ML20059N725

From kanterella
Jump to navigation Jump to search
Requests That Matls Listed in Encl Be Furnished to Assist Maint Program Team Insp Scheduled for 901105-16
ML20059N725
Person / Time
Site: Pilgrim
Issue date: 10/01/1990
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
References
NUDOCS 9010170192
Download: ML20059N725 (16)


Text

i i.:

007 11990 Docket No. 50-293 Boston Edison Company ATTN: Mr. Ralph G. Bird Senior Vice President - Nuclear n" Pilgrim Nuclear Power Station

- RFD #1' Rocky Hill Road Plymouth, Massachusetts 02360 Gentlemen:

Subject:

Maintenance Program Team Inspection This letter is to inform you that the NRC intends to perform a team inspection of your maintenance program at the Pilgrim Nuclear Power Plant in Plymouth, Massachusetts on November 5-16, 1990, and to request your assistance in accomplishing this' task. The inspection will focus on the performance of maintenance and whether components, systems and structures of your plant are adequately maintained and properly-repaired so that they are available to perform their intended safety function.

In order for us to properly prepare for the inspection and maximize the onsite

-time spent in observation of maintenance in progress, we request that you furnish the reference material identified in Enclosure 1 to this letter. To assist you in the gathering of the requested reference material, we have enclosed a Maintenance Inspection Tree (Enclosure 2) which is used by the team as guidance during the inspection. The team leader will be contacting a member of your staff. shortly regarding the information that will be needed prior to the start of the inspection and to arrange a suitable date for a meeting to explain the inspection and assessment methodology.

A copy of the NRC Temporary Instruction 2515/97, " Maintenance Inspection,"

i Revision 1 is enclosed for your information and to aid in the preparation for the inspection (Enclosure 3).

-Thank you for your cooperation in this matter. If you have any questions regarding this matter, please contact Walter Baunack, Team Leader, at (215) 337-5175 or Norman Blumberg at (215) 337-5199, or myself at (215) 337-5291.

Sincerely, Original Signed BE4 Lee H. Bettenhausen, Chief n

' ' } (j Operations Branch Division of Reactor Safety 0FFICIAL RECORD COPY DRYSDALE/PIL MTI/9/11/90 - 0001.0.0 9010170192 901001 F 10/01/90 PDR 0

ADDCK 05000293 PNV

\ 60\

s

s' '

Boston Edison Co. 2

Enclosures:

1. Request for Material .
2. Maintenance Inspection Trec
3. NRC Temporary Instruction 2515/97 Maintenance Inspection ec w/ enc 15:

K. Highfill, Vice President, Nuclear Operations R. Anderson, Plant Manager J. Dietrich, Licensing Division Manager  !

E. Robinson, Nuclear Information Manager R. Swanson, Regulatory Affairs Manager The Honorable John F. Kerry The Honorable Edward J. Markey '

The Honorable Edward P. Kirby The Honorable Peter V. Forman The Honorable Edward M. Kennedy The Honorable Lawrence R. Alexander The Honorable Nicholas J. Costello B. McIntyre, Chairman, Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Plymouth Civil Defense Director R. Hallisey, Department of Public Health, Commonwealth of Massachusetts R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts Paul W. Gromer, Massachusetts Secretary of Energy Resources Sarah Woodhouse, legislative Assistant A. Nogee, MASSPIRG J. W. McCormack, FEMA Regional Administrator Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (h:10)

NRC Resident Inspector Commonwealth of Massachusetts, SLO Designee OFFICIAL RECORD COPY DRYSDALE/PIL MTI/9/11/90 - 0001.1.0 10/01/90

e,'.

Boston Edison Co. 3 bec w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

T. Martin, RA R. Bellamy, DRSS L. Bettenhausen, DRS i: N. Blumberg, DRS l'

W. Baunack, DRS J. Johnson, DRP i- J. Rogge, DRP J. Macdonald, SRI - Pilgrim (with concurrences)

K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports J. Caldwell, EDO R. Wessman, NRR R. Eaton, NRR t DRS Files (3) i i

t

  • tb J-DRS:RI DRS:RI RS:RI Baunack/ajk Bessette Bettenhausen 09AS/90 09hs/90 p(/0//90 l-0FFICIAL RECORD COPY DRYSDALE/PIL MTI/9/11/90 - 0001.2.0 09/28/90 l

r '

r t

,. w d .

1.

