MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter 2024-09-11
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function IR 05000261/19950281995-12-14014 December 1995 Insp Rept 50-261/95-28 on 951030-1103.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000261/19950261995-10-0404 October 1995 Insp Rept 50-261/95-26 on 950827-0916.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Functions IR 05000261/19950211995-08-10010 August 1995 Insp Rept 50-261/95-21 on 950618-0715.Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Functions IR 05000261/19950201995-07-10010 July 1995 Insp Rept 50-261/95-20 on Stated Date.No Violations or Deviations Noted.Major Areas Inspected:Licensee Efforts Re Violations & Open Items Noted During SW Operational Performance Insp IR 05000261/19950151995-06-28028 June 1995 Insp Rept 50-261/95-15 on 950530-0602.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Occupational Radiation Protection Program During Extended Outages IR 05000261/19950171995-06-26026 June 1995 Insp Rept 50-261/95-17 on 950605-09.No Violations Noted. Major Areas Inspected:Emergency Operating Procedures & CA for Previously Identified Deficiencies IR 05000261/19950111995-05-0202 May 1995 Insp Rept 50-261/95-11 on 950403-07.No Violations Noted. Major Areas Inspected:Emergency Response Training,Emergency Notifications & Communications & Protective Action Decision Making IR 05000261/19950101995-04-28028 April 1995 Insp Rept 50-261/95-10 on 950327-31.No Violations Noted. Major Areas Inspected:Insp Conducted in Areas of Risked Based Operational Safety Including Control Room Observation & Review of Corrective Action Taken on Previous Insp Items IR 05000205/20030181995-04-17017 April 1995 Insp Rept 50-261/95-06 on 950205-0318.Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation & follow-up IR 05000227/20030031995-04-0909 April 1995 Insp Rept 50-261/95-07 on 950227-0303.Violations Noted. Major Areas Inspected:Design Changes & Plant Mods, Engineering & Technical Support & Follow Up on Previous Insp Findings IR 05000103/20020111995-03-0606 March 1995 Insp Rept 50-261/95-03 on 950103-0211.Noncited Violations Identified.Major Areas Inspected:Plant Operations,Maint Observation,Engineering Evaluation & Plant Support Activities IR 05000261/19950041995-02-24024 February 1995 Insp Rept 50-261/95-04 on 950123-27.No Violations or Deviations Noted.Major Areas Inspected:Semiannual Radiological Effluent Release Rept,Radiological Environmental Program & Process & Effluent Monitoring IR 05000261/19940281995-01-20020 January 1995 Insp Rept 50-261/94-28 on 941204-950102.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance Observation,Plant Safety Review Committee Activities & Followup IR 05000261/19940251994-10-13013 October 1994 Insp Rept 50-261/94-25 on 940912-16.No Violations or Deviations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities ML14181A6151994-10-0505 October 1994 Insp Rept 50-261/94-23 on 940821-0924.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Operator Overtime & Followup ML14181A6101994-10-0404 October 1994 Insp Rept 50-261/94-24 on 940912-16.Violations Noted.Major Areas Inspected:Review of Licensee Status Re Implementation of SBO Rule & Corrective Actions for Previous Inspection Findings in Electrical Area IR 05000261/19940191994-09-0707 September 1994 Insp Rept 50-261/94-19 on 940724-0820.No Violations Noted. Major Areas Inspected:Plant Operations,Surveillance Operations,Maint Observation,Plant Support & Followup 1999-07-30
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter 2024-09-11
[Table view] Category:UTILITY
MONTHYEARIR 05000261/19900211990-10-16016 October 1990 Insp Rept 50-261/90-21 on 901001-05.Violation Noted.Major Areas Inspected:Observation of Inservice Insp & Work Activities IR 05000261/19900191990-09-11011 September 1990 Insp Rept 50-261/90-19 on 900820-24.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings IR 05000261/19900181990-09-0606 September 1990 Insp Repts 50-261/90-18 on 900813-17.Violations Noted,But Not Cited.Major Areas Inspected:Radiological Effluents,Plant Chemistry,Confirmatory Measurements,Pass & Radiation Monitoring IR 05000261/19900171990-09-0606 September 1990 Insp Rept 50-261/90-17 on 900711-0810.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation,Onsite Review Committee & Written Repts of Nonroutine Events IR 05000261/19900101990-08-0707 August 1990 Insp Rept 50-261/90-10 on 900521-25,0604-08,25-29 & 0713.No Violations or Deviations Noted.Major Areas Inspected: in-depth Team Insp of Maint Program & Implementation IR 05000261/19900161990-08-0202 August 1990 Insp Rept 50-261/90-16 on 900716-20.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing & Followup on Previous Insp Findings.Weaknesses Identified for Valves in Component Cooling Water Sys IR 05000261/19900151990-08-0202 August 1990 Insp Rept 50-261/90-15 on 900710-13.No Violations or Deviations Noted.Major Areas Inspected:Inspector Follow Up Items & Violations Re Electrical & Fire Protection Sys & Licensee Fire Protection Program IR 05000261/19900141990-08-0202 August 1990 Insp Rept 50-261/90-14 on 900611-0710. No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation, self-assessment Capability & Outage Preparations IR 05000261/19900121990-07-0202 July 1990 Insp Rept 50-261/90-12 on 900511-0610.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Esf Sys Walkdown,Maint Observation & Onsite Followup of Events IR 05000261/19900051990-04-24024 April 1990 Insp Rept 50-261/90-05 on 900311-0410.