Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARIR 05000261/19980031998-06-0909 June 1998 Errata to Notice of Violation of Insp Rept 50-261/98-03, Conducted on 980105-09.Correction Reflects More Accurately That Licensee Actions Taken to Correct Violation Were Ineffective in Correcting Condition ML14181A9961998-03-12012 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:As of 970407,licensee Failed to Revise UFSAR to Include Following Effects of Changes Made in Facility or Procedures as Described in UFSAR ML14181A9911998-03-0404 March 1998 Notice of Violations from Insp on 980105-09.Violations Noted:Licensee Failed to Verify Adequacy of Design to Substantiate Final Design Documents Met Design Inputs & Adequate for Design Change Affecting Pumps B & C ML14181A9811998-02-0606 February 1998 Notice of Violation from Insp on 980105-09.Violation Noted: as of 970407,licensee Failed to Correct Conditions Adverse to Quality Associated W/Instrument Sensing Line Slope Deficiencies Documented in Ltrs & 960221 IR 07100012/20110221997-12-22022 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Accomplish Mod Related Activities as Evidenced.On 971007,licensee Did Not Evaluate Post Mod Test Acceptance Criteria for Measuring Total Air Flow ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML14181A9481997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:Reactor Trip Channels Had Not Been Calibrated IAW Formula Specified in TS 2.3.1.2.e ML14181A9001997-04-18018 April 1997 Notice of Violation from Insp on 970209-0322.Violation Noted:On 970224,during Performance of Special Process Procedure SPP-002,freeze Plugging of Piping Not Requiring Brittle Fracture Steps 7.3.3,7.3.8 & 7.3.9 Not Followed ML14181A8541996-12-16016 December 1996 Notice of Violation from Insp on 960928-1116.Violation Noted:On 961016,operations Surveillance Test Procedure OST-160 Pressure Isolation Check Valve Back Leakage Test, Rev 23,inadequate,did Not Provide Adequate Instructions ML14181A8461996-10-25025 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Between 960917-19,shift Supervisors Assigned to Shifts Failed to Ensure That FMEA Controls Were Maintained in SFP Bldg While Fuel off-load Was Ongoing ML14181A8151996-04-25025 April 1996 Notice of Violation from Insp on 960311-0404.Violation Noted:From 951128 to 960309,licensee Allowed Access to Protected Area Using Hand Geometry Sys W/O Having Conducted Tests to Ensure Equipment Met 90% Detection Probability ML14182A2821996-03-12012 March 1996 Notice of Violation from Exam on 960209-15.Violation Noted: Licensee Failed to Take Adequate Corrective Action to Correct Deficiency Previously Identified ML14181A8041996-02-16016 February 1996 Notice of Violation from Insp on 960101-20.Violation Noted: Operating Procedure OP-402 Was Not Properly Implemented in That AFW-110 & AFW-111 Were Not Maintained Fully Open ML14181A7991996-01-26026 January 1996 Notice of Violation from Insp on 960126-31.Violation Noted: PIC-012 Did Not Provide Adequate Instructions for Ensuring That Accumulator Level Properly Calibr IR 05000917/20100211995-11-17017 November 1995 Notice of Violation from Insp on 950917-1021.Violation Noted:Lctr 95-01384 Did Not Provide Adequate Instructions for Ensuring That Air Start Sys Piping Associated W/B EDG Was Properly Isolated & Depressurized IR 05000618/20070151995-08-10010 August 1995 Notice of Violation from Insp on 950618-0715.Violation Noted:Fire Door to Pipe Alley Was Blocked Open for Approximately 30 Minutes W/O Notification of Operations Personnel IR 05000514/20060171995-07-17017 July 1995 Notice of Violation from Insp on 950514-0617.Violation noted:OMM-005 Was Not Followed in That Auxiliary Operator & Independent Verifier Initialed Local Clearance & Test Request Re Valve 20 IR 05000423/20050131995-06-12012 June 1995 Notice of Violation from Insp on 950423-0513.Violation Noted:Contracted Refueling Technician Failed to Follow Procedure FHP-001 IR 05000319/20040221995-05-19019 May 1995 Notice of Violation from Insp on 950319-0422.Violation Noted:Operators Failed to Follow Procedure OST-254 by Not Verifying RHR Sys to Be Aligned for Standby Low Pressure Injection ML14181A6661995-04-0707 April 1995 Notice of Violation from Insp on 950306-10.Violation Noted: Determined That Abnormal Operating Procedure AOP-014 Inadequately Maintained Re Insufficient Guidance for Connection of Cw to Two Pumps ML14181A6131994-10-0505 October 1994 Notice of Violation from Insp on 940821-0924.Violation Noted:On 940915,assigned Escort Left Two Visitors Unattended in Turbine Building While Escort Used Adjacent Restroom ML14181A6081994-10-0404 October 1994 Notice of Violation from Insp on 940912-16.Violation Noted: Licensee Test Activity on Plant Alternate AC Power Source & SBO Equipment