JUN 0 91989
)
1
f
Docket No. 50-293
Boston Edison Company.
ATTN: Mr. Ralph G. Bird
Senior Vice President-Nuclear
RFD #1 Rocky Hill Road
Plymouth, Massachusetts 02360
1
Gentlemen:
Subject: NRC Region I Inspection Report No. 50-293/89-05
This refers to the inspection conducted by the NRC Restart Staff on March 11
!
through April 10, 1989, at the Pilgrim Nuclear. Power Station,- Plymouth ,'
(
Massachusetts. Areas examined during th'
inspection are described in the NRC
Region I Inspection Report which is enclosed with this letter.
]
The Restart Staff, through selected around-the-clock shift inspections and rou-
f
tine program inspections, observed management controls, conduct of operations,
and startup testing activities during the 5 to 25% power plateau of the licen-
see's Power Ascension Test - Program. Based 'on these reviews conducted per the-
NRC inspection plan specifically developed to cover this period, the Restart
Staff determined that licensee management provided active and effective over-
sight and was directly involved in assuring safe operation.
Results of the NRC Restart Staff inspections and assessments are taken into
consideration by the NRC Restart Assessment Panel during ongoing licensee
performance reviews and deliberations at each Power - Ascension Test Program
approval point.
Sincerely,
&21 S%ngg y
Samuel J. Collins, Deputy. Director
Division of Reactor Projects
Enclosure:
NRC Region I Inspection Report No. 50-293/89-05
8906220054 890609
ADOCK 05000293
G
PNU
\\
OFFICIAL RECORD COPY IR PILGRIM 50-293/89-05 - 0001.0.0'
- D'
05/22/89
1
ll1
-_
-_ -
- ___
.
-
_
--
4
'
.
Boston Edison Company
2
JUN 0 91989
cc w/ encl:
K. Highfill, Station Director
R. Anderson, Plant Manager
J. Keyes, Licensing Divisi:.n Manager
E. Robinson, Nuclear Information Manager
,
R. Swanson, Nuclear Engineering Department Manager
The Honorable Edward J. Markey
- {
The Honorable Edward P. Kirby
i
The Honorable. Peter V. Forman
i
The Honorable Nicholas J. Costello
j
The Honorable Lawrence R. Alexander
4
B. McIntyre, Chairman, Department of Public Utilities
,
Chairman, Plymouth Board of Selectmen
/
Chairman, Duxbury Board of Selectmen
!
Plymouth Civil Defense Director
i
P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts
S. Pollard, Massachusetts Secretary of Energy Resources
R. Shimshak, MASSPIRG
Public Document Room (PDR)
Local Public Document Room (LPDR)
i
Nuclear Safety Information Center (NSIC)
'
NRC Resident Inspector
Commor. wealth of Massachusetts (2)
I
l
!
l
0FFICIAL RECORD COPY IR PILGRIM 50-293/89-05 - 0002.0.0
05/22/89
--
3
(
_o
.4
MN 0 9198
Boston Edison Company
3
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
)
W. Russell, RI.
J
W. Kane, RI-
T. Martin, RI
M. Knapp, RI
S. Collins, RI
J. Wiggins, RI
R. Blough, RI
l
R. Bellamy, RI
.
J. Durr, RI
j
R. Gallo, RI
'
E. Wenzinger, RI
.R. Bores, RI
l
M. Miller, RI
K. Abraham, RI
J. Lyash, RI
M. Kohl, RI
R. Conte, RI
N. Blumberg, RI
N. Conicella, RI
M. Dev, RI
T. Dragoun, RI
A. Howe. RI
T. Rebelow:,ki, RI
1
B. Boger, NRR
R. Wessman, NRR
D. Mcdonald, NRR.
.]
T. Ross, NRR
j
G. Thomas, NRR
C. Warren, SRI - Pilgrim
T. Kim, RI - Pilgrim
C. Carpenter, RI - Pilgrim
R. Laura, RI - Nine Mile
G. Bethke, NRC Contractor
4
G. Bryan, NRC Contractor
i
F. McManus, NRC Contractor
.I
R. Starkey, RII
I
k
R :DRP
RI:DRP'
RI:DRP
.
P-
-
cwa rren/mjd '
RBlough
JWi gins
.
ollins
i
b
5/17/89
//89
/89
.Er/3 /89
0FFICIAL RECORD COPY IR . PILGRIM 50-293/89-05 - C903.0.0