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Maint Observation & Insp of Quality Verification Functions IR 05000261/19900071990-04-19019 April 1990 Insp Rept 50-261/90-07 on 900402-06.No Violations or Deviations Identified.Major Areas Inspected:Design Changes & Mods IR 05000261/19900061990-04-16016 April 1990 Operational Safety Team Insp Rept 50-261/90-06 on 900402-05. No Violations Noted.Major Areas Inspected:Review of Four Violations,One Unresolved Item & Ten Inspector Followup Items IR 05000261/19900041990-04-0404 April 1990 Insp Rept 50-261/90-04 on 900319-23.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Commercial Grade Procurement & Licensee Action on Previously Identified Insp Findings ML14176A8441990-03-0808 March 1990 Insp Rept 50-261/90-02 on 900111-0220.Violation Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation & Onsite Followup of Events at Operating Power Reactors IR 05000261/19900011990-02-26026 February 1990 Insp Rept 50-261/90-01 on 900129-0202.No Violations or Deviations Noted.Major Areas Inspected:Licensee Corrective Action on Previous Insp Findings,Radiographic Film & 1988 Refueling Outage Inservice Insp 90-day Rept IR 05000261/19890321990-02-0808 February 1990 Insp Rept 50-261/89-32 on 891216-900110.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Followup of Events at Reactors ML14176A8311990-01-29029 January 1990 Insp Rept 50-261/89-31 on 891212-13.No Violations or Deviations Noted.Major Areas Inspected:Sequencing & Loading Electrical Safeguards Equipment Onto Safety Buses in Response to Unresolved Item 89-25-02 Re Overlap Problem IR 05000261/19890291990-01-11011 January 1990 Partially Withheld Insp Rept 50-261/89-29 on 891204-08 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Protected Area Assessment.Major Areas Inspected:Physical Security Program, Including Audits,Barriers,Access Controls & Alarm Stations IR 05000261/19890251990-01-0808 January 1990 Insp Rept 50-261/89-25 on 891111-1215.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Esf Walkdown & Evaluation of self-assessment Capability IR 05000261/19890271989-12-11011 December 1989 Insp Rept 50-261/89-27 on 891113-16.No Violations or Deviation Noted.Weaknesses Noted.Major Areas Inspected: Annual Emergency Response Exercise & Emergency Organization Activation & Response in Control Room IR 05000261/19890241989-11-21021 November 1989 Partially Withheld Insp Rept 50-261/89-24 on 891016-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Physical Security Program for Power Reactors,Specifically Mgt Support/Plans & Alarm Stations IR 05000261/19890281989-11-16016 November 1989 Insp Rept 50-261/89-28 on 891030-1103.No Violations or Deviations Noted.Major Areas Inspected:Organization & Mgt Controls,Control of Radioactive Matls & Contamination Surveys & Followup on Previous Inspector Identified Items IR 05000261/19890171989-10-0606 October 1989 Insp Rept 50-261/89-17 on 890811-0910.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance & Maint Observations & Event Followup IR 05000261/19890211989-09-29029 September 1989 Partially Withheld Insp Rept 50-261/89-21 on 890911-15 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000261/19890181989-09-14014 September 1989 Insp Rept 50-261/89-18 on 890814-0908.Violations Noted.Major Areas Inspected:Inoperability of Auxiliary Feedwater Sys IR 05000261/19890201989-09-14014 September 1989 Insp Rept 50-261/89-20 on 890827-0901.No Violations Noted. Major Areas Inspected:Selective Exams of Procedures & Representative Records,Interviews W/Personnel & Observation of Activities in Progress IR 05000261/19890151989-09-0707 September 1989 Insp Rept 50-261/89-15 on 890814-17.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies,Organization & Mgt Control & Training IR 05000261/19890131989-08-31031 August 1989 Insp Rept 50-261/89-13 on 890711-0810.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation & Followup on Corrective Action for Violations IR 05000261/19890141989-08-24024 August 1989 Insp Rept 50-261/89-14 on 890731-0804.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Plant Chemistry & Environ Monitoring ML14176A7551989-07-12012 July 1989 Insp Rept 50-261/89-200 on 890522-26.No Violations Noted. Major Areas Inspected:To Determine Whether Motor Operated Valves Designed,Installed & Being Maintained in Manner That Would Ensure Capability to Perform ML14191B1161989-05-18018 May 1989 Insp Rept 50-261/89-08 on 890311-0417.Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Followup of Events at Operating Power Reactors ML14191B0991989-03-10010 March 1989 Insp Rept 50-261/89-03 on 890111-0210.Violations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Review Committee IR 05000261/19890061989-03-0303 March 1989 Insp Rept 50-261/89-06 on 890206-09.Licensee-identified Item Re Failure to Follow Procedures for Access Into Radiation Area Noted.Major Areas Inspected:Procedures Re Transfer of Spent Fuel from Spent Fuel Pool to ISFSI IR 05000261/19890041989-02-23023 February 1989 Insp Rept 50-261/89-04 on 890130-0203.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Chemistry & Health Physics Practices Associated W/Spent Fuel Transfer Operations IR 05000261/19880381989-02-0606 February 1989 Insp Rept 50-261/88-38 on 881211-890110.