Not Performed Adequately & According to Procedures ML14181A5811994-08-15015 August 1994 Notice of Violation from Insp on 940625-0723.Violation Noted:Resident Inspectors Identified That Train B Inlet & Outlet Filter Dampers for Tagged Shut W/No Limit on Time Equipment Could Remain Out of Svc ML14181A5621994-06-15015 June 1994 Notice of Violation from Insp on 940424-0521.Violation Noted:Wr/Jo 94-AEBT1 Inadequate & Did Not Provide Adequate Instructions for Ensuring That Control Room Differential Pressure Instrument DPI-6520 Properly Initialized ML14178A4961994-04-15015 April 1994 Notice of Violation from Insp on 940226-0326.Violation Noted:Three Radiation Monitor Setpoints Improperly Established Following Termination of Continuous Containment Vessel Purge on 940314 ML14178A4471994-02-18018 February 1994 Notice of Violation from Insp on 931226-940122.Violation Noted:Inadequate Debris Intrusion Control Measures Were Employed on 931115 ML14178A5271993-12-16016 December 1993 Notice of Violation from Insp on 931115-19.Violation Noted: Priority a Drawings Had Not Been Updated within 28 Working Days & Classified Overdue ML14178A4001993-11-0808 November 1993 Notice of Violation from Insp on 930912-1016.Violation Noted:Operator Deviated from OP-603 While Transferring Svc Water Pump D from Normal to Emergency Power ML14178A3921993-10-29029 October 1993 Notice of Violation from Insp on 930913-17 & 27-1001. Violations Noted:Onsite Equipment Certification/Calibration Documentation for Equipment on SG a & B Expired ML14178A3641993-07-0202 July 1993 Notice of Violation from Insp on 930515-0611.Violation Noted:Nrc Not Notified within 4 H of Notification of Sc Dept of Health & Environmental Control That Weir Discharge Temp Limits Had Been Exceeded ML14178A2701992-08-21021 August 1992 Notice of Violation from Insp on 920717-0807.Violation Noted:Written Procedures Were Not Implemented in That When CST High Level Alarm Was Received,Source of CST Makeup Water Was Throttled Instead of Being Stopped Per Procedures ML14178A2551992-07-22022 July 1992 Notice of Violation from Insp on 920615-19.Violation Noted: on 920615,feedwater Block Valve FW-2V-6A Failed to Close Fully Due to High Differential Pressure of 480 Psid ML14178A2451992-07-20020 July 1992 Notice of Violation from Insp on Stated Dates.Violation Noted:Licensee Failed to Follow Stated Procedures ML14178A1811991-12-16016 December 1991 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $37,000.Noncompliance Noted:Inadequate Control of Design Interfaces & Design Organizations Resulted in Failure to Adequately Check Design for SI Sys ML20138F7901991-04-12012 April 1991 Notice of Violation from Insp on 910216-0330.Violation Noted:Documented Instructions Were Not Provided for Method to Establish Temporary Heating Equipment to Maintain Reactor Vessel Head Flang Temp.Procedures & Drawings Not Provided ML14178A0871991-03-0505 March 1991 Notice of Violation from Insp on 910111-0215.Violations Noted:Procedure OST-351 Inadequately Established That Procedure Did Not Fully Test Steam Line Isolation Circuitry Associated W/Containment Pressure Channel ML20058H9781990-11-20020 November 1990 Notice of Violation from Insp on 901029-1102.Violation Noted:Inservice Insp Isometric Sketch Did Not Accurately Depict Actual Pipe Configuration ML14176A8841990-07-27027 July 1990 Notice of Violation from Insp on 900617-21.Violation Noted: Commitments for Activation of Operational Support Ctr & Technical Support Ctr Not Acceptably Demonstrated ML14191A9791988-08-12012 August 1988 Notice of Violation from Insp on 870309-0415.Violations Noted:Failure to Take Prompt Corrective Action to Determine Cause of Significant Conditions Adverse to Quality,Assure Correction & Preclude Repetition of Listed Events ML20196A9431988-06-15015 June 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Combination of ECCS Subsystem Assumed to Be Operative in Evaluation Model in Updated SAR Did Not Reflect Failures of ECCS Equipment ML14191A9141988-04-14014 April 1988 Notice of Violation from Insp on 880111-15 & 0125-29. Violation Noted:On Four Occasions Licensee Reported Inoperability of All Diesel Generators While Operating at 100 Percent Power Under Incorrect Regulation ML14175B4421986-10-31031 October 1986 Notice of Violation from Insp on 860911-1010 ML14175B3931986-06-18018 June 1986 Notice of Violation from Insp on 860407-11 & 0516 ML14175B3211985-08-27027 August 1985 Notice of Violation from Insp on 850729-0802 ML20027E4651982-10-0101 October 1982 Notice of Violation from Insp on 820811-0910 ML20062J4381982-06-24024 June 1982 Notice of Violation from Investigation on 820111-0223 ML20054H0711982-04-22022 April 1982 Notice of Violation from Insp on 820311-0410 ML20052G2581982-03-30030 March 1982 Notice of Violation from Insp on 820222-26 ML20053B4911982-03-16016 March 1982 Notice of Violation from Insp on 820125-0204.Noncompliance Noted:Failure to Implement Plant Emergency Procedure 43 ML20052C1711982-03-16016 March 1982 Notice of Violation from Insp on 820111-0210 1998-06-09