ENCLOSURE 1  ;

L Please provide three sets of the requested documents. .The-team leader will l contact a member of your staff regarding the best method of transmitting the documents to us.

! We request that you provide pertinent documents covering each element of the Maintenance-Inspection Tree (Enclosure 2), including your management and administrative controls, procedures, instructions and guides. Experience has shown that providing the requested information makes preparation for,the  !

inspection easier for both yourself and the team. If you do not have a docu- '

ment for specific item within an element, you need not generate it to comply with this request. The blocks on thi:; tree identified as 1.0, 2.0, etc. do not require .information from you. Some documents may be applicable to a number of elements =. For these, provide the document and list the elements for which it i applies.: Also, to aid in planning the onsite inspection, provide the appro-  ;

priate contact for each element. ,

in addition to information provided for the inspection tree, we also request

.that you' include the following information. Documents covering any of the  !

following that were already provided for the tree elements need only be listed.  :

Description of methods by which maintenance performance is measured. Are performance indicators used? What are they? Who is informed of the t reports used to assess maintenance performance. l 1

Description of process for communications with vendors for technical  !

services and latest technical information on equipment and systems  ;

installed at the plant, and interfaces with equipment and NSSS vendors for r training, modifications, and equipment replacement.

Documents which describe the preventive maintenance and predictive main-

.tenance programs.  :

Which equipment is included?

How is maintenance frequency determined? ,

What is done with results of these maintenance actions?

The number of craft personnel for electrical, mechanical, and I&C main-

-tenance organizations. Please include foremen and the foremen to craft ratio.

The average years of experience for each individual and the turnover rate.

Description of shift work and work assignments. How do licensee super- "

visors decide on which craft or contractor is to perform what type to work?

t r

i

y ,=

a

- 4 g 4 l 2-L -

Identify significant equipment failures which occurred during the last two years, include those identified during the last refueling. (Provide  !

for both units).-

Describe the maintenance and testing of diesel generators and class IE- 1 electrical equipment. l Provide the following Maintenance Work Orders (MW0s)-status. l L i

! Current total listing and 5.tatus of MW0s, number in planning, number in i final sign-off, number on hold for lack of parts, number on hold for- t engineering assistance, number available to be worked on.  :

e Projected number of corrective MW0s to be outstanding at start-up by  !

, priority. 4 i

Rate of-completion of corrective MW0s in terms of-number, completed per  !

-month and manhours expended (by craft) per month for the past-12 months. '

Current number of preventive MW0s for the past 12 months.

(

-Rate of completion of preventive MW0s for the past 12 months.

Estimated manhours required to complete current preventive maintenance

.MW0s.

  • 1 i

Number of.MW0s requiring rework over the past six months.

Provide five corrective maintenance _ procedures for work that is scheduled- '

for the outage (e.g., MOVs, PRVs, Solenoid Operated Valves, Safety / Relief Valves, ECS. Pumps, Batteries, Switchgear, etc.).

Provide five preventive maintenance procedures that are scheduled prior  !

to your next scheduled cutage, j t

o -

Provide your overall maintenance schedule for the outage, ff b

+

e ENCLOSURE 2

.e, y o WORKING TRE E'e ,

. Err ewoos MAINTENANCE INSPECT f 1 I E A1184peth16aumn p' sat 94 4 pha asued4 3 IWW W D48tif IMS SAEL pegL me $1tgest Ismagst eigenps) s' O, gk N I 9.ast ganghtgeg 4 8W434 DMC1h 85d318 I

& Alpeth S Nm1 act9El I I 2 i

' "W y p - _ __ _ _hlI8I1 p(sad punt

-uma w s
        • L"** +. - --- - -- _ -

ie

= tettf EataEl .-a

" I n i 4 I

' R eest

'ag teaEGNf StelalEu t1 engymaat

*"**I*'I"' &#'#!

+ estimig b .

it

' me . -

,, ei DeAEB4h2 h APeutam pr # ,,,,

It staqri pagnam e -]g,gg es,.a g -

ggf YB sas* v coamaa sta e aAlJf e$ e a.W1hefahrt e -,f artritt s hartamtagh

. etacle trirt

g g =a

== ==ai e .. n,ma % t'"J='p ' e a m ai.