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance & Maint Observation & Onsite Followup of Events at Reactors & Mods ML14191B0731989-01-19019 January 1989 Insp Rept 50-261/88-36 on 881219-21.Violations Noted.Major Areas Inspected:Followup on Recently Identified Operating Events Involving Nonenviron Qualified Splices on Containment Fans & RCS High Point Vent Sys Not on Master List IR 05000261/19880311989-01-11011 January 1989 Insp Rept 50-261/88-31 on 881212-16.No Violations or Deviations Noted.Major Areas inspected:post-fire Safe Shutdown Capability Reverification & Assessment (Module 64510),including Functioning Configuration Mgt Program IR 05000324/19880331989-01-11011 January 1989 Insp Repts 50-324/88-33 & 50-325/88-33 on 880919-23.No Violations or Deviations Noted.Major Areas Inspected: Licensee Program to Maintain Occupational Exposures ALARA IR 05000261/19880351988-12-30030 December 1988 Corrected Rept Cover Sheet to Insp Rept 50-261/88-35 on 881128-1202.No Violations or Deviations Noted.Major Areas Noted:Resistance Temp Detector Bypass Elimination & Svc Water Sys Piping Replacement Mods IR 05000261/19880141988-12-21021 December 1988 Insp Rept 50-261/88-14 on 881128-1202.No Violations or Deviations Noted.Major Areas Inspected:Resistance Temp Detector Bypass Elimination & Svc Water Sys Piping Replacement Mods IR 05000261/19880331988-12-20020 December 1988 Insp Rept 50-261/88-33 on 881114-18.No Violations or Deviations Noted.Major Areas Inspected:Design Control,Design Changes & Mods IR 05000261/19880341988-12-20020 December 1988 Insp Rept 50-261/88-34 on 881111-1210.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance Observation,Maint Observation & Onsite Followup of Events ML14191B0321988-12-0909 December 1988 Insp Rept 50-261/88-30 on 881011-1110.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance Observation,Maint Observation & Onsite Followup of Events IR 05000261/19880231988-10-12012 October 1988 Corrected Page to Insp Rept 50-261/88-23 on 880811-0910.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Physical Protection, Surveillance Observation & Maint Observation ML14191B0151988-10-12012 October 1988 Insp Rept 50-261/88-23 on 880811-0910.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance & Maint Observation,Esf Sys Walkdown & Onsite Review Committee IR 05000261/19880271988-10-0505 October 1988 Insp Rept 50-261/88-27 on 880912-14.No Violations or Deviations Noted.Major Areas Inspected:Biofouling of Containment Coolers.Licensee Actions After Identification of Potential Compromise of Containment Integrity Comprehensive IR 05000261/19880251988-09-28028 September 1988 Insp Rept 50-261/88-25 on 880829-0902.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention.Weakness Noted:During Exercise,One Individual Did Not Don self-contained Breathing Apparatus in Auxiliary Bldg IR 05000261/19880221988-09-19019 September 1988 Insp Rept 50-261/88-22 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities,Equipment, Instrumentation,Supplies & Organization & Mgt Control IR 05000261/19880241988-09-0707 September 1988 Insp Rept 50-261/88-24 on 880725-29.No Violations Noted. Major Areas Inspected:Svc Water Design Verification & Survey of Current Svc Water Initiatives.Potential Deficiencies Identified Re Svc Water Sys Per Updated FSAR Design IR 05000261/19880201988-08-31031 August 1988 Insp Rept 50-261/88-20 on 880801-03.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Key Emergency & Organizational Functions During partial-participation Exercise.Related Info Encl 1990-09-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-039, on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected1999-09-30030 September 1999 PNO-II-99-039:on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected IR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980031998-06-0909 June 1998 Errata to Notice of Violation of Insp Rept 50-261/98-03, Conducted on 980105-09.Correction Reflects More Accurately That Licensee Actions Taken to Correct Violation Were Ineffective in Correcting Condition IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors ML14181A9961998-03-12012 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:As of 970407,licensee Failed to Revise UFSAR to Include Following Effects of Changes Made in Facility or Procedures as Described in UFSAR ML14181A9911998-03-0404 March 1998 Notice of Violations from Insp on 980105-09.Violations Noted:Licensee Failed to Verify Adequacy of Design to Substantiate Final Design Documents Met Design Inputs & Adequate for Design Change Affecting Pumps B & C IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9811998-02-0606 February 1998 Notice of Violation from Insp on 980105-09.Violation Noted: as of 970407,licensee Failed to Correct Conditions Adverse to Quality Associated W/Instrument Sensing Line Slope Deficiencies Documented in Ltrs & 960221 ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 07100012/20110221997-12-22022 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Accomplish Mod Related Activities as Evidenced.On 971007,licensee Did Not Evaluate Post Mod Test Acceptance Criteria for Measuring Total Air Flow ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML14181A3961997-12-0909 December 1997 EN-97-111:on 971212,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Identify Promptly & Correct Mispositioned EDG Output Breaker Switch ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML14181A9481997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:Reactor Trip Channels Had Not Been Calibrated IAW Formula Specified in TS 2.3.1.2.e IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A9001997-04-18018 April 1997 Notice of Violation from Insp on 970209-0322.Violation Noted:On 970224,during Performance of Special Process Procedure SPP-002,freeze Plugging of Piping Not Requiring Brittle Fracture Steps 7.3.3,7.3.8 & 7.3.9 Not Followed IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8541996-12-16016 December 1996 Notice of Violation from Insp on 960928-1116.Violation Noted:On 961016,operations Surveillance Test Procedure OST-160 Pressure Isolation Check Valve Back Leakage Test, Rev 23,inadequate,did Not Provide Adequate Instructions ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A8461996-10-25025 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Between 960917-19,shift Supervisors Assigned to Shifts Failed to Ensure That FMEA Controls Were Maintained in SFP Bldg While Fuel off-load Was Ongoing IR 05000261/19963011996-09-20020 September 1996 Exam Rept 50-261/96-301 on 960816-24.Exam