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-039, on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected1999-09-30030 September 1999 PNO-II-99-039:on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected IR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980031998-06-0909 June 1998 Errata to Notice of Violation of Insp Rept 50-261/98-03, Conducted on 980105-09.Correction Reflects More Accurately That Licensee Actions Taken to Correct Violation Were Ineffective in Correcting Condition IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors ML14181A9961998-03-12012 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:As of 970407,licensee Failed to Revise UFSAR to Include Following Effects of Changes Made in Facility or Procedures as Described in UFSAR ML14181A9911998-03-0404 March 1998 Notice of Violations from Insp on 980105-09.Violations Noted:Licensee Failed to Verify Adequacy of Design to Substantiate Final Design Documents Met Design Inputs & Adequate for Design Change Affecting Pumps B & C IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9811998-02-0606 February 1998 Notice of Violation from Insp on 980105-09.Violation Noted: as of 970407,licensee Failed to Correct Conditions Adverse to Quality Associated W/Instrument Sensing Line Slope Deficiencies Documented in Ltrs & 960221 ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 07100012/20110221997-12-22022 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Accomplish Mod Related Activities as Evidenced.On 971007,licensee Did Not Evaluate Post Mod Test Acceptance Criteria for Measuring Total Air Flow ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML14181A3961997-12-0909 December 1997 EN-97-111:on 971212,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Identify Promptly & Correct Mispositioned EDG Output Breaker Switch ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML14181A9481997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:Reactor Trip Channels Had Not Been Calibrated IAW Formula Specified in TS 2.3.1.2.e IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A9001997-04-18018 April 1997 Notice of Violation from Insp on 970209-0322.Violation Noted:On 970224,during Performance of Special Process Procedure SPP-002,freeze Plugging of Piping Not Requiring Brittle Fracture Steps 7.3.3,7.3.8 & 7.3.9 Not Followed IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8541996-12-16016 December 1996 Notice of Violation from Insp on 960928-1116.Violation Noted:On 961016,operations Surveillance Test Procedure OST-160 Pressure Isolation Check Valve Back Leakage Test, Rev 23,inadequate,did Not Provide Adequate Instructions ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A8461996-10-25025 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Between 960917-19,shift Supervisors Assigned to Shifts Failed to Ensure That FMEA Controls Were Maintained in SFP Bldg While Fuel off-load Was Ongoing IR 05000261/19963011996-09-20020 September 1996 Exam Rept 50-261/96-301 on 960816-24.Exam results:14 SROs Passed & 1 Failed IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8151996-04-25025 April 1996 Notice of Violation from Insp on 960311-0404.Violation Noted:From 951128 to 960309,licensee Allowed Access to Protected Area Using Hand Geometry Sys W/O Having Conducted Tests to Ensure Equipment Met 90% Detection Probability ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training ML14182A2821996-03-12012 March 1996 Notice of Violation from Exam on 960209-15.Violation Noted: Licensee Failed to Take Adequate Corrective Action to Correct Deficiency Previously Identified ML14181A8041996-02-16016 February 1996 Notice of Violation from Insp on 960101-20.Violation Noted: Operating Procedure OP-402 Was Not Properly Implemented in That AFW-110 & AFW-111 Were Not Maintained Fully Open IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support ML14181A7991996-01-26026 January 1996 Notice of Violation from Insp on 960126-31.Violation Noted: PIC-012 Did Not Provide Adequate Instructions for Ensuring That Accumulator Level Properly Calibr IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function 1999-09-30
[Table view] |
Text
NOTICE OF VIOLATION Carolina Power and Light Company Docket No. 50-261 Robinson Nuclear Plant License No. DPR-23 EA 98-043 During an NRC inspection conducted on January 5-9, 1998, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedures for NRC Enforcement Actions," NUREG-1600, the violation is listed below:
A.