. iia. . :a,,,,,

r===i;=

en e --- .C.,

.. . . . 4,. e .a ma _ "wa . - ,

e, ====>

e et a, .- e, e E. ou.a oy .. -

._ qHa ltmes2

  1. .. m.

e pef 4884 h*R44' ICE -

e@tC1 tot GRI' e m e Pf3tEMBL

,I e massec e e NotPE WLC0htaCW) W sea e 94 Gid6JMtatal e 111tu tenultast e na atlh eadhtamG pe0225 e kaaa man ta

=

e $tassafts gewt , ,,,u ,,

I'E 8tAfsf a~.: un a a ne m,, a,.

.@u . ,, e . e arMEa&Apawltf e Camah get f adel massim /

e aCCR83aEJW Mla948 e posi tanat NMan tasstast mCM taa'aumt e es1Mv1tl.Egs) ase 493443 e emana f aC191 e tarift mqts agiapitang eggespy e eseA 005s e@tfiert ,

e 3f511g DschttbuC e CoqPSEuf SEWEmum '

e F0fusMttel 888 AfG (MsR1 e GBGastJaldleak @4FWC15 e Estah neumstrug / 33 e post-smeag e CarumE Sestant e tas aul ta a staIWS tode Illl>G e, et,tsN,ng gygga ygq e OtftWect aparths e $UW f&assylp U"'I eo e stPap tid e Rant armuC atestutu ' #'38 IJ38tEl' e EJ alttastui "[EI gytti %g tal y 3

e e StartmC upstam3 Mod 15 e mattAl -

e tutnases llata tag , gm m,  %$

3e e canna te orptHQh a h 9 $800Bf e er pelaaf W U E8

- # 4 anet W mas 4tasi4 e optt115thtRFitate M RasISIB 930$$$ *E8831A88 -

M "fl e solutact erpettus e 13'thus

"' e IEEstuG e WE 8 #NEP9 4 fB**B'8

  • daaassa e 8659 Wh sta e f*ft W haai4W . =ma ass I, e e .suitv e -mnem.t e.su.=.=.a.en.sa

. , ....m. e, e mannuasem ataantanti piassas y I'

" II e ESAAlp1 tskaat Onesagg

" aCW1El II'*"*'[

- Canuct pursasasem

/_ iggg utAhatasst e malaADOWS 5615B6461 i , ,

e (Jti.t.ta ew onnta.rtTT e .Ot.FYRO.a.D,m1 1 -

o Esthan2 o Cadte tracts e Daars m paum e sof AquoMqts e aato 10 set ff e use taasMs4 e daBW ta3L90 e eks Dock FTECh e7

't,'.2***'" . .a.  : .".'o.**,*."a.".

WeaaltW', - -

e PINggange negaggg 19 if

.- 00CutstDi CDhltar C.a.dnC.,1,Delff Svsmor= < e run a a ,4 sam passa e gn R51BE

' e IL3esta MCIrtCalSht e est tauntstoft e Elia& reg e EtathC Ltf11 tim 0tE14s4 haastal , g pgggg e recommum e arMzas an . g.

e mias,a =r

gall; 6, ,==c .. 4,. au g methm2 y 0131h y t 47tn is em:s muu enn e7n.c, em-tannn "un 4217764 41674-L ans e77H e omfam e 4P9a14 e REPlaJ e Mmf aas4 o et KFIBd11f

\

I 1

A n

._ u n. _ . .,

- - - . -- -.------s_ m _._m

q k --- _

(TREEL

,i .. o . o.. m. i

. n.a.

e1 t u .. E.1 tJ. ell

. . .ste

! r

- - - - . - _ - _ _ . _ _ - _ . _ + . , , -

- _ _ _ _ .__. ___ f=.u.

I E

'. I .. I ,, I ,, I

%,/_  :,/. y3,.as yf

- u. . -

m. wi.

u.* =

.e. -

m,,.,,,/

u y==> o

-n .< -

c= .. .

. . . . i-=.+

/

, - . . .u

.=.==

= .m .

.m u moi ,, . , . , , , . . , . , c, . , . , , . , .

1 b"l.2,1=h.;,%,

.e n .n

  • ! 'l'" ll gg/ -

m,g; f  : '"":.EL*'

LI 8 hEf /'

=

" ,,.sa.6 . -

.n.gg, ,,e # - .. fet. .

j

,,,,,,g

c. ..,a . .P.===.

P S *.E. .D

=.et..mem .

. n

.e.t.i.n.in,sta

/ Ni"'"'"'"'

.c e

..m.,.,7...

ai

=

.. .c.u.

. ....,,.m...,, -

., ,gogggg m

i.

