ML20244A628
| ML20244A628 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/03/1989 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bird R BOSTON EDISON CO. |
| Shared Package | |
| ML20244A630 | List: |
| References | |
| NUDOCS 8904180110 | |
| Download: ML20244A628 (3) | |
See also: IR 05000293/1988037
Text
_.
-
- _ _ _ _
- _ _ .
- _ _ _ _ - _ _ _ _ _
_ _ _ _ - _ _ _ _ _ _ - _ _ _ - _ _ - _ _
..ll l':
A
.1
APR 031989
Docket No; 50-293-
Boston Edison Company
!-
ATTN: - Mr. Ralph G. Bird
,
h
. RFD #1 Rocky Hill Road
'
Senior Vice President.- Nuclear
i
Plymouth, Massachusetts 02360
Gentlemen:
Subject: .NRC Region I Inspection Report No. 50-293/88-37-
This refers to-the inspection (50-293/88-37) conducted by the NRC Restart Staff
~
on December 27, 1988 to February 5,1989, at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts. Areas examined during this inspection are described
in the NRC Region I Inspection Report which is enclosed with this ' letter.
The Re' start Staff, through selected around-the-clock shift inspections and rou-
tine program . inspections, observed management controls, conduct:of. operations,
and startup testing activities during the initial phase of the' . licensee's Power
-Ascension Program.
Based on these reviews conducted per. the NRC inspection.
1
plan specifically developed to cover this period, the Restart Staff determined
that licensee management provided ' active and effective oversight and was
~
T
directly Linvolved in assuring ~ safe operation.
,
. Results of the NRC Restart Staff inspections and assessments are taken into
'
'
- consideration . by the NRC Restart Assessment Panel during ongoing lic_ensee
performance, reviews and deliberation's at each Power Ascension Program approval
point.
<
Sincerely,
i
Original Sinned RV
Samuel J. Collins, Deputy Director
Division of Reactor Projects
Enclosure:
NRC Region I Inspection Repcrt No. 50-293/88-37
%
D
P
G
OFFICIAL RECORD COPY IR PILGRIM 50-293/88-37 - 0001.0.0
03/30/89
c
-
- - - - -
--
-- - - - - -
--
g~
-
E
,
y1
t'
' Boston Edison Company.
2l
-
_
-
cc w/ enc 1:
.
- -
yl ..--
K. H.ighfill;: Station' Director
l;
.R.l Anderson,. Plant Manager
J.< Keyes,: Licensing Division Manager
E. Robinson,~ Nuclear Information Manager
RL Swanson,. Nuclear Engineering Department Manager
The Honorable Edward J. Markey
The Honorable Edward P. Kirby
,
The Honorable Peter V. Forman
n
L
.The~ Honorable Nicholas J. Costello'
The. Honorable Lawrence R. Alexander
'
B. McIntyre, Chairman,' Department of Public Utilities-
,
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil: Defense Director
P- Agnes, Assistant: Secretary of Public Safety, Commonwealth of Massachuset'ts
.
S. Pollard, Massachusetts Secretary of Energy Resources
'R.'Shimshak, MASSPIRG
Public. Document Room'(PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident-Inspector
Commonwealth of Massachusetts (2)
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1) ~
-W. Russell, RA
W. Kane;-DRP
S.~ Collins, DRP
T. Martin, DRS
M. Knapp,'DRSS
J. Wiggins., DRP
L. Bettenhausen, DRP.
E.'Wenzinger, DRP
R. Blough, DRP
1
J. Lyash, DRS
i
M. Kohl, DRP
C. Warren, SRI - Pilgrim
T. Kim, RI - Pilgrim
R. Bellamy, DRSS
W.'Pasciak, DRSS (See Paragraph 5.1)
R. Bores, DRSS
J. Durr, DRS
.
R.~Gallo, DRS
M. Miller, SLO
K. Abraham, PA0
B. Boger, NRR
R. Wessman, NRR
D. Mcdonald, NRR
OFFICIAL RECORD COPY IR PILGRIM 50-293/88-37 - 0002.0.0
03/29/89
- _ _ _ - _ - - - _ - _ _ _ _ - - _ - - - _ _ - _ -__ -__---- __ - _ _ --____- _ __ __ _ __ _ __ - _ _ _ _- _ _ _ _ _
-_ . _ _ _
,,
,
r
,
,
Boston Edison Company
3
APR 031989
l
J
l
.
i
.
!
h
RI:DRP
RI:DRP
RI:DRP
.DRP
%y
CWarren/mjd
RBlough
q JWiggins
o ins
3/d/89
3/A,/89
38//89
h/4 /89
i
0FFICIAL RECORD COPY IR PILGRIM 50-293/88-37 - 0003.0.0
03/29/89
_ - _ _ _ _ _ _ _
.__________---__-_______-____-___-____-____--_a