ML20217N891
| ML20217N891 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/15/1999 |
| From: | Alexander J ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20217N895 | List: |
| References | |
| ENGC-2.99.110, NUDOCS 9910290154 | |
| Download: ML20217N891 (1) | |
Text
.
- M '
Enttrgy Nucisar Generation Compsny bh Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 4 -
J. F. Alexander Oweetor Nucie,r Assesstrent l.-
" October 15, 1999 ENGC Ltr 2.99.110 -
U.S. Nuclear Regulatory Commission Attention:. Document Control Desk
. Washington, DC 20555 Dockqt No. 50-293 License No. DPR-35
Subject:
Report of Changes, Tests,'and Experiments Performed at Pilgrim Nuclear Power Station
'In accordance with 10 CW 50.59(b), Entergy Nuclear Generation Company is submitting this report of the changes, d w and experiments at Pilgrim Nuclear Power Station for the period l
of April 22,1997 through June 21,1999.
A listing of changes effecting the Final Safety Analysis Report (FSAR) included in this report is
. attached. Each listing contains a brief description, a reference to the relevant FSAR sections, and a reference to the st.ppc,rting safety evaluation (s).
Sincerel,
l l
exa der JDK/sc.
Enclosure:
. Report of Changes, Tests, and Experiments I
cc:
Mr. Alan B. Wang, Project Manager -
U. S. Nuclear Regulatory Commission
" Project Directorate 1-3 --
Region 1
- U. S. Nuclear Regulatory Commission 475 Allendale Road i
Office of Nuclear Reactor Regulation-King of Prussia, PA 19406 Mail Stop: OWF 8F2 f
1 White Flint North' 11555 Rockville Pike Senior Resident inspector
/h' M
Rockville, MD 20852 Pilgrim Nuclear Power Station 9910290154 991015' PDR'-ADOCK 05000293' R
PDR 299110