ML20217N891

From kanterella
Jump to navigation Jump to search
Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl
ML20217N891
Person / Time
Site: Pilgrim
Issue date: 10/15/1999
From: Alexander J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217N895 List:
References
ENGC-2.99.110, NUDOCS 9910290154
Download: ML20217N891 (1)


Text

.

  • M '

Enttrgy Nucisar Generation Compsny bh Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 4 -

J. F. Alexander Oweetor Nucie,r Assesstrent l.-

" October 15, 1999 ENGC Ltr 2.99.110 -

U.S. Nuclear Regulatory Commission Attention:. Document Control Desk

. Washington, DC 20555 Dockqt No. 50-293 License No. DPR-35

Subject:

Report of Changes, Tests,'and Experiments Performed at Pilgrim Nuclear Power Station

'In accordance with 10 CW 50.59(b), Entergy Nuclear Generation Company is submitting this report of the changes, d w and experiments at Pilgrim Nuclear Power Station for the period l

of April 22,1997 through June 21,1999.

A listing of changes effecting the Final Safety Analysis Report (FSAR) included in this report is

. attached. Each listing contains a brief description, a reference to the relevant FSAR sections, and a reference to the st.ppc,rting safety evaluation (s).

Sincerel,

l l

exa der JDK/sc.

Enclosure:

. Report of Changes, Tests, and Experiments I

cc:

Mr. Alan B. Wang, Project Manager -

U. S. Nuclear Regulatory Commission

" Project Directorate 1-3 --

Region 1

- U. S. Nuclear Regulatory Commission 475 Allendale Road i

Office of Nuclear Reactor Regulation-King of Prussia, PA 19406 Mail Stop: OWF 8F2 f

1 White Flint North' 11555 Rockville Pike Senior Resident inspector

/h' M

Rockville, MD 20852 Pilgrim Nuclear Power Station 9910290154 991015' PDR'-ADOCK 05000293' R

PDR 299110