IR 05000261/2021403

From kanterella
Jump to navigation Jump to search
Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed)
ML21334A005
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/29/2021
From: David Dumbacher
Division Reactor Projects II
To: Kapopoulos E
Duke Energy Progress
References
IR 2021403
Download: ML21334A005 (3)


Text

November 29, 2021

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000261/2021403 (OUO REMOVED)

Dear Mr. Kapopoulos Jr.:

On November 18, 2021, the U.S. Nuclear Regulatory Commission (N RC) completed an inspection at H.B. Robinson Steam Electric Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified du ring this inspection.

A licensee-identified violation which was determined to be of v ery low security significance is documented in this report. We are treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Reg ulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies t o the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at H.B. Robinson Steam Electric Plant.

This letter will be made available for public inspection and co pying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Enclosure(s) transmitted herewith contain(s) SUNSI. When separa ted from enclosure(s), this transmittal document is decontrolled. E. Kapopoulos Jr. 2

The enclosed report contains Security-Related Information, so t he enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that con tains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390( b)(1)(ii).

Sincerely,

/RA/

David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects

Docket No. 05000261 License No. DPR-23

cc w/o encl: Distribution via LISTSERV ML21334A005 (Cover letter)

Cover Letter Only: X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII: DRP RII: DRP NAME M. Toth D. Dumbacher DATE 11/24/2021 11/29/2021