June 7,1989 Docket No. 50-293 l
Mr. Ralph G. Bird Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360
Dear Mr. Bird:
SUBJECT:
RESPONSE TO GENERIC LETTER 87-02, VERIFICATION OF SEISMIC ADEQUACY OF MECHANICAL AND ELECTRICAL EQUIPMENT IN OPERATING REACTORS, UNRESOLVED SAFETY ISSUE (USI) A-46
REFERENCE:
TAC Number 69471 Generic Letter (GL) 87-02 provides a generic procedure for verifying the seismic adequacy of mechanical and electrical equipment. The GL requested that those utilities participating in a generic program identify the utility group and provide a schedule for completion of its effort.
By letter dated October 11, 1988, you responded to GL 87-02 and provided your schedule for initial implementation of the seismic verification program at the Pilgrim Nuclear Power Station.
You further indicated that Boston Edison Company is a member of the Seismic Qualification Utility Group (SQUG). The NRC issued a Safety Evaluation dated July 29, 1988, for the Generic Implementa-tion Procedure (GIP) developed by SQUG which identified several technical and licensing issues which needed resolution.
You have indicated your implementation schedule is contingent upon resolution and approval of the GIP developed by SQUG. Therefore, we are closing TAC Number 69471. A new TAC number will be opened for the Pilgrim facility when the GIP is approved and you submit your program and schedule for our review.
This completes our effort under TAC No. 69471.
Sincerely, Original Signed by:
8906140163 890607 anM G. KonaM, Senh Ned Manager PDR ADOCK 05000293 Project Directorate I-3 P
PDC Division of Reactor Projects I/II cc: See next page Distribution: MRushbrook PDI-3 Read NRC& Local PDRs EJordan PYChen BBoger DMcDonald
" Docket' Fil e BBrimes PSears SVarga ACRS(10)
[ PILGRIM RESPONSE TO GL 37-02]
2
'YO n,t, GOO nn UF f7 -3 D ~
)
/J.4---:------------:------------:------------:-----------
MRushbrook :D onald hM:
DATE :6/5/89
- 6/ 1 /89 A
amtzesun arterdera a6cn
f'
.4 Mr. Ralph G. Bird Boston Edison Pilgrim Nuclear Power Station cc:
Mr. K. L. Highfill Mr. Ralph G. Bird Station Director Senior Vice President - Nuclear Pilgrim Nuclear Power Station Boston Edison Company RFD #1 Rocky Hill Road Pilgrim Nuclear Power Station Plymouth, Massachusetts 02360 RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident ~ Inspector's Office Mr. Richard N. Swanson, Manager U. S. Nuclear Regulatory Commission Nuclear Engineering Department Post Office Box 867 Boston Edison Company Plymouth, Massachusetts 02360 25 Braintree Hill Park Braintree, Massachusetts 02184 Chairman, Board of Selectmen 11 Lincoln Street Ms. Elaine D. Robinson Plymouth, Massachusetts 02360 Nuclear Information Manager l
Pilgrim Nuclear Power Station Office of the Commissioner RFD #1, Rocky Hill Road Massachusetts Department of Plymouth, Massachusetts 02360 l
Environmental Quality. Engineering.
One Winter Street Charles V. Barry Boston, Massachusetts 02108-Secretary of Public Safety Executive Office of Public Safety Office of the Attorney General One Ashburton Place One Ashburton Place Boston, Massachusetts 02108
.20th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program l
Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Regulatory Affairs and Programs Group Leader Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184 l
_ - - - _ _ _ - _ _ _ _ _ _ - _ _ _