=.

ic. =

..P.t

.,m

. - i .u . . .

=,="-

u i.i

- .. .h.m

= . ~

== .

. :l.* /a

t. = .

SI  ;

rl*,.* ~. ~ .-

Pir -
=a ;-i.

AI,ERTURE n,

. .m

..o .

. u. .

~ . -

= m.

i.

CARD -

u

= = . -

g'gg,=,,,  : T.""*ll"

.==

, =,,/..

m..

~

- =.

===.,7 .

Also Available Ort

.1.".L. .a

. n.e

.. na Aperture L,ard

,, , , . . .n

2. .

'=L. . - ~ ~ ~ ~

. %a,i;===

  • L.aa, "a== - m .=,

LEGEND

. u. = = . =

. e e, .g .wg ., gh.ss. .se Cl. m1De k=R EC h I tIlidlim

- l '. , flua.- tb tgt .a.am, nu.c

" M* ,,, ', !E[j;ll=* E.E"E'n*="***i n nam

'** .a""'5 ,** ,"-*""" . - -

ns== ma. nani . c,

- ' au

=='.a 4e..u.4.i

- us s.ii ns a m=,.m . .-ium

,u ,,.u, io , . . . . .

. . .. m.mc ,

. mas no

. como .aami a, nu.= n .aa. anon.u uie.

=a*',.g="a C .u 40 === . u-myf._ : = =; '~~ a ==

, C '.t.'esl.n i n== = s .:r.f

. ". Tn== l"

n. a .e s as . e. to

.c u n=t

.n .e .

a

. mo. net 425767-C i

90 \ 0 n D kQ O >

,n, - - -:. .

O'l;i* '

. eo ch g

UNITED STATES i- d-NUCLEAR REGULATORY COMMISSION ~

wAssmotom o. c. aosss NRC-lNSPECTION MANUAL poEa TEMPORARY' INSTRUCTION 2515/97, REVISION 1 MAINTENANCE INSPECTICH 2515/97-01 PURPOSE This temporary instruction (TI) provides guidance fore conducting a perfor-mance-based inspection of.an established and implemented maintenance process

, at cll operating nuclear power stations.

2515/97-02 OBJECTIVES

  • The pricary objective of this TI is to detennine whether all components, systems, and structures of nuclear Wwer plants are adequately maintained so that- they can be relied upon to perfonn their intended' functions. R' Additionally, this T1 should determine whether the maintenance process provides for the prompt repair of plant components, systems, and structures,

, as appropriate to their prescribed functions.

2515/97-03 BACKGROUND

. NRC has examined their nuclear power plant maintenance programs and has found a wide' variation in their effectiveness. Inadequate maintenance has been a significant contributor to plant and system reliability problems and, thus, is a safety concern.

Analysis of operational events has shown that nuclear power plant components are not being maintained at a level of reliability- R commensurate with their-importance to safety.

This TI was ;ceveloped to inspect and assess.the-effectiveness of maintenance at selected nuclear power plant sites. A Maintenance Inspection Tree (tree) will be used as guidance- during these inspections to - collate and present inspection findings. The tree is intended .to provide a systematic approach-p

. to the performance of the inspections and to ensure a level of consistency. R 2515/97-04 CONDUCTING TEAM INSPECTIONS The maintenance team inspections sill be announced when the team leader prepares for the p.e-inspection visit (Section 04.01) to the site. The full-scope inspection cycle will generally be of a 6-week duration, with the team leader possibly taking an additional 2 weeks to initially coordinate the inspection, gather infonnation, and issue the final inspection report.

Issue Date: 09/22/09 n

i

v . .

f
The (Jweeks nf; team _ ef f ort should gercrally consist of I week nf preparation .

l$week of)in-of fice inspection, I weeks of onsite inspection, and 2 weeks of-L g l documentation.

~

The_ sequence-of the inspection _ effort will be_ determined by the regional of fice.- For example,_ the 2 weeks uf onsite~ inspection may be-l consecutive or separett:d. hy I week of in-office inspection. <;

I Generally, the inspection team will be composed of the;following six members:

une team leader (region) two reactor / project engineers (region)_

one radiation specialist (region) two engineers (HQ)

The team composition and/or the extent- of effort for individual members may-bt adjusted by the region. For example, the extent of involvement of the radiation, specialist may be less than 6 full weeks, as determined by the regional of fice. In addition, the regions may include involvement of the resident inspector -(RI) ~to the extent that is normally covered by IP-62703 monthly examinations. The RI should be provided training in the use of the logic tree by the appropriate team leader for this purpose.

