mcdonald, NRR
R. Hernan, NRR.
- J. Hayes, NRR
L. Zerr, NRR
. S. Pu11ani, RI
C. Warren, SRI - Arkansas Nuclear One
C. Marschall, SRI'- Pilgrim Station
T. Kim, RI.- Pilgrim Station
C. Carpenter, RI - Pilgrim Station
. G. Bethke, NRC Contractor
- R. Keimig, RI (See Paragraph 7.0)
(t.hteoqh)
l.
RI-
RI RP
RI
P
P
/ dt.
.R
y.
JJohnson
ns
f
C
~-
a
h/ /89
8/7789
8/22/89
8/D/89
b
0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0003.0.0
08/22/89
I
1
l
_
___- ________ ___
- _ -
'