results:14 SROs Passed & 1 Failed IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8151996-04-25025 April 1996 Notice of Violation from Insp on 960311-0404.Violation Noted:From 951128 to 960309,licensee Allowed Access to Protected Area Using Hand Geometry Sys W/O Having Conducted Tests to Ensure Equipment Met 90% Detection Probability ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training ML14182A2821996-03-12012 March 1996 Notice of Violation from Exam on 960209-15.Violation Noted: Licensee Failed to Take Adequate Corrective Action to Correct Deficiency Previously Identified ML14181A8041996-02-16016 February 1996 Notice of Violation from Insp on 960101-20.Violation Noted: Operating Procedure OP-402 Was Not Properly Implemented in That AFW-110 & AFW-111 Were Not Maintained Fully Open IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support ML14181A7991996-01-26026 January 1996 Notice of Violation from Insp on 960126-31.Violation Noted: PIC-012 Did Not Provide Adequate Instructions for Ensuring That Accumulator Level Properly Calibr IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function 1999-09-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Il 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 Report No. 50-261/81-26 Licensee:
Carolina Power & Light Company 411 Fayetteville Street Raleigh, N.: C. 27602 Facility Name: H. B. Robinson Steam Electric Plant Docket No. 50-261 License No. DPR-23 Inspection at H. B. Robinson Unit 2 Inspector:
-4-+
A-tS. Weise, Resident Inspector Date Signed Approved by:
_
__
__
C. Jilian( cting Section Chief Date Signed Division of Resident and Reactor Project
)A Inspection W SUMMARY Inspection on August 11, - September 4, 1981 Areas Inspected This routine announced inspection involved 128 resident inspector-hours on site in the areas of technical specification compliance, plant tour, operations performance, reportable occurrences, housekeeping, site security, surveillance activities, TMI action plan requirements, maintenance activities, quality assur ance practices, radiation control activities-outstanding items review, followup on enforcement matters, and independent inspection effor Results Of the 14 areas inspected, no violations or deviations were identified in 13 areas; one violation was found in one area (failure to implement procedures, paragraph 7.c).
DETAILS 1. Persons Contacted Licensee Employees
- R. B. Starkey, Plant General Manager J. M. Curley, Manager, Technical Support R. Chambers, Maintenance Supervisor Unit 2 F. Lowery, Operations Supervisor Unit 2
- F. Gilman, Senior Supervisor Unit 2 S. Crocker, Manager, Environmental & Radiation Control
- C. Wright, Specialist, Regulatory Compliance W. Dorman, Load Quality Assurance Auditor
- W. Crawford, Manager, Operations and Maintenance
- D. Waters, Principal Engineer - Operations
- R. Connally, Assistant to Plant General Manager
- W. Flanagan, Project Engineer
- D. Stadler, Senior Specialist Nuclear Licensing Other licensee employees contacted included technicans, operators, mechanics, security force members, and office personne *Attended exit interview 2. Exit Interview The inspection scope and findings were summarized on September 4, 1981, with those persons indicated in paragraph 1 above. The licensee'acknowledged the violation and the areas of inspector concern, and agreed to review the concern and take corrective action, as necessar. Licensee Action on Previous Inspection Findings (Closed) Unresolved item 80-26-05. This item concerned the licensee's failure to have a procedure for handling and storage of compressed gas cylinders. The licensee has implemented Administrative Instructions Section 11.8 to govern handling, storage, and use of compressed gas cylinders. The instructions appear adequate. Plant tours conducted by the inspector have identified only one incident where one gas cylinder was improperly stored, and the licensee took corrective action to rectify the deficiency. This item is close. Unresolved Items Unresolved items were not identified during this inspectio. Technical Specification Compliance a. During this reporting interval, the inspector verified compliance with selected limiting conditions for operation (LCO's) and reviewed results of selected surveillance tests. These verifications were accomplished by direct observation of monitoring instrumentation, valve positions, switch positions, and review of completed logs and records. The licensee's compliance with selected LCO action statements were reviewed as they happene b. On August 21,.1981, while reviewing Engineered Safety Feature (.ESF)
instrumentation surveillance and operability Technical Specification (T.S.) requirements, the inspector determined that licensee startup procedures could allow operation in the hot shutdown mode without having performed T.S. surveillances on ESF instrumentation. T. Table 3.5-3 requires the plant to be in the cold shutdown condition if minimum ESF instrumentation channel operability is not maintaine T.S. Table 4.1-1 provides the frequencies for testing of instrumen tation to verify operability. While in the cold shutdown condition, licensee surveillance procedures allow postponement of instrumentation surveillance until just prior to plant startup (i.e., pulling control rods to criticality). Plant startup procedures are addressed in GP-2, Cold Solid to Hot Subcritical, and in GP-3A, Normal Plant Startup from 547 0F Hot shutdown to critica Based on T. S. Table 3.5-3 it appears that the surveillance requirements of T.S. Table 4.1-1 shoul.d be met either prior to leaving the cold shutdown mode or prior to unblocking applicable ESF instrumentation. Procedure GP-2 governs both the mode change from cold to hot shutdown and the unblocking of ESF instrumen tation, however, the surveillance tests associated with the ESF in
