Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function
ML20217D559
Person / Time
Site: Pilgrim
Issue date: 10/05/1999
From: Alexander J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ENGC-2.99.103, NUDOCS 9910180012
Download: ML20217D559 (3)


Text

l .T l ,a l #

\

v Enttrgy Nuclur Grnsrution Company

l. Pilgnm Nuclear Power Station l 600 Rocky Hill Road Plyrnouth, MA 02360
    • *** J. F. Alexander Drector Nuclear Assessment I

October 5,1999 ENGC Ltr. 2.99.103 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35

Subject:

' Five Year Main Breakwater Monitoring Report

.Teferences: 1. BECo letter from Mr. A.V. Morisi to Mr. T.A. Ippolito dated March 30,1981 l (BECo 81-67)

2. BECo letter from Mr W.D. Harrington to Mr. D.B. Vassallo dated July 7,1983 (BECo 83-176)
3. ' NRC letter from Mr.'J.A. Zwolinski to Mr. W.D. Harrington dated March 25, 1986
4. BECo letter from Mr. R.G. Bird to USNRC dated January 15,1990 This letter documents Pilgrim Nuclear Power Station's five year survey of its main breakwater.

This submittal fulfills the commitment made in Reference 1, as modified by Reference 2,3, and 4 to submit such documentation.

The survey was performed by a surveyor registered in the State of Massachusetts and includes the seaward and landward sides of the main breakwater as well as a topographical l survey. The survey has determined that Pilgrim's main breakwater is intact and remains adequately constructed to perform its designed safety function.

The information used in making this determination is available at our offices at Pilgrim Nuclear ,

Power Station should you wish to review it. Should you require further information on this issue, please contact Mr. P.M. Kahler at (508) 830-7939.

{

Sincerely, l!DOf

.ya~@

nde( a, #

. PMK/sc cc: See next page hhl gg g l I 9910100012 991005 <

PDR- ADOCK 05000293:

, P PDR a

~

e ENGC Ltr. 2.99.103 Page 2

..- ,4 cc: Mr. Alan B. Wang, Project Manager Project Directorate 1-3 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop: OWF 8F2 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station 1

l m,n

1 4- - 1 To: S Brennion s From: T F White gg h a Date:~ September 28,1999

Subject:

MAIN BREAKWATER MONITORING PROGRAM

Reference:

(A) NE 8.01 The Mechanical / Civil Department has reviewed the results of the 1999 Main Bi *akwater photos and surveys. Since the last photo / survey was completed (1994) and the recommended repairs ,

completed in 1998, the breakwater has held up very well and has not experienced damage that i prevents the structure from performing its design functions.

This notification and our review are in accordance with reference A. Please forward the results of this assessment to NRC in accordance with the previous Main Breakwater assessments.

The 1999 photos and nepe".

  • will be filed in the vault in the O&M Building for retention. The l revised drawing , C1181 . 9 * , captured in the design control system.