Forwards Insp Rept 50-293/89-01 on 890206-0310 & Notice of Violation
ML20245H955
Person / Time
Site: Pilgrim
Issue date: 04/26/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20245H958 List:
References
NUDOCS 8905030594
Download: ML20245H955 (3)


See also: IR 05000293/1989001

Text

_ _ _ _

. _ - -

$f

.

+

%, p.

,.=

)

,_

,

%

APR 2 61989

!

Docket No. 50-293

f

Boston Edison Company

ATTN: Mr. Ralph G. Bird

Senior Vice President - Nuclear

RFD #1 Rocky Hill Road

Plymouth, Massachusetts 0236

, Gentlemen:

Subjecti NRC Region I Inspection Report No. 50-273/89-01

This refers to the inspection (50-293/89-01) conducted by the NRC Restart Staff

from February 6 through March 10, 1989, at the Pilgrim Nuclear Power Station,

Plymouth, Massachusetts. Areas examined during this inspection are described

in the NRC Region I Inspection Report which is enclosed ' with this letter.

The Restart Staff, through selected around-the-clock shift inspections and rr,u-

tine program inspections, observed management controls, conduct of operations,

and startup testing activities during the initial phase of the licensee's Power

Ascension Test Program.

Based on these reviews conducted per the NRC's

inspection plan specifically developed to cover this period, the Restart Staff

' determined that licensee management'provided active and' effective oversight and

. was. directly involved in assuring safe operation.

Results of the NRC Restart

Staff . inspections and assessments are taken into consideration by the NRC

Restart- Assessment Panel during ongoing deliberations at each Power Ascension

Test Program approval point.

Our inspection concluded that one of your activities was not conducted in

accordance with NRC requirements as set forth in the Notice of Violation,

Appendix A, enclosed herein.

The violation has been categorized by severity

level in accordance with the revised NAC Enforcement Policy (10 CFR 2, Appendix

C) published in the Federal Register Notice (Enforcement Policy 1988). You are

required to respond to this letter and in preparing your response, you should

follow the instructions in Appendix A.

The response directed by this letter and the accompanying notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

i

0FFICIAL RECORD COPY IR PILGRIM 50-293/89-01 - 0001.0.0

.

8905030394 890426

m

PDR- ADOCK 05000293

.

'

G'

PDC

____

_ - . - _ - _ _ - - _ _

_

- -

- - - - - - - - - - -

- -

- - -

_ _ _ _ _ -

.

f<

Boston Edison Company

2

APR 2 61989

Your cooperation with us in this matter is appreciated.

Sincerely,

I

(kigine! S%d Pv

s

Samuel J. Collins, Deputy Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Region I Inspection Report No. S0-293/89-01 w/ Attachments

cc w/encls:

K. Highfill, Station Director

R. Anderson, Plant Manager

J. Keyes, Licensing Division Manager

E. Robinson, Nuclear Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

The Honorable Peter V. Forman

The Honorable Nicholas J. Costello

The Honorable Lawrence R. Alexander

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts

S. Pollard, Massachusetts Secretary of Energy Resources

R. Shimshak, MASSPIRG

Public Document Room (PDR)

)

Local Public Document Room (LPDR)

i

Nuclear Safety Information Center (NSIC)

{

NRC Resident Inspector

"

Commonwealth of Massachusetts (2)

l

J

l

OFFICIAL RECORD COPY IR PILGRIM 50-293/89-01 - 0002.0.0

04/21/89

- _ _ _ _ _ _

_

..

. _ -

..

t

,

4

Boston Edison Company

3

APR 2 61989

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

W. Russell, RA

W. Kane, DRP

S. Collins, DRP

T. Martin, DRS

M. Knapp, DRSS

J. Wiggins, DRP

J. Durr, DRP

E. Wenzinger, DRP

R. Blough, DRP

J. Lyash, DRP

M. Kohl, DRP

P. Wilson, DRP

N. Dudley, DRP

C. Warr'n, SRI - Pilgrim

f. Kim, RI - Pilgrim

R. Gallo, DRS

A. Ho.s , DRS

T. Reti lowski, DRS

M. Dev, DRS

P. Drysdale, DRS

R. Bellamy, DRSS

W. Pasciak, DRSS

R. Bores, DRSS

G. Smith, DRSS

W. Olsen, DRSS

J. Furia, DRSS

R. Winters, DRSS

M. Miller, SLO

K. Abraham, PA0

R. Latta, RI - Comanche Peak

B. Boger, NRR

R. Wessman, NRR

I

D, Mcdonald, NRR

l

f

RI:DRP

RI:DRP

RI:DRSS

RJ:DRP

JQ

CWarren/mjd

RBlough

fAWPasciak

SdWiggins

ns

.,4,

>

.ini ,

. , , , , ,

. a ,,,

. ,,,,

1

0FFICIAL RECORD COPY IR PILGRIM 50-293/89-01 - 0003.0.0

04/21/89