- strumentation (Periodic Tests 5.1, 5.2, 5.6, 5.7, 11.1) are never verified as acceptably performed. Instead, procedure GP-3A requires this verification after the plant is in hot shutdown at 5470 F. Thus, it is conceivable that an ESF instrument failure could go undetected and reduce the level of protection. The inspector, however, was unable to find a past case when this had occurre Based on the above, the inspector informed licensee management that PT 5.1, Tavg and A T Protection Channel Testing (Low Tavg ESF portion),
and PT 11.1, Containment Pressure Protection Channel Testing were required prior to the unblocking of the low Tavg ESF feature and prior to exceeding 200'F, repectively. The licensee was responsive and ensured that all five ESF PT's were performed prior to exceeding 200' This action required that temporary procedure changes be used on several surveillance tests to provide appropriate dummy input signal This was necessary since several existing procedures (PT's 5.1, 5.2, 5.7) were not written for performance in the cold shutdown mode. The licensee is evaluating necessary permanent corrective actions, including separate testing procedures for cold shutdown.and amendments to the Technical Specifications. Until the licensee fully resolves these concerns, this item is ope (50-261/81-26-01)
- 3 Plant Tour The inspector conducted plant tours periodically during the inspection interval to verify that monitoring equipment was recording as required, equipment was properly tagged, operations personnel were aware of plant conditions, and plant housekeeping efforts were adequate. The inspector determined that appropriate radiation controls were properly established, excess equipment or material was stored properly, and combustible material was disposed of expeditiously. During tours the inspector looked for the existence of unusual fluid leaks, piping vibrations, pipe hanger and seismic restraint abnormal settings, various valve and breaker positions, equipment clearance tags and component status, adequacy of firefighting equipment, and instrument calibration dates. Some tours were conducted on backshifts. The inspector performed major flowpath valve lineup verifications and system status checks on the following systems:
(1) Safety Injection System (2) Containment Spray System (3) Selected containment isolation valves (d) Motor driven Auxiliary Feedwater Syste The inspector noted no violations or deviation.
Plant Operations Review a. The inspector periodically during the inspection interval reviewed shift logs and operations records, including data sheets, instrument traces, and records of equipment malfunctions. This review included control room logs, auxiliary logs, operating orders, standing orders, jumper logs and equipment tagout records. The inspector routinely observed operator alertness and demeanor during plant tours. During abnormal events, operator performance and response actions were observed and evaluated. The inspector conducted random off-hours inspections during the reporting interval to assure that operations and security remained at an acceptable leve Shift turnovers were observed to verify that they were conducted in accordance with approved licensee procedures. The inspector had no further comment b. The inspector witnessed portions of an audit conducted by licensee corporate personnel to verify conformance to Technical Specification requirements and quality control procedures. The inspector verified that the audit personnel were independent of the audited organization and for a sampling of audit areas verified that the required audit frequency was met. The inspector reviewed several previous audits to verify that audit report was made to management within the required time and that corrective actions had been scheduled and/or taken for selected audit findings. The inspector has a concern in the area of
0
audit personnel qualification. In discussions with the lead auditor, it appears that written qualification exams are being maintained by contractors (vice the licensee) for lead auditors. This does not appear to conform to ANSI N45.2.23-1978. This matter is being further investigated under IE Inspection Report 50-261/81-2 c. On September 3, 1981, a review of the plant Jumper and Wire Removal Log revealed that activities 722 and 723 (lifted leads) were in effect while in the cold and hot shutdown modes during the period August 1, through September 1, 1981. This modified the auxiliary feedwater relay coils to allow opening of the steam generator blowdown valves with low steam generator water level conditons existing. These two relays are part of the loss of heat sink protection system and were erroneously considered nonsafety-related. Thus, the activities were not performed in accordance with the licensee's procedures. Administrative Instruc tions, Section 11.11.3 requires the Shift Foreman to determine if the affected component is safety-related (Q-list) by reference to Engineer ing Procedure-2 (Eng-2), Q List Contro Reference to ENG-2, Sections 11.5.10 and 11.5.28 should have resulted in a safety related classifi cation. Safety-related circuitry wire removal procedures then require that the operating Supervisor or his designated alternate determine if the component is made inoperable and, if so, must authorize wire removal on the required control form. Wire removal is then approved by the Shift Foreman, and removal accomplished and independently verified by a qualified plant operator. Re-installation is similarly controlled. In this case, reinstallation was independently verified since the same discrepancy had been identified to the particular Shift Foreman by an NRC inspector in July 1981, for activities 691 and 69 The above failure to implement procedures is a violatio (50-261/81-26-09)