The project manager (PM) will be generally involved with each inspection to' the following extent:

be available to the team leader to facilitate contacts with the licensee attend 1 to 2 days of the team preparation E attend final pre-exit team meeting attend exit meetings The team will determine what failures of significant equipment (probabilistic R )

risk assessment (PRA)-identified, safety-related, or balance of plant (B0P) that' affects safety-related and special interest items) have occurred and will inspect the licensee's trending and maintenance activities to schedule, R repair, and prevent further failure of - that equipment. (lther selective examinations of equipment failures attributed to maintenance will be examined to determine the adequacy of licensee corrective actions and root-cause

  • detenninations of the failures. W inspection should be performed following, review of the elements of the Maintenance Inspection Tree (tree) and the additional inspection guidance provided in the Maintenance Inspection Guid-ance Volumes I and II (separately distributed). This guidance should be used as an aid in determining adequacy - and implementation of maintenance activities and to evaluate them. The tree is also used as a tool to provide a level of uniformity in inspection structure and in the preliminary recording of the inspection results, it is important to stress that the tree does not drive the inspecticn, but it does represent guidance in the areas of inspection to be considered in planning the scope of the inspection, with R inspection results recorded on the tree to the extent completed. The tree consists of three major sections: (1) Overall Plant Performance, (2) Management Support. of Maintenance, and (3) Maintenance implementation.

The inspection requirements for Haintenance Inplementation, which focus on 3 the plant systems, components, test and surveillance data, and related activities, will receive the major portinn (at least 80 percent, including direct observations of maintenance being performed) of the inspection effort.

)

Issue Date: 09/22/89 2510 97

"- ,, iiu

,I *

" ' ' ' I t' . sheuld be recognized that irspection results fror; the Mointenance

  • ', implementation,crea;will'also

-it t provide input tn the Nanagement Support area.

is expected that - portions of the- Management Support of Maintenance

-sections of the -_ tree, especially the Management Commitment and Management

.relatively Organization shortsections, time. could be ' conducted by a single team merrber in :a The amount of . inspection effort devoted to the . individual subsections of-the - tree wil's be determined by the regional office . taking into account recent inspection findings, time and staff limitations, and future inspec-tions planned to cover spscific areas.

The inspection is to determine the effectiveness of the total integrated maintenance - process of the power reactor licensees. Therefore, the team inspection ments may not exist.

may be directed into areas for which explicit regulatory require-Thus, the inspection is oriented toward "nalyzing the performance of maintenance activities rather than toward the tientifi-cation of violations.; A specific example of an area not subject to explicit requirements is the licensee's participation with the Institute of Nuclear Power Operations _ (INPO).

Review of licensee resolution of INP0 activities shall be conducted in accordance with established policy and, thus, observa-tions in this area, when warranted, should be treated as indicators of strengths or weaknesses.

- Although the inspection may result in the identification of inadequacies that are not covered by explicit regulatory requirements, there is no intent' to

" ratchet" licensees.. Individual findings that licensees are _ not following published NRC guides and industry guidelines do not necessarily indicate that a program or area is inadequate. The goal' of the inspection effort is to j emphasize the use of plant experience, test, reliability and surveillance R-data, to component failures, PRA insights (available to the licensee or provided R the team by the Risk Applications Branch), and items of interest in evaluating the licensee's maintenance process in terms of capabilities and performance, and to identify major strengths and weaknesses as they are related to safety significance.

04.01- Team Leader Preparation. A meeting should be held with the licensee -

to describe the scope. of the inspection and to obtain preliminary review materials, such as the licensee's procedures for planning, conducting and assessing - maintenance, as . well as organizational charts, work schedules, equipment lists, component failure and trending data, completed work orders, R and related quality control (QC) inspection procedures. The material obtained by the team leader from the licensee should be distributed to the team members for their. review. Following completion of the in-office review of the . licensee's maintenance process, the team leader will discuss the results of these reviews with the team members and factor them into the plan for the ' onsite inspection.

04.02 Inspection Preparation. In preparation for site inspections, the inspection team should review the elements of the Maintenance inspection Tree to ' determine which areas may have received recent inspections, which areas may not be applicable, and which areas will be reviewed at the plant site.

The three major parts of maintenance (i.e., overall plant performance, management support of maintenance, and maintenance implementation) should be inspected to the degree required to provide a valid conclusion %garding the effectiveness of the licensee's maintenance program.

