December 22,1998
>
Mr. Theodore A. Sullivan
l
Vice President Nuclear and Station Director
i
BEC Energy
l
Pilgrim Nuclear Power Station
l
600 Rocky Hill Road
Plymouth, Massachusetts 02360-5599
!
SUBJECT:
PILGRIM INTEGRATED INSPECTION REPORT 50-293/98-10
Dear Mr. Sullivan:
On December 8,1998, the NRC completed an inspection at the Pilgrim Nuclear Power
Station in Plymouth, Massachusetts. The enclosed report presents the results of that
inspection.
I
During the seven weeks covered by this inspection period, the conduct of activities at the
Pilgrim facility was characterized by safe plant operations. This was evident by good
planning and execution during a down power evolution to conduct a control rod pattern
exchange and several surveillance activit!es. NRC regional specialists reviewed your
emergency preparedness (EP) and fire protection (FP) programs. The EP program was
found to be wellimplemented. Your EP response capability was maintained in a good state
of readiness. With respect to Fire Protection, we noted that internal reviews had resulted
in program improvement. Your efforts in this area were considered positive initiative.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
Your cooperation with us is appreciated.
I
Sincerely,
J
Original Signed By:
Curtis Cowgill, Chief
Reactor Projects Branch No. 5
Division of Reactor Projects
/
j
t
Docket No.: 50-293
License No.: DPR-35
{
l
Enclosure:
1. Inspection Report 50-293/98-10
i
05011n
h$
'
9901050115 981222
I
ADOCK 05000293
.
O
I
,
l
,
!
i
~. .
--
. - . . ..
- . . -
..
- -
..
. -
. .
. - . - - . -
. . _ _
,-
s
Mr. T. Sullivan
2
cc w/ encl:
R. Ledgett, Executive Vice President - Operations
J. Alexander, Master Process Owner-Nuclear Assessment
J. Fulton, Assistant General Counsel
D. Tarantino, Nuclear Information Manager
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
The Honorable Therese Murray
The Honorable Joseph Gallitano
T. MacGregor, Mass. Dept. Of Public Comm. & Energy
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Chairman, Nuclear Matters Committee
Plymouth Civil Defense Director
P. Gromer, Massachusetts Secretary of Energy Resources
J. Miller, Senior issues Manager
J. Fleming
A. Nogee, MASSPIRG
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering
Office of the Attorney General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety
Chairman, Citizens Urging Responsible Energy
Commonwealth of Massachusetts, SLO Designee
p
,
.
.
-
- - .
_ _ _
_
-- .
- _ _ _ _
.
__
_
_
__
_
. . _ .
.
.
1
!
!
l
l
Mr. T. Sullivan
3
l
l
Distribution w/ encl:
l-
Region I Docket Room (with concurrences)
PUBLIC
Nuclear Safety information Center (NSIC)
NRC Resident inspector
H. Miller, RA/J. Wiggins, DRA
C. Cowgill, DRP
R. Summers, DRP
D. Cullison, DRP
C. O'Daniell, DRP
estribution w/enci (VIA E-MAIL):
- B. McCabe, OEDO
C. Thomas, NRR (COT)
A. Wang, NRR
R. Correia, NRR
DOC DESK
Inspection Program Branch, NRR (IPAS)
. DOCUMENT NAME: G :\\B RA N C H 5\\2-PG\\lN S PECT\\PI L9810.lN S
- Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
- N*=
No copy
OFFICE
Rl/DRP
Rl/DRP
/
l
NAME
RLaura
CCowgill
DATE
12/22/98
12/ /98
12/ /98
12/ /98
12/ /98
OFFICIAL RECORD COPY