8. ESF Reset Concerns On August 27, 1981, discussions between NRR, IE, CP&L, and the inspector determined that portions of the Engineered Safety Features circuitry had design deficiencies that under certain circumstances could cause the blocking of both automatic and manual safety system actuation signal Basically, the reset of the following features with the original actuating signal still present would block other safety signals including the manual pushbutton input:
a. Phase A Containment Isolation b. Phase B Containment Isolation c. Containment Ventilation Isolation d. Containment Spray Actuation e. Feedwater Isolation The result of these discussions was that prior to plant startup, the licensee would issue administrative controls/instructions to establish
5
criteria on the use of the above ESF resets and on required operator actions should the reset function be used in error. This guidance was issued as Standing Order-15 on August 29, 198 Review of the Standing Order was required by all oncoming operators prior to assuming the shift. The inspector reviewed the above procedure and its implementation and had no questions. A cover was also installed over the reset buttons to prevent inadvertent actuatio The licensee issued a letter to NRR on August 29, 1981, describing the above actions, the affected ESF circuitry, and a plan of action for a permanent fix of the problem. This is an inspector followup ite (50-261/81-26-02)
9. Physical Protection The inspector verified by observation and interview during the reporting interval that measures taken to assure the physical protection of the facility met current requirements. Areas inspected included the organi zation of the security force, the establishment and maintenance of gates, doors and isolation zones in the proper condition, that access control and badging was proper, that search practices were appropriate, and that escorting and communications procedures were followe.
Personnel Overexposure On August 21, 1981, the licensee informed the inspector that an individual
.marking steam generator (S/G) tubes in the B S/G had received an exposure to the head in excess of the licensee's administrative limit and in excess of the 10 CFR 20.101(a) limit. This overexposure had occurred on August 15, 1981. A detailed discussion of this event is provided in IE inspection report 50-261/81-2.
Steam Generator Outage This outage description is a continuation of the discussion in IE inspection report 50-261/81-22. Two S/G tube samples were removed and sent to Westing house for analysis, one tube with tube wall degradation and one without. On August 13, 1981 a meeting was held between CP&L, Westinghouse, and NRR concerning analysis of the S/G tube degradation and corrective actions to allow further operation. The hot leg tube degradation was characterized as intergranular in the tube sheet region and caustic stress cracking above the tube sheet. CP&L's proposed corrective action included tube plugging, sludge lancing the secondary side of the S/G, conducting a crevice flushing procedure to remove chemicals from crevice regions, elimination of copper from the secondary system, and operation at about 50% power to achieve a reduction in hot leg temperature. These corrective actions are discussed in CP&L's license amendment request letters dated August 21 and 27, 198 NRR provided an approved license amendment and safety evaluation by letter dated August 28, 198 Prior to plant startup, the licensee conducted tube plugging, sludge lancing, and an extensive special procedure intended to remove undesirable chemicals from the S/G secondary in general and the tube crevices in partic ular. This special procedure (SP-326) also included phosphate conditioning during heat-up and at power. The plant returned to power operation on September 2, 198.
TMI Action Plan Requirements a. TAP No. II.E.4.1,,NUREG 0737; Section 2.1.5.a, NUREG 0578, Dedicated Hydrogen Penetration This item required the inspector to verify that any needed modifi cations to these penetrations had been made. The inspector reviewed the NRR letters of October 30, 1979, and April 18, 1980; the CP&L letters of December 31, 1979 and March 31, 1980; and the applicable System Description (SD-39) and Emergency Instruction (EI-16) of the plant operating manua The original design of the Robinson Post Accident Containment Venting System appears to meet the present re quirements and, therefore, no system modifications were needed. This item is close b. TAP No. II.E.1.1, NUREG 0737, Auxiliary Feedwater System (AFWS)
Evaluation. This item required the inspector to verify that the short term actions required by NRR for increasing the reliability of the AFWS have been accomplished. The following references were reviewed:
Reference 1 NRR Requirements letter dated September 21, 1979 Reference 2 CP&L response letter GD-79-2764 dated October 31, 1979 Reference 3 NRR letter dated March 31, 1980 Reference 4 CP&L response letter NO-80-746 dated May 15, 1980 Reference 5 NRR Interim Safety.Evaluation dated December 2, 1980 Reference 6 CP&L response letter No-81-063 dated January 9, 1981 Reference 7 CP&L letter NO-81-937 dated June 8, 1981 (1) Generic recommendation GS-1. This required the licensee to propose modifications to their Technical Specifications on AFWS pump and its associated flow train and essential instrumentation operability to be consistent with current Technical Specifica tions. In reference 4, the licensee proposed Technical Specifi cations not in compliance with the NRR recommendation Refer ences 6 and 7 further stated the licensee's justification for taking their position on operability. NRR is continuing to review this item. This is an open item (50-261/81-26-03).
