Forwards Insp Rept 50-293/89-05 on 890311-0410.Weaknesses Noted Re Evaluation of Failure Rate & Root Causes for Failures of Airlock Doors & Interlocks
ML20245A537
Person / Time
Site: Pilgrim
Issue date: 06/09/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20245A540 List:
References
NUDOCS 8906220054
Download: ML20245A537 (3)


See also: IR 05000293/1989005

Text

JUN 0 91989

)

1

f

Docket No. 50-293

Boston Edison Company.

ATTN: Mr. Ralph G. Bird

Senior Vice President-Nuclear

RFD #1 Rocky Hill Road

Plymouth, Massachusetts 02360

1

Gentlemen:

Subject: NRC Region I Inspection Report No. 50-293/89-05

This refers to the inspection conducted by the NRC Restart Staff on March 11

!

through April 10, 1989, at the Pilgrim Nuclear. Power Station,- Plymouth ,'

(

Massachusetts. Areas examined during th'

inspection are described in the NRC

Region I Inspection Report which is enclosed with this letter.

]

The Restart Staff, through selected around-the-clock shift inspections and rou-

f

tine program inspections, observed management controls, conduct of operations,

and startup testing activities during the 5 to 25% power plateau of the licen-

see's Power Ascension Test - Program. Based 'on these reviews conducted per the-

NRC inspection plan specifically developed to cover this period, the Restart

Staff determined that licensee management provided active and effective over-

sight and was directly involved in assuring safe operation.

Results of the NRC Restart Staff inspections and assessments are taken into

consideration by the NRC Restart Assessment Panel during ongoing licensee

performance reviews and deliberations at each Power - Ascension Test Program

approval point.

Sincerely,

&21 S%ngg y

Samuel J. Collins, Deputy. Director

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-293/89-05

8906220054 890609

PDR

ADOCK 05000293

G

PNU

\\

OFFICIAL RECORD COPY IR PILGRIM 50-293/89-05 - 0001.0.0'

- D'

05/22/89

1

ll1

-_

-_ -

- ___

.

-

_

--

4

'

.

Boston Edison Company

2

JUN 0 91989

cc w/ encl:

K. Highfill, Station Director

R. Anderson, Plant Manager

J. Keyes, Licensing Divisi:.n Manager

E. Robinson, Nuclear Information Manager

,

R. Swanson, Nuclear Engineering Department Manager

The Honorable Edward J. Markey

{

The Honorable Edward P. Kirby

i

The Honorable. Peter V. Forman

i

The Honorable Nicholas J. Costello

j

The Honorable Lawrence R. Alexander

4

B. McIntyre, Chairman, Department of Public Utilities

,

Chairman, Plymouth Board of Selectmen

/

Chairman, Duxbury Board of Selectmen

!

Plymouth Civil Defense Director

i

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts

S. Pollard, Massachusetts Secretary of Energy Resources

R. Shimshak, MASSPIRG

Public Document Room (PDR)

Local Public Document Room (LPDR)

i

Nuclear Safety Information Center (NSIC)

'

NRC Resident Inspector

Commor. wealth of Massachusetts (2)

I

l

!

l

0FFICIAL RECORD COPY IR PILGRIM 50-293/89-05 - 0002.0.0

05/22/89

--

3

(

_o

.4

MN 0 9198

Boston Edison Company

3

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

)

W. Russell, RI.

J

W. Kane, RI-

T. Martin, RI

M. Knapp, RI

S. Collins, RI

J. Wiggins, RI

R. Blough, RI

l

R. Bellamy, RI

.

J. Durr, RI

j

R. Gallo, RI

'

E. Wenzinger, RI

.R. Bores, RI

l

M. Miller, RI

K. Abraham, RI

J. Lyash, RI

M. Kohl, RI

R. Conte, RI

N. Blumberg, RI

N. Conicella, RI

M. Dev, RI

T. Dragoun, RI

A. Howe. RI

T. Rebelow:,ki, RI

1

B. Boger, NRR

R. Wessman, NRR

D. Mcdonald, NRR.

.]

T. Ross, NRR

j

G. Thomas, NRR

C. Warren, SRI - Pilgrim

T. Kim, RI - Pilgrim

C. Carpenter, RI - Pilgrim

R. Laura, RI - Nine Mile

G. Bethke, NRC Contractor

4

G. Bryan, NRC Contractor

i

F. McManus, NRC Contractor

.I

R. Starkey, RII

I

k

R :DRP

RI:DRP'

RI:DRP

.

P-

-

cwa rren/mjd '

RBlough

JWi gins

.

ollins

i

b

5/17/89

//89

/89

.Er/3 /89

0FFICIAL RECORD COPY IR . PILGRIM 50-293/89-05 - C903.0.0

05/30/89

)