?515/r>7 1 Issue Date: 09/22/89

p -, '.

7 T l,1 -During the prepa ra tion phase, the team should select ~ several components and/or systems ' for detailed inspection either throuch' consideration of available PRA insights.- licensing trending data, component- failures R fn safety-related or 80P systems that affect safety, or selected equipment of heightened interest to the Commission, such as check valves, motor-operated [

\'

valves' solenoid-operated valves, and air systems.

The PRA insights may -

be used to - select- components or activities whose pottetial failures are predicted to' contribute most to the risk at that plant. At least one high- ,

risk: system should be included -to veri fy that all performance-related ,

maintenance has been accomplished, including preventive maintenance. Equip- R s j ment failures provide a vehicle for review of various aspects of maintenance, ';

including ront-cause analysis and trending, equipment history, corrective R '

actions, ~ and past maintenance (preventive or corrective). Inspection of failed equipment repairs or work packages will provide the opportunity to  !

examine the adequacy of the interaction of all licensee functions supporting maintenance,_ including engineering analyses and trending.

. Review of performance indicator data, systematic assessment of licensee performance (SALP) reports, previous inspection findings, licer.see event  !

reports (LERs), maintenance radiation exposure history, and other direct j measures may identify potential weak areas at that plant for. which more detailed inspection may be required. Figure 1 (Inspection Flowchart)  ;

depicts the initiators that may be selected to enter the tree.

. During the preparation phase, program strengths - and weaknesses in certain  !

areas may be recorded on the Maintenance inspection Tree (working tree). If there are sufficient data to provide an evaluation rating during the prepara-tion, the elements should be ra ted in accordance with the Maintenance Inspection Guidance. However, selected items and, in particular, identified I weaknesses f should be verified during the onsite inspection, even if an evaluation rating is assigned during the preparation. (.

04.03 Onsite Inspection. An entrance meeting shall' be held with the licen-see tc . detail the scope and schedule of the inspection, introduce the team .l members._ and establish the licensee's contacts for the inspection. The team.should obtain from the licensee the status of ongoing work applicable to the inspection or that may affect the perfonnar.ce of the inspection or the.

  • inspection ' schedule. Schedules and plans for the exit meetings and the interim meetings 'between the team. leader and licensee management should also

' be establisheo during the entrance meeting. ,

Team members shall perfonn a detailed walkdown inspection of the plant on the first 'or second day on site to observe the overall plant and equipment material condition. This walkdown inspection, in which the team should i observe the condition of numerous valves, pumps, motors, etc., should  :

include, but not be limited to the following: '

i Condition of components  :

Significance of tagged equipment Housekeeping and environment Adequacy of labeling Comparisons with drawings and/or procedures Status nf annuncictors This walkdown inspection may provide indications of areas requiring further examination during the inspection. .

Issue Date: 09/22/89 2515/97

, , ,' ; 7 "' '

L

,'t.  ;

. (' Thi~onsite,= inspection ~shobld focus on the direct ! observation- ofinwork progress.

including the followir.c of licersee work with equipment in progress (e.g.,

c .

tagouts, procedures, work packages,. engineering s uppo r't , '

materials, cernr.unications, testing, approvals, quality control

, etc.), significance of. the maintenance backlog, rework, licensee assessmentj of 'the performance of maintenance, work control processes, control of inter-faces, post-maintenance testing, plant material condition, facilities. and maintenance '!

~

On the basis of the collected data, the team should determine- the apparent cause of of any problems noted; that is, if the cause is related to the adeouacy procedures, engineering, etc. work packages, qualification of personnel, management, )

"This analysis should provide entry into specific elements of the tree, which then becomes a tool to eFplore the suspected Causes and to assess effectiveness of the implementation of applicable elements. - All areas listed need not be used in forming conclusions for each element.

Furthermore, entry other areas of inspection selected by the team may be used for to tree elements. _;

04.04 Analysis.-

Using the inspection findings and results noted on the Maintenance Inspection Tree, the team should determinc whether each of the i areas inspected has been adequately implemented by the licensee and whether or not there is enough infomation to assign a rating. The Maintenance Inspection Guidance Maintenance Inspection'and Tree.Criteria previously provided also assists use of the elements identified cn the work sheets.The team will assign a rating to the applicable The team should assign an overall evaluation rating to each of the elements inspected.

determined When this analysis has been completd. an overall rating can be Criteria. in accordance with the Maintenance inspection Guidance and 04.05 Exit Meeting.

