ML20247K666

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-293/89-07 on 890525-0710 & Notice of Violation
ML20247K666
Person / Time
Site: Pilgrim
Issue date: 09/07/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20247K670 List:
References
NUDOCS 8909210226
Download: ML20247K666 (3)


See also: IR 05000293/1989007

Text

,-

-

-- ;

-

g ------ -- --

p . og

a

"';g.-

. ..

L

.

...o

..

E.

SEP 0 71989

Docket.No.150-293..

Boston Edison-Company.

ATTN: Mr. Ralph.G., Bird

,

-Senior Vice. President-Nuclear

. Rocky Hill Road

Plymouth, Massachusetts 02360

Gentlemen:

.

Subject: NRC Region.I Inspection Report No. 50-293/89-07

This refers to-the inspection conducted by the NRC Restart Staff on May 25

through July 10, 1989 at the Pilgrim Nuclear Power. Station, Plymouth, Massa-

chusetts. Areas' examined during this inspection are described in the.NRC

Region ~I. Inspection Report which is enclosed with this letter.

The Restart' Staff, through selected around-the-clock shift inspections and rou-

tine. program inspections, observed management controls, conduct of operations

and startup testing activities of the licensee's Power Ascension Test-Program.

Results of the NRC Restart Staff inspections and assessments are taken into-

consideration by the NRC Restart Assessment Panel during ongoing licensee.per-

formance reviews and ' deliberations at each Power Ascension Test Program ap-

proval point.

The Restart Staff has concluded that overall plant operations were conducted

in a safety-conscious manner. The Restart Staff has determined that your con-

' duct and control of the first phase of the Shutdown from Outside the Control

Room test was excellent.

However, our inspection also noted that several of your activities were not

conducted in accordance with NRC requirements as set forth in the Notice of

Violation, Appendix A, enclosed herein. These violations have been categorized

by severity level in accordance with the revised NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (Enforcement Policy

1988). You are required to respond to this letter and in preparing your re-

sponse, jou should follow the instructions in Appendix A.

The response directed by this letter and the accompanying notice are not sub-

ject.to the clearance procedures of the Office of Management and Budget as re-

quired by the Paperwork Reduction Act of 1980, PL 96-511.

i

t

OFFICIAL RECORD COPY IR PILGRIM 89-07 - 0001.0.0

/

08/22/89

(

8909210226 890907

f

PDR

ADOCK 05000293

Q

PDC

_ _ _ _ _ _ _ _ _

.

.

..J

c

1 -

.

'.

4

'

.,

m

~ Boston Edison Company.

2

-

,

,7

- Your. cooperation with'us in this matter is appreciated.

Sincerely,

'

i-

Original Signed By:

Samuel J. Collins, Deputy Director

,

Division of Reactor Projects

Enclosures:

'1.

_ Appendix A, Notice'of Violation

2.

NRC. Region I~ Inspection Report No. 50-293/89-07 w/ attachments

cc w/ enc 1s:

'K. Highfill, Station Director

R. Anderson, Plant Manager

J. Dietrich, Licensing Division Manager

E. Robinson, Nuclear-Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable John F. Kerry

The Honorable Edward J.'Markey

.The Honorable Edward-P. Kirby

The Honorable Peter V. Forman

The Honorable Nicholas J. Costello

>The' Honorable Lawrence R. Alexander

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

P. Agnes,' Assistant Secretary of Public Safety, Commonwealth of Massachusetts

S. Pollard, Massachusetts Secretary of Energy Resources

R. Shimshak, MASSPIRG

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

i

0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0002.0.0

08/22/89

e

-

-

- - _ _ - - - . - - . - - -

_ _ - - _ - _ _ - -

,

m . .

.

-

---

-

-

,

,

,,

,

"

4.

f.

Boston' Edison Company

3'

SEP e 7 igeg

bec w/encls:.

Region I. Docket Room (with concurrences)

- Management Assistant, DRMA (w/o encis)

W. Russell, RI

- T.. Martin,' RI

W. Kane, RI

B. Boger,'RI-

M. Knapp, RI

.,J. Johnson, RI

S. Collins, RI

J. Johnson, RI.

R.tBlough, RI.

R; Bellamy,.RI

J. Durr,' RI.

R..Gallo, RI

R.. Bores, RI (See Paragraph 8.0)-

M. Miller, RI

K. Abraham, RI

- P. Eapen, RI

J. Golla, RI

R. Wessman, NRR

. D. Mcdonald, NRR

R. Hernan, NRR.

- J. Hayes, NRR

L. Zerr, NRR

. S. Pu11ani, RI

C. Warren, SRI - Arkansas Nuclear One

C. Marschall, SRI'- Pilgrim Station

T. Kim, RI.- Pilgrim Station

C. Carpenter, RI - Pilgrim Station

. G. Bethke, NRC Contractor

- R. Keimig, RI (See Paragraph 7.0)

(t.hteoqh)

l.

RI-

RI RP

RI

P

P

/ dt.

.R

y.

JJohnson

ns

f

C

~-

a

h/ /89

8/7789

8/22/89

8/D/89

b

0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0003.0.0

08/22/89

I

1

l

_

___- ________ ___

- _ -

'