10 CFR 50, Appendix B. Criterion XVI requires that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.
Contrary to the above, as of April 7, 1997, the licensee failed to correct conditions adverse to quality associated with instrument sensing line slope deficiencies documented in CP&L letters to NRC dated September 14, 1994, and February 21, 1996,
Subject:
Reply to a Notice of Violation for NRC Inspection Report numbers 50-261/94
)
17 and 95-30.
This is a Severity Level IV violation (Supplement I).
B.
10 CFR 50.46(a)(3)(ii) requires each significant change to or error discovered in an acceptable evaluation model or in the application of such a model that affect the peak cladding temperature calculation, be reported to NRC within 30 days.
Significant change or error is defined in 10 CFR 50.46(a)(3)(I) as one that results in a peak cladding temperature different by more than 500F from the temperature calculated for the limiting tran sient using the last acceptable model.
Contrary to the above; the licensee failed to report a significant change in peak cladding temperature from 2006 0F to 2064F, as calculated on April 24. 1996, to the Commission between May 24, 1996, and October 14, 1996.
This is a Severity Level IV violation (Supplement I).
C.
10 CFR 50.59, "Changes: Tests, and Experiments" provides in part, that the licensee may make changes in the facility or procedures as described in the safety analysis report (SAR) without prior Commission approval, unless the proposed changes involves an 9802170036 980206 PDR ADOCK 05000261 G
PDR
2 unreviewed safety question. The licensee shall maintain records of the changes to the extent that the changes constitute a change as described in the SAR. These.records must include a written safety evaluation which provides the basis for the determination that the change does not involve an unreviewed safety question.
Contrary to the above, as of April 7, 1997, the licensee failed to perform a safety evaluation which provided the basis for the determination that a change to the facility did not involve an unreviewed safety system. Specifically., the 50.59 Safety Evaluation Screen performed on March 7, 1996, to address replacement of motor pinions and worm shaft clutch gears for Valves RHR-744 A & B, under Engineering Service Request 9600012, was inadequate. The activity resulted in increasing the motor operator valve stroke times beyond the ten seconds specified in UFSAR Section 6.3.2.2.12 and thus resulted in a change to the facility described in the UFSAR and no safety evaluation was performed. The modifications to the valves which increased the stroke times beyond ten seconds were implemented in 1996.
This is a Severity Level IV violation (Supplement I)
D.
10 CFR 50.9 (a) requires, in part, that information required by statute or by the Commission's regulations, order, or license condition to be maintained by the licensee shall be complete and accurate in all material respects.
UFSAR Section 8.3.1.3 states that control cables are separated into two basic channels as required for redundant circuits. Cables assigned to these channels for separation are required to be in their respective channels from the beginning of the cable to the final termination.
Contrary to the above, as of May 25,-1997, safety injection pump C autostart cable C2239C and manual cable C2239D were in the same channel (cable tray) as the SI pump A autostart cable C2237D and the SI pump B (train A line up) autostart cable C2891C. The information the licensee provided to NRC in the UFSAR was not accurate.
This is a Severity Level IV violation (Supplement I)
Pursuant to the provisions of 10 CFR 2.201. Carolina Power and Light Company is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, Region II..and a copy to the NRC Resident Inspector at the Robinson facility, within 30 days of the date of
.the letter transmitting this Notice of Violation (Notice). This reply should
3 be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation or severity level, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.
If you contest this enforcement action, you should also provide a copy of your response to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001.
Under the authority of Section 182 of the Act, 42 U.S.C. 2232, this response shall be submitted under oath or affirmation.
Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should-not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response.that identifies the information that.should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you week to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Dated at Atlanta, Georgia this 6th day of February 1998