Before the final days of inspection, issues and I findings should be reduced to definitive- writing and then used to highlight

- the presentation version of the Maintenance inspection Tree (the Presentation Tree), and to complete the rating roll-up. The exit meeting should include a brief discussion of the preliminary inspection findings using the presenta- -

tion Tree to depict inspection results in a. summary fashion;;however, the licensee should be informed that the findings are preliminary until they are reviewed by regional management and the inspection report is issued.

04.06 Report Preparation.

Because of the' broad extent of the inspection, documentation of inspection activities should begin early in the process to  ;

minimize the time required to complete the final report. The final report  !

should document the assumptions used, the elements inspected, the elements that were not applicable, licensee ,

, conclusions consistent with IMC-0610. strengths and weaknesses, and overall 1 the tree to at The report should address elements of least the depth of the tier with eight areas (e.g., Direct

. Measures, Management Commitment and involvement, etc.).

04.07 Follow Up. ,

Any unresolved findings identified during the inspection will be appropriately tracked ar.d resolved by the regional of fice.

I 2515/97 -S- Issne Date: 09/22/89

p '.', l e.. . q 4:

, JS15/97-05 : - 1HSPECT10N REQUIR[f tEl0 S

" TheJ inspection shall' include selective examinations of the aspects of main-

"tenance listed 'in~ Sections' 05.01 through 05.03, including each -of the areas ( )

and e

t

! related elements of litersee activities identified under the sections.

'To the extent possible, selective examinations should be based on observation of maintenance and equipment work activities in progress, review of licensee: s

implementation nf maintenance procedures and controls, results of review uf  ;

c:

selected dol 0ments (such as work packages, equipment test results, and engi-neering evaluations), and interviews with personnel). 1 05.01 Overall Plant Perfonnance Related to Maintenance a.

Direct Measures. .The team shall conduct appropriate examinations of

  • plant operability, equipment availability, and plant condition that material  !

,' can be directly related to the effective implementa-

. tion of a maintenance process.

Before conducting the inspection of plant performance, the inspector should review (3) reliability.available plant information on (1) availability,. (2) operability, and operating history. Infonr.ation on these items can be obtained from the plant's.

Other sources for obtaining the information are sal.P  ::

reports, Performance. Indicator Da ta , AE00-Scram Studies, ESF Actuation Studies, Violations,Safety - System Unavailability Studies, Technical Specification Monthly Operatine Report Data, and Capacity Factors 3 NUREG-0020. from safety significant Data collection should be directed to those measures related to aspects of the maintenance process. In addition, the inspector should conduct a detailed walkdown inspection of the overall plant ,

material condition to assess the effectiveness of the licensee's maintenance

. process - to the extent that it is reflected in plant housekeeping and in the external condition of equipment.

(

The scope of the inspection shculd include examination of direct , measures by using information gleaned from plant and equipment for the following:

I

Historical data Material condition 05.02 Management Support of Maintenance - ,

a. Management Commitment and Involvement.

The examination of management effectiveness concerning maintenance should be directed to deter-mining the extent of - corporate and plant management awareness and support of the maintenance and resolution of maintenance problems and should include examination of:

The application of industry initiatives.

Extent of management direct participation in maintenance and in corrective actions (management vigor and example).

b. Management Organization and Administration.

management The inspection of organization and adminis t ra tion controls should be directed to determining how the organization supports maintenance activities, what maintenance activity plan has been established, how the maintenance controlled, a nt' activity plan has been implemented, corrected, and the control of resources. The inspection should include examination of:

Issue Cate: 09/22/89 2515/97

1, 7 --

7'* - Program cover 4r : for maintenance-

  • . Policy, noals.- and 'objectivesi for maintenance j ' Allocation of resources Definition of traintenance requirements

* Performance measurement i

  • Document Control System for maintenance

, p, Maintenance decision process

c. Technical Support.

g The areas that are to be selectively examined for the follows: technical support organizations with regard to maintenance are as

-* Internal and/or corporate connunication channels Engineering control licensee acknowledgement of risk significance Ouality control R Incorporation cf radiological controls into maintenance process Safety Review Committees

  • Regulatory documents Trending R

Examples this of theare:

inspection applicable departments _ or organizations subject

  • to Engineering (nuclear,' instrumentation and control (If,C),

mechanical, electrical, licensing, systems, etc.)