(2) Generic recommendation GS-2. References 2 and 4 state that the valves in the supply piping between the condensate storage tank
(CST)
and the suction of each of the three AFW pumps are maintained in a locked open positio Plant Operating Procedure OP-14A requires the valves to be locked open and independently verified, and the keys are maintained under Shift Foreman's control. Monthly verification is not provided by OP-14 Periodic Tests (PT) 22.1A, B, and C, AFWS Component Test, conducted monthly, verify that the suction flowpath is available by requiring each pump to provide flow through a recirculation pat Actual valve position is not verified in this test by physically checking the valve. This test also does not verify the position of the individual pump discharge valves since the recir culation line is located between the pump discharge and the discharge valve. The discharge valves, however, are locked in a throttled position and independently verified in accordance with OP-14 Reference 5 is incorrect in stating that OP-14A provides for a monthly verification of the position of specific suction valves, however, the system testing conducted appears to meet the intent of this requiremen (3) Generic recommendation GS-3. Not applicabl (4) Generic recommendation GS-4. This item concerns providing emergency procedures for transferring to alternate sources of AFW supply. OP-14 and EI-17 (Station Blackout) provide criteria to inform the operator when and in what order the operator should transfer to alternate water sources when the primary water supply is being deplete The Precautions, Limitations, Setpoints PLS-15 procedure provides guidance in the case in which backup water supply is deemed necessary. The inspector is concerned that the procedures do not specifically address the desired valve lineup for AFW suction supply should the CST be declared inoperable. The licensee agreed to review this concern and take corrective actions as necessar This is an open item.
(50-261/81-26-04)
(5) Generic recommendation GS-5. This item required the as-built plant to be able to provide required AFW flow independent of any alternating current power source. In references 2 and 4, the licensee indicated that while the turbine driven AFW pump can run for two hours independent of AC power, manual operator action is required to realign the cooling water valves for the lube oil cooler, open the main steam admission valves to the turbine, and open the pump discharge isolation valve Emergency Instruction EI-7, Station Blackout Operation, has been implemented and incor porates the manual actions, as require (6)
Generic recommendation GS-6. This item requires the licensee to confirm flowpath availability of an AFWS flow train that has been out of service for testing or maintenance. General Procedure (GP)-2 and OP-14 require that the two motor driven (MD) AFW pumps and the steam driven (SD) AFW pump be used to individually feed the steam generators on any heatup from cold shutdown. OP-14 requires that each MD AFW pump be used to individually feed the steam generator following pump maintenance. The AFWS valve lineup procedure OP-14A requires a second operator to independently verify proper valve position of all AFW valves. The Operations Work Procedures for the AFWS require two independent verifications of affected valve and breaker positions prior to and following maintenanc (7) Generic recommendation GS-7. This item requires the upgrading of the automatic start AFWS signals and associated circuitry. The inspector reviewed references 1 through 5 and CP&L's letter dated December 31, 1979. The inspector had no further question (8) Generic recommendation GS-8. Not applicabl (9) Plant specific recommendation 7. This item requires periodic testing of the normally locked closed service water and deep well manual valves. In references 4 and 6, the licensee committed to demonstrate operability of these valves quarterly by manually cycling the valves. These actions are implemented by PT 40.0, Quarterly Inservice Inspection Valve Test. The inspector had no further question (10) Plant specific recommendation 8. This item requires Technical Specifications to provide for monthly testing of all steam admission valves to the SD AFW pump. All motor operated steam admission valves are to be tested on a monthly basis by PT 22.1 in accordance with Technical Specification 4. (11) Additional short term recommendation 1. This item requires redundant condensate storage tank (CST) level indications and low level alarms in the control room, and for the long term, instrumen tation should be upgraded to safety grade. The existing CST is equipped with redundant level indication and one low level alarm which allows about 35 minutes for operator action. The licensee committed in reference 6 to install a separate low level alarm system by January 1, 1982, This is an inspector followup item (50-261/81-26-05).
Additionally, on August 21, 1981, the inspector toured the area of the CST, inspected its instrumentation, and reviewed applicable procedures. The following deficiencies were noted:
(a) Precautions, Limitations, Setpoints (PLS)-13 stated that the high level alarm LSH-1453 occurred at 8' 7" and the low level alarm LSL-1453 occurred at 7' 11".
