Notice of Violation from Insp on 871207-880119.Violation Noted:Doors to Areas Being Controlled as Locked High Radiation Areas Found Unlocked & Unattended
ML20153A850
Person / Time
Site: Pilgrim
Issue date: 03/11/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20153A853 List:
References
50-293-87-57, NUDOCS 8803210187
Download: ML20153A850 (1)


Text

- _ _ _ _ _ . _-

._': . , , ' ~

~: .7 APPENDIX A-NOTICE OF VIOLATION Boston Edison Company Docket No. 50-293 Pilgrim Nuclear Power-Station License No. DPR-35 As a -result of the inspection conducted on December 7,1987'to January 19, 1988, and in accordence with: the NRC Enforcement Policy (10 CFR 2, Appendix C), the f)11owing violation was identified. Three previous Notices of Violation dated March 13, March 23,.1987, and April 28, 1987 were issued for . problems related.

to the control of Locked High Radiation Areas. It is evident that_ corrective.

actions taken in response'to these' Notices of Violation have not been effective in precluding recurrence.

The Station' Technical Specification 6.11, "Radiation Protection Program,"

requires that "procedures for personnel - radiation protection shall be

. prepared consistent with the requirements of 10 CFR 20 and shall be-approved, maintained and adhered to for all operations involving personnel radiation exposure."

The Stat.on Procedure 6.1-012, "Access to High Radiation Areas," requires in-part that the areas controlled under this procedure remain locked or.

guarded at all times.

Contrary to the above, on December 15, 1987, December 27, 1987, and on January 8, 1988, doors to the areas being controlled as Locked High Radiation Areas were found to be unlocked and unattended, in violation of the Station Procedure 6.1-012.

This is a Severity Level IV Violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Boston Edison Company is hereby required to submit to this office within thirty days from the receipt of the

-letter which transmitted this Notice, a -written statement. or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

0FFICIAL RECORD COPY IR PILGRIM 87 0004.0.0 8803210187 880311 $

PDR ADOCK 05000293 O DCD

, - _ _ _ . _ . . . . . _ . _ - _ _ . . . . _ . . _ _ _ _ . _ . _ , ._ .__,-.-_ _ _ . - _ - - _