  • ' Quality- Assurance (0A) s Quality Control (00)

' -)'

  • Health Physics (HP)

Safety

  • Fire Protection
  • 10peratio.ns 05.03 Maintenance Implementation a._ Work Control.

~

The inspection of the work control process should be directed to work order documentation, equipment history, observation of'. testing in progress, planning and scheduling, and document review.

The-inspection should incluae selective examination of:

    • Review of maintenance in progress Work order control
  • . Maintenance of equipment records and history

~*

. Job planning

. Work prioritization l Maintenance work scheduling l

  1. *- Backlog cor,trols Maintenance procedures cd Post-maintenance testing Review of ccmpleted work control dccuments b .'

" Plant Haintenance Orcanization. The inspection of the plant mainte-nance organization

-).; should be directed to how the organization i'~

supports maintenance activities, how the naintenance activities are controlled,-implemented, and corrected, how personnel are controlled, how the organizat ion establishes documentatinn, the effectiveness of l

'2515/97 B Issue Date: 09/22/89

i -

y [ .s!'.

-- thefccordination-management ated a rd ' c ro ft feedback ' ' lines: of codaunication t etween plaret personnel, and the effectiveness . of int r rfaces

' with' other departments, especially operations. The inspection shculd. i include. selective examination of:

. Control'of plant maintenance. activities

  • Control of contracted maintenance ,

Deficiency identification, control, and corrective action system. -'

Maintenance trending g

  • Support interfaces .

c.

Mai_ntenance Facilities,' Equipment, and Materials Control.. The fol-lowing are to. be selectively examined for the- area of facilities, .

t equipment, the maintenance andprocess:

material controls, as well . as' for their support of 1

. . Maintenance facilities and equipment

* Material controls  ;

Maintenance tool and equipment control i Control and calibration of measurement and test equipment

d. _ Personnel Control,.

be The following areas of personnel control are to selectively examined,

~

including consideration of staffing,

, training, and qualification:

Staffing control

  • Personnel training Test and qualification process _

Assessment'of the current personnel control status . fl 1 ~!

2515/97-06 eVPORTING RE0VIREMENTS The appropriate- regional office will document the findings and the actions taken in an inspection report and, in addition to the nonnal distribution, t will forward one copy to the Director, ' Division of Licensee Performance and

  • Quality Evaluation, Reactor
  • Safety, in Office of NRR, and one copy to the Director, Division of each- of the other regional . offices. A copy of the R Maintenance _ Inspection- Tree colored to reflect the inspection results for R each inspection cenducted i 10-A-19. should be sent to the Chief of PQEB at mail- stop R R

2515/97-07 COMPLETION SCHEDULE Inspections should be 1991. scheduled so that they are completed prior to April, R 2515/97-08 EXPIRATION '

This tempora ry instruction shall remain in effect until April until the inspections have been completed. 1991 or R Issue Date: 09/22/89 2515/97

,o-

,a. i '. .

$/f[' . ~2515/97-09 NRR: CONTACT N

.- ; 'Any A. , T. questions 'regarding this temporery instruction should be . addres Gody- (301-492-1117).

y;, -2515/97-10 STATISTICAL DATA REPORTING t Record the actual time spent 'to perform this inspectionEagainst inspection procedure _ number 25597lfor the 766 system and 2515/097 for RITS.

2515/97-11 ORIGINATING ORGANIZATION INFORMATION l11.01' Organization Responsibilities. The Perfonnance and Quality Evaluation Branch tions.. 'ol hRR will' provide support and overall guidance for these inspec- 1 11.02 Estimated Resources.

persons with 2 of Each inspection is planned for 6 weeks for 6 the 6 weeks _ being direct onsite inspection (IE staff weeks) and I week in-office inspection,_ with expected additional effort by 'i the team ' leader (a total of 38 staff weeks). This total includes prepara-tion, inspection and report writing.

11.03 Parallel inspection Procedures-

'The listedinspection below. procedures that this Tl may satisfy totally or in part are.

-inspection procedure Where credit is taken, the inspection report should note the '

number per IHC-0610. The region should make final determinations based'on the scope and documentation of the inspection.

37701 ~ 56700 62704 37702 61700 62705

-37828 CIP 61725' 72701 38701 62700 83000 series 38702 62702' 92700 CIP ~

41400 62703 CIP 92701-END u

d 2515/97 Issue Date: 09/22/89 L'

..\,