The as-built condition and CP&L drawing 5379-1581 revealed that the high level alarm taps were about 18 feet above and the low level alarm taps about 2 feet below the respective PLS-13 values. This was confirmed by the licensee and the PLS-13 values promptly corrected. This correction did not affect the licensee's calculation on available CST water, since the Technical Specification limit of 19% (35,000 gallons) was used vice the erroneous low level alarm valu (b) Wiring for low level alarm LSL-1453 was not contained in its conduit. The spliced wires were pulled out of the conduit and directly exposed to the weather. The licensee corrected this deficiency promptl (c) The level indication for the CST was not redundant at the time of the inspection due to the failure low of LT-1454B on May 28, 1981. The licensee is awaiting parts, with no expected delivery date. This is inspector followup item (50-261/82-26-06).
(d) Plant Operating Manual, Volume 16, page C-1-39 of the Annunciator Procedures was reviewed. This document stated that LSL-1453 alarmed at 95% CST level and LSH-1453 showed no alarm valu Based on (a) above, this was erroneous. The licensee confirmed the error and promptly corrected this procedure to reflect a high level alarm of 97% and a low level alarm of 19%.
(e) The CST low level alarm LSL-1453 is a magnetic float switch whose actuation level is governed by the fixed piping attached to the CST. While calibration per se is not possible, a functional test to verify operation is not performed and appears necessary. Operation could be verified periodically by isolating the level switch and draining the water column to verify receipt of the alarm. This is an open item (50-261/81-26-07) pending licensee revie (12) Additional short term recommendation 2. This item required the licensee to perform an endurance test on all AFWS pump Endurance testing was conducted on the steam driven pump in August 1980 and on the motor driven pumps in August - September 198 The inspector reviewed the test report package and the special procedure, SP-251. The data package contained the required information as discussed in reference 5. A review of this data indicated that the pumps operated within design limits during the test. The inspector had no further question (13) Additional short term recommendation 3. This requires the licensee to install safety grade indication of AFW flow in the control room. This area was addressed under TAP No. II.E.1.2, Item 2c, NUREG 0737 in IE inspection report 50-261/81-2 (14) Additional short term recommendation 4. Not applicabl. Licensee Event Report (LER) Followup The inspector reviewed the following LER's to verify that the report details met license requirements, identified the cause of the event, described appropriate corrective actions, adequately assessed the event, and addressed any generic implications. Corrective action and appropriate licensee reveiw of the below events was verified. The inspector had no further comment LER Event 81-17
'A'
Auxiliary Feedwater Pump Trip 81-18 Throttled Instrumentation Root Valve 81-19
'A'
Service Water Booster Pump Trip 14. Outstanding Items Review a. (Closed) Inspector Followup Item 80-29-01. This item concerned failures of the containment personnel hatch door. Further investiga tion of this item was discussed in inspection report 50-261/81-22 under LER 80-24, and is being tracked as item 81-22-05. This item is close b. (Closed) Open item 81-02-0 This item concerned the licensee's failure to include the status of retraining requirements of 10 CFR 55, Appendix A, Section 3.c. in the monthly training status report. The inspector reviewed the monthly training reports for 198 As of March, 1981, the status of Section 3.c requirements were being listed on the report. The inspector noted on the July report that five of the sixteen overdue required reading items were five months overdu This appears excessive and will be re-inspected. This item is close c. (Closed) Inspector Followup Item 81-15-08. This item concerns the adequacy of the licensee's housekeeping procedures. The licensee issued Administrative Instruction Section 11.12 on August 14, 198 The inspector reviewed this instruction and the requirements of ANSI N45.2.3-1973. The inspector reviewed the CP&L plant inspection reports file (2-0-19) for the required documentation of housekeeping statu Adequate housekeeping inspections and associated deficiency lists were recorded, and corrective actions had been initiated. The inspector had no further question.
Independent Inspection Effort Due to the inconsistencies found between as-built alarm setpoints and licensee procedures discussed in paragraph 12.b, the inspector observed conditons at the Refueling Water Storage Tank (RWST) and Spray Additive Tank (SAT) and then reviewed the licensee's drawing CP 200-5379-1082, Annunciator Procedures, Calibration sheets, and Precautions, Limitations, Setpoints (PLS) procedures. The RWST has three level alarms associated with i Level comparator LC-948 provides a low level alarm at 27% and a low-low alarm at 9%. Level comparator LC-948A provides a high level alarm at 95%.
Level indicator LI-947 provides local level indication and LI-948 provides control board indicatio The following discrepancies werenoted:
a. PLS-7 states that LI -947 provides a 27% low level alarm. There is no low level alarm associated with LI-94 b. Annuciator Procedure page A-2-3 states that LC 948A provides a 27% low level alarm vice LC 948 and that LC 948A provides a 94% high level alarm. Calibration sheets for LC-948A provide a 95% alarm poin c. Annunciator Procedure page A-2-11 states that LC 948B provides a 9%
low low level alarm vice LC-948. the inspector could find no LC-948,Based on the above findings, the inspector is concerned that licensee procedures are not being maintained accurate and consistent. The licensee plans to complete a review of his procedures by September 30, 1981. This item is open pending completion of this review (50-261/81-26-08).
No discrepancies were noted for the Spray Additive Tank instrumentatio S