ML20245H955
| ML20245H955 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/26/1989 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bird R BOSTON EDISON CO. |
| Shared Package | |
| ML20245H958 | List: |
| References | |
| NUDOCS 8905030594 | |
| Download: ML20245H955 (3) | |
See also: IR 05000293/1989001
Text
_ _ _ _
. _ - -
$f
.
+
%, p.
,.=
)
,_
,
%
APR 2 61989
!
Docket No. 50-293
f
Boston Edison Company
ATTN: Mr. Ralph G. Bird
Senior Vice President - Nuclear
RFD #1 Rocky Hill Road
Plymouth, Massachusetts 0236
, Gentlemen:
Subjecti NRC Region I Inspection Report No. 50-273/89-01
This refers to the inspection (50-293/89-01) conducted by the NRC Restart Staff
from February 6 through March 10, 1989, at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts. Areas examined during this inspection are described
in the NRC Region I Inspection Report which is enclosed ' with this letter.
The Restart Staff, through selected around-the-clock shift inspections and rr,u-
tine program inspections, observed management controls, conduct of operations,
and startup testing activities during the initial phase of the licensee's Power
Ascension Test Program.
Based on these reviews conducted per the NRC's
inspection plan specifically developed to cover this period, the Restart Staff
' determined that licensee management'provided active and' effective oversight and
. was. directly involved in assuring safe operation.
Results of the NRC Restart
Staff . inspections and assessments are taken into consideration by the NRC
Restart- Assessment Panel during ongoing deliberations at each Power Ascension
Test Program approval point.
Our inspection concluded that one of your activities was not conducted in
accordance with NRC requirements as set forth in the Notice of Violation,
Appendix A, enclosed herein.
The violation has been categorized by severity
level in accordance with the revised NAC Enforcement Policy (10 CFR 2, Appendix
C) published in the Federal Register Notice (Enforcement Policy 1988). You are
required to respond to this letter and in preparing your response, you should
follow the instructions in Appendix A.
The response directed by this letter and the accompanying notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
i
0FFICIAL RECORD COPY IR PILGRIM 50-293/89-01 - 0001.0.0
.
8905030394 890426
m
PDR- ADOCK 05000293
.
'
G'
____
_ - . - _ - _ _ - - _ _
_
- -
- - - - - - - - - - -
- -
- - -
_ _ _ _ _ -
.
f<
Boston Edison Company
2
APR 2 61989
Your cooperation with us in this matter is appreciated.
Sincerely,
I
(kigine! S%d Pv
s
Samuel J. Collins, Deputy Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Region I Inspection Report No. S0-293/89-01 w/ Attachments
cc w/encls:
K. Highfill, Station Director
R. Anderson, Plant Manager
J. Keyes, Licensing Division Manager
E. Robinson, Nuclear Information Manager
R. Swanson, Nuclear Engineering Department Manager
The Honorable Edward J. Markey
The Honorable Edward P. Kirby
The Honorable Peter V. Forman
The Honorable Nicholas J. Costello
The Honorable Lawrence R. Alexander
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts
S. Pollard, Massachusetts Secretary of Energy Resources
R. Shimshak, MASSPIRG
Public Document Room (PDR)
)
Local Public Document Room (LPDR)
i
Nuclear Safety Information Center (NSIC)
{
NRC Resident Inspector
"
Commonwealth of Massachusetts (2)
l
J
l
OFFICIAL RECORD COPY IR PILGRIM 50-293/89-01 - 0002.0.0
04/21/89
- _ _ _ _ _ _
_
..
. _ -
..
t
,
4
Boston Edison Company
3
APR 2 61989
bec w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
W. Russell, RA
W. Kane, DRP
S. Collins, DRP
T. Martin, DRS
M. Knapp, DRSS
J. Wiggins, DRP
J. Durr, DRP
E. Wenzinger, DRP
R. Blough, DRP
J. Lyash, DRP
M. Kohl, DRP
P. Wilson, DRP
N. Dudley, DRP
C. Warr'n, SRI - Pilgrim
f. Kim, RI - Pilgrim
R. Gallo, DRS
A. Ho.s , DRS
T. Reti lowski, DRS
M. Dev, DRS
P. Drysdale, DRS
R. Bellamy, DRSS
W. Pasciak, DRSS
R. Bores, DRSS
G. Smith, DRSS
W. Olsen, DRSS
J. Furia, DRSS
R. Winters, DRSS
M. Miller, SLO
K. Abraham, PA0
R. Latta, RI - Comanche Peak
B. Boger, NRR
R. Wessman, NRR
I
D, Mcdonald, NRR
l
f
RI:DRP
RI:DRP
RI:DRSS
RJ:DRP
JQ
CWarren/mjd
RBlough
fAWPasciak
SdWiggins
ns
.,4,
>
.ini ,
. , , , , ,
. a ,,,
. ,,,,
1
0FFICIAL RECORD COPY IR PILGRIM 50-293/89-01 - 0003.0.0
04/21/89
i
l
- - _ _ _ _ .
._