4 January 22, 1999 i

Mr. Theodore A. Sullivan Vice President Nuclear and Station Director Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, MA 02360

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAl) REGARDING THE TRANSFER OF FACILITY OPERATING LICENSE FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. MA4447)

Dear Mr. Sullivan:

By application dated December 21,1998, Boston Edison Company (Boston Edison) seeks approval of the proposed transfer of the Pilgrim Nuclear Power Station Facility Operating License No. DPR-35 and Nuclear Regulatory Commission (NRC) Materials License 20-07626-04 to Entergy Nuclear from the current holder of the license, Boston Edison, owner and licensed operator of Pilgrim. The NRC has reviewed the application and determined that additional information is needed to complete the review. Enclosed is the staff's RAl. We request that you respond by January 30,1999, as discussed with and agreed upon by

' Jack Alexander of your staff.

Questions regarding this request should be sent to my attention at the above address or you can contact me at (301) 415-1445.

Sincerely, I

/s/

Alan B. Wang, Project Manager i

Project Derectorate 1-2 i

Division of Reactor Projects - 1/ll h

Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Request for AdditionalInformation cc w/ encl: See next page 4

DISTRIBUTION

. Docket File TClark RArchitzel l

PUBLIC.

OGC l

PDI-2 Reading ACRS 1

l WDean CGoodman AWang MDusaniwskyi j

i OFFICE PDl-2/PM PDl-2/LA PDI-2/D NAME AWang bhM TClarlLM WDean i

DATE I/1/99 '

l /2//99 l /b OFFICIAL RECORD COPY DOCUMENT NAME: Pl4447.RAI 4

4 9901270047 990122 l'

k h h { [. [w [ ~O k O [

l

9 ym m

'a p

UNITED STATES C

j'

{

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. ennan anni January 22, 1999 y

Mr. Theodore A. Sullivan Vice President Nuclear and Station Director i

Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, MA 02360 i

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING THE TRANSFER OF FACILITY OPERATING LICENSE FOR THE PlLGRIM NUCLEAR POWER STATION (TAC NO. MA4447) i

Dear Mr. Sullivan:

By application dated December 21,1998, Boston Edison Company (Boston Edison) seeks approval of the proposed transfer of the Pilgrim Nuclear Power Station Facility Operating License No. DPR-35 and Nuclear Regulatory Commission (NRC) Materials License 20-07626-04 to Entergy Nuclear from the current holder of the license, Boston Edison, owner and l

licensed operator of Pilgrim. The NRC has reviewed the application and determined that additionalinformation is needed to complete the review. Enclosed is the staffs RAl. We request that you respond by January 30,1999, as discussed with and agreed upon by Jack Alexander of your staff.

Questions regarding this request should be sent to my attention at the above address or you can contact me at (301) 415-1445.

Sincerely, Alan B. Wang, Projad Manager Project Directorate 1-2 Division of Reactor Projects - t/ll Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Request for AdditionalInformation cc w/ encl: See next page i

t

I 1

REQUEST FOR ADDITIONAL INFORMATION (RAD 1

{

PILGRIM NUCLEAR POWER STATION. UNIT 1 l

1. What year did Entergy Nuclear come into existence?
2. Enclosure 1, Section li.F Projections of various financialinformation should be expanded to include (on the income statement), other expenses (e.g., depreciation and amortization, interest, down to net income or loss for each of the projected 5 years.)

Additional information also needs to be provided on Entergy Nuclear's capital structure.

Thus, a pro forma projected bal?nce sheet should be provided that includes detailed information on debt and equity, including retained eamings, etc.

3. Enclosure 1, Section ll.K What provision is Entergy Nuclear making for decommissioning costs that exceed current estimates by greater than assumed inflation rate? Also, what will be the source of funds to cover non-NRC-defined decommissioning costs pursuant to the "Entergy Calculation" on page 9 of Enclosure 1. Is the purpose of the " provisional trust" to provide assurance for such costs?
4. With the publication of NUREG-1307, Revision 8. " Report on the Waste Burial Charges,"

the NRC minimum decommissioning cost formula amount is likely to be reduced for those nuclear plants using Bamwell for low-level waste disposal, including Pilgrim. What is the impact of Revision 6 on Entergy Nuclear's calculations and the amount to be transferred from Boston Edison to Entergy Nuclear for decommissioning funds?

5. Please provide a flow chart indicating the relationship of the vwious Entergy subsidiaries and companies under the Entergy Corporate umbrella.

For the following, the responses should provide sufficient information to allow the technical qualifications of the new management / corporate to be determined. This information can be demonstrated using organization charts, descriptions of job functions and responsibilities, and resumes indicating the educational background and experience of the individuals. This i

requested additionalinformation should also be provided in the updated safety analysis report

6. Describe the new corporate level management and technical support structure for the integrated management of activities that support the operation of the facility.
7. Describe the management controls and lines of communication and authority between the new corporate management and the existing plant organizational units involved in the day-to-day operations of the facility.
8. Describe the specific educational background and experience for the new corporate l

management.

ENCLOSURE

Mr. Theodore A. Sulivan Boston Edison Company Pilgrim Nuclear Power Station cc:

Mr. Ron Ledgett Mr. Jack Alexander Executive Vice President Manager, Reg. Relations and Quality 800 Boyleston Street Assurance Boston, MA 02199 Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Resident inspector Plymouth, MA 02360 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Mr. David F. Tarantino Post Office Box 867 NuclearInformation Manager Plymouth, MA 02360 Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road Chairman, Board of Selectmen Plymouth, MA 02360 11 Lincoln Street Plymouth, MA 02360 Ms. Kathleen M. OToole Secretary of Pubhc Safety Chairman, Duxbury Board of Selectmen Executive Office of Public Safety Town Hall One Ashburton Place 878 Tremont Street Boston, MA 02108 Duxbury, MA 02332 Mr. Peter LaPorte, Director Office of the Commissioner Attn: James Muckerheide Massachusetts Department of Massachusetts Emergency Management Environmental Protection Agency One Winter Street 400 Worcester Road Boston, MA 02108 P.O. Box 1496 Framingham, MA 01701-0317 Office of the Attomey General One Ashburton Place Chairman, Citizens Urging 20th Floor Responsible Energy Boston, MA 02108 P.O. Box 2621 Duxbury, MA 02331 Mr. Robert M. Hallisey, Director Radiation Control Program Citizens at Risk Massachusetts Department of P.O. Box 3803 Public Health Plymouth, MA 02361 305 South Street Boston, MA 02130 W.S. Stowe, Esquire Boston Edison Company Regional Administrator, Region 1 800 Boyleston St.,36th Floor U. S. Nuclear Regulatory Commission Boston, MA 02199 475 Allendale Road King of Prussia, PA 19406 Chairman Nuclear Matters Committee

. Ms. Jane Fleming Town Hall 8 Oceanwood Drive 11 Lincoln Street Duxbury, MA 0233 Plymouth, MA 02360 Mr. James Keyes Mr. William D. Meinert Acting Licensing Division Manager Nuclear Engineer Boston Edison Company Massachusetts Municipal Wholesale 3

600 Rocky Hill Road Electric Company l

Plymouth, MA 02360-5599 P.O. Box 426 Ludlow, MA 01056-0426

r i

2

. F.

W>

f Ms. Mary Lampert Director Mass 6chusetts Citizens for Safe Energy 148 Washington Street

' Duxbury, MA 02332 l

1 I